ML20215B075
| ML20215B075 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/23/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20215B079 | List: |
| References | |
| NUDOCS 8610060356 | |
| Download: ML20215B075 (2) | |
See also: IR 05000321/1986025
Text
-
Q>4c -2 c .4
..
C: w
'
,
sEP 231988
Docket Nos. 50-321, 50-366
Georgia Power Company
, ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT N00. 50-321/86-25 AND 50-366/86-25
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. Holmes-Ray on August 1 - August 29, 1986. The inspection included a review of
activities authorized for your Hatch facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
1
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved item identified in the inspection report.
This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
-
.
Ori9w & cL (s y
e61oo60336gg[o$$21
b #'
ADOCK
Virgil L. Brownlee, Chief
G
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
(ccw/ encl: See page 2)
' '
TGOl
,
..
.
..
.
.
'
'
SEP 231986
-
Georgia Power Company
2
cg w/ enc 1:
tr. P. O'Reilly, Senior Vice President
. Nuclear Operations
J. T. Beckham, Vice President and
General Manager-Nuclear Operation
M. C. Nix, Site General Manager
LA. Fraser, Acting Site QA Supervisor
p.Gucwa, Manager,NuclearSafety
and Licensing
bec w/ enc 1:
hRC Resident Inspector
@gh S. Jordan, Executive Secretary
Document Control Desk
State of Georgia
RII
AI natonis:jw
9/
86
.