Forwards Safety Insp Rept 50-271/86-22 on 860904-1103.No Violations Noted
ML20214X417
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/05/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20215A002 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8612110118
Download: ML20214X417 (2)


See also: IR 05000271/1986022

Text

ri

,

o

.c ,

.

DEC 0 51986

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont

~05301

Gentlemen:

Subject:

Inspection Report No. 50-271/86-22

This refers to the routine resident safety inspection. conducted by Mr. W. J. Raymond

of this office on September 4 - November 3, 1986, at the Vermont Yankee Nuclear

Power Station, Vernon, Vermont. The inspection findings were based on observation

of activities, interviews with personnel and document reviews.

The results of the

inspection are described in the NRC Region I Inspection Report enclosed with this

letter and were discussed with Mr. J. P. Pelletier of your staff at the conclusion

of the inspection.

The inspector also reviewed the actions described in your letter dated October 16,

1986, in response to our letter dated September 16, 1986, to correct the violation

concerning the failure to satisfy the technical specifications surveillance re-

quirements for the standby liquid control system.

We have no further questions

regarding your corrective and preventive actions at this time.

Within the scope of this inspection, no violations were identified and no response

to this letter is necessary.

Your cooperation with us is appreciated.

Sincerely,

yriginal Signed 373

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-271/86-22

$$

kN

1

O

s\\>#

.

~ . ' *

-

s.

.

Vermont Yankee Nuclear Power

2

Corporation

DEC 0 51986

cc w/ encl:

Mr. R. W. Capstick, Licensing Engineer

Mr. J. Gary Weigand, President and Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. Donald Hunter, Vice President

Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.

Mr. Gerald Tarrant, Department of Public Service

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Hampshire

State of Vermont

NRC Resident Inspector

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

DRP Branch Chief

R. Bellamy, DRSS

M. McBride, SRI, Pilgrim

H. Eichenholz, SRI, Yankee

V. Rooney, LPM, NRR

Robert J. Bores, DRSS

.BI: DRP

RI:DJ

R

W

'

Naymond/meo

R

Els ser

r

.

'f//h

M4

/^

i

OFFICIAL RECORD COPY