ML20215B709
| ML20215B709 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/11/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 161-00279-JGH-J, 161-279-JGH-J, GL-87-06, GL-87-6, NUDOCS 8706170417 | |
| Download: ML20215B709 (1) | |
Text
b d
Arizona Nuclear Power Project P.o. BOX 52034 e PHOENIX, ARIZONA 85072-2034
)
June 11, 1987 161-00279-JGH/JMQ
,l U.~S. Nuclear Regulatory Commission Attention: Document Control Desk l
Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
I i
Units 1, 2 and 3 Docket Nos. STN 50-528 (License NPF-41) i STN 50-529 (License NPF-51)
STN 50-530 (License NPF-65)
Generic Letter 87-06 Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves.
File: 87-010-026
Reference:
Letter from H. R. Denton, NRC, to all holders of Operating Licenses dated March 13, 1987.
Subject:
Dear sir:
The referenced letter requested confirmation that the current plant Technical Specifications require leak rate testing 'of Pressure Isolation Valves (PIVs).
'All the PIVs are identified and required to be tested per PVNGS Technical Speci-fication 3.4.5.2.
1 4
Very truly yours, q
i J. G. Haynes Vice President l
Nuclear Production
)
JGH/JMQ/1s cc:
- 0. M. De Michele E. E. Van Brunt, Jr.
A. C. Gehr H. R. Denton j\\D[
r
~
8706170417 B'70611 PDR ADOCK 05000528 p
g P
PDR-g i