ML20215B656

From kanterella
Jump to navigation Jump to search
Computer Program Verification
ML20215B656
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/19/1983
From: Prescott K
NUTECH ENGINEERS, INC.
To:
Shared Package
ML20215B645 List:
References
NUDOCS 8706170396
Download: ML20215B656 (18)


Text

fl

gy ,. 2 ,

z,f . .q r

.. % o l l File:- 08.027.0200 l

l COMPUTER PROGRAM VERIFICATION I STARDYNE-'3'DEC01/82A H LEVEL NCSI CYBER 730 PROGRAMS STAR,.DYNREl, DYNRE2, DYNRE4, DYNRE5, DYNRE6 AND. POST j l

l l

i 1

l I

'l Prepared by: Approved / Issued by:

' - . t .b- c. w K. S. Prescott T. Q' Wenner Reviewed by: l a'a in V. N. Anderson Date Issued.

n/n/ss  ;

l 8706170396 DR 870605  ? s ADOCK 05000368 PDR

]

.' a COMPUTER PROGRAM VERIFICATION DOCUMENT j i

1 STARDYNF-3 DEC01/82A H Level j Programs STAR,:DYNREl, DYNRE2, PROGRAM / VERSION: DYNRE4, DYNRE5, DYNRE6, and POST FILE NO: 08.027.0200 j The above-referencad program / version has been verified-inE accordance with QEP 3-5-and is valid for use in NUTECH's quality assurance-related work.

1 1

i

. l 1

VERIFICATION PROBLEM NUMBER 10-  !

1 Program Used. DYNRE4 Description of Problem s

Response spectra analysis of 360 degree vent system j model' with frequencies and eigenvectors input on 1 TAPE 4. Earthquake spectra is applied in three directions and combined by SRSS. Closely spaced modes ,

are combined using the 10 percent rule..

]

References APR02/82 DEC01/82A i

.I Job name AIIIFKF AIHQCNO Run date 12/05/82 11/03/83 Input (TAPE 4) VSN=A00186 VSN=A00186 l

1 e

9 1

STARDYNE-3 11

'j !

' 4[ -

.c VERIFICATION PROBLEM' NUMBER 11-Program-Used' DYNRES-Description of Problem" Generate response-spectra from displacement' time history

~

-input-on TAPE 54.

References APR02/82 DEC01/82A ,

Job name AIIIFTA AIHQCNR Run date 12/05/82 11/03/83.

Input (TAPE 54) VSN=A00187 VSN=A00187 l

l l

1 1

0 N

e e

STARDYNE 12 1

-a

y, ?, .

.~ u a  ;} ~

.,./

l-J VERIFICATION PROBLEM NUMBER 12 Program Used DYNhE6 s

Description'of Problem Dynamic analysis.of a simplified model1of an in-vessel storage rack with nonlinear gapEelements where the

. structure rests against:the vessel wall. An acceleration time history base acceleration load is applied in all three' global-directions.

I References APR01/82- DEC01/82A Job name AIHQJOE AIHOGVT-Run date 6/09/83 11/03/83 Input (TAPE 7). VSN=A02072 VSN=A02072 i

j i

?

STARDYNE-3 13

i l

i ENCLOSURE 5 EXCERPT FROM TMRSAP VERIFICATION REPORT 4

l 1

'As ENGINEERING SERVICES j 130 SECOND AVENUE j WALTHAM, MASSACHUSETTS 02254 fl N ,h[ ,lf y' { '5") 8' '8 5 "In i 2usca

'h 'If lf o ;9,qg- April 25, 1986 A600 En nN - gkm/t%nicatR E llCHT CD' l 1

Mr. Morris Byram Arkansas Public Power

~P.O. Box 551 '

FCB-9 l Little Rock, Arkansas, 72203 j l

Subject:

TMR-SAP Verification

Dear Sir:

Per your telecon with Mr. Lenin Semprucci, Principal Engineering for Teledyne Engineering Services, I have enclosed a copy of the first pages of the Verification Manual for our TMR SAP Computer Program. I hope this will be sufficient enough to assure you of"the verification of this program.

If you have any questions or need any futher information concerning this program please contact me at your convenience.

Yours truly, TELEDYNE ENGINEERI.F 'ERVICES Donald Messinger Manager, Quality Assurance s

DM:mid attachment j I

ENGINEERS AND METALLURGISTS