ML20215C829

From kanterella
Jump to navigation Jump to search
Revised Pages to Monthly Operating Rept for Mar 1986
ML20215C829
Person / Time
Site: Columbia 
Issue date: 03/31/1986
From: Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17278B028 List:
References
NUDOCS 8610100466
Download: ML20215C829 (2)


Text

,, _ _ _ _ _ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _ _ _ _

r, R: Port Period MAR 1986 UNIT SHUTD0HNS / REDUCTION 5 MMMMMMMMMMMMMMMMMMMMMMMMMMMMEMMMMMMM M

HASHINGTON NUCLEAR 2 M

MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM

_Fo.

Date Typ Hours Rena2n Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 85-02P 07/01/85 F

0.0 A

5 CB PUMPXX P0HER OUTPUT LIMITED TO 72% DUE TO THE INOPERABILITY OF

'B' RRC PUMP.

86-01 03/14/86 F

16.2 G

3 86-003 RB INSTRU REACTOR SCRAMED AT 51% PONER DURING THE PREFORMANCE OF THE AVERAGE POWER RANGE MONITORING (APRM)

CHANNEL SURVEILLANCE.

THE HRONG APRM CHANNEL HAS INADVERTENTLY PLACED IN A TEST MODE AND LOGIC NOT RESET HHICH SUBSEQUENTLY CAUSED THE SCRAM.

86-02 03/15/86 5 381.7 F

9 UNIT REMAINED OFFLINE FOR LACK OF P0HER DEMAND.

86-03 03/31/86 S

24.0 C

9 UNIT ENTERED REFUELING / MAINTENANCE OUTAGE.

I MMMMMMMMMMM i

M

SUMMARY

M HNP-2 EXPERIENCED 2f 00TAGEf AND 1 P0HER REDUCTION IN MARCH.

MMMMMMMMMMM Ivre Reassn Method Svstem a Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F 8 H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Rofueling H-Other 3-Auto Scram Preparation of D-Rogulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (NUREG-0161)

PAGE 2-389 R

~

DOCKET N0.

50-397 LNIT HAME jP-2 DATE 1/86 LNIT SIUTDOWNS / REDUCTIONS COMPLETED DY LB llutchison.

REfulT PERIOD MARCH 1986 TELEPI D E (509)377-2486

nmth, year W ITAT 'IYPE THIM ITEK5DR HETFM Uff FUCElf SYSTEN N CAUSE & C0lVtECTIVE ACTION 'l0 fREVENT flECLAVIEN 85-02P 7/1/85 F 0

A 5

CB PUMPXX POWER OUTPUT LIMITED TO 72% DUE TO THE IN0PERABILITY OF "B" RRC PUMP 86-01 3/14/86 F 16.2 G

3 86-003 RB INSTRU REACTOR SCRAMED AT 51% POWER DURING THE PERFORMANCE OF THE AVERAGE POWER RANGE yT MONITORING (APRM) CHANNEL SURVEILLANCE.

THE WRONG APRM CHANNEL WAS INADVERTENTLY PLACED IN A TEST MODE AND LOGIC NOT RESET WHICH SUBSEQUENTLY CAUSED THE SCRAM.

86-02 3/15/86 S 381.7 F

9 UNIT REMAINED OFF LINE DUE TO A LACK 0F POWER DEMAND 86-03 3/31/86 S 24 C

9 q

UNIT ENTERED REFUELING / MAINTENANCE OUTAGE.

$<e 4

c I-l l SLRtlARY l WNP-2 OPERATED AT A REDUCED POWER LEVEL UNTIL THE FORCED OUTAGE OF 3/14/86.

THE PLANT WAS ON RESERVE SHUTDOWN 3/15 THROUGH 3/30 WITH REFUELING & MAINTENANCE OUTAGE STARTING 3/31/86.

TYPE REASDN NETHCD SYSTEM & COMP 0 TENT F-Forced A-Equip Failure

. F-Admin 1-Hanual Exhibit F & H S-f,clxx1 D-Maint or Test G-Oper Error 2-4tanual Scran Instructions for C-Ilerueling H-Other 3-Auto Scram Preparation of D-Rc0ulatory llestriction 4-Continued Data Entry Sheet E-Operator Training 9-Other (LER) File (Nl#1EG-0161) 5-Reduced Load Licensee Event fleport

& License Exanination

~

-