ML20215B709

From kanterella
Jump to navigation Jump to search
Confirms That Currrent Plant Tech Specs Require Leak Rate Testing of Pressure Isolation Valves
ML20215B709
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/11/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
161-00279-JGH-J, 161-279-JGH-J, GL-87-06, GL-87-6, NUDOCS 8706170417
Download: ML20215B709 (1)


Text

b d

Arizona Nuclear Power Project P.o. BOX 52034 e PHOENIX, ARIZONA 85072-2034

)

June 11, 1987 161-00279-JGH/JMQ

,l U.~S. Nuclear Regulatory Commission Attention: Document Control Desk l

Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

I i

Units 1, 2 and 3 Docket Nos. STN 50-528 (License NPF-41) i STN 50-529 (License NPF-51)

STN 50-530 (License NPF-65)

Generic Letter 87-06 Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves.

File: 87-010-026

Reference:

Letter from H. R. Denton, NRC, to all holders of Operating Licenses dated March 13, 1987.

Subject:

Generic Letter 87-06.

Dear sir:

The referenced letter requested confirmation that the current plant Technical Specifications require leak rate testing 'of Pressure Isolation Valves (PIVs).

'All the PIVs are identified and required to be tested per PVNGS Technical Speci-fication 3.4.5.2.

1 4

Very truly yours, q

i J. G. Haynes Vice President l

Nuclear Production

)

JGH/JMQ/1s cc:

0. M. De Michele E. E. Van Brunt, Jr.

A. C. Gehr H. R. Denton j\\D[

r

~

8706170417 B'70611 PDR ADOCK 05000528 p

g P

PDR-g i