Further Response to Appeal of Denial of FOIA Request for Comanche Peak Task Force Documents.Info Continues to Be Withheld (Ref FOIA Exemption 4)
ML20214X231
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/11/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
References
FOIA-85-59, FOIA-86-A-100 NUDOCS 8706160387
Download: ML20214X231 (1)


Text

, - .-. .- _.. . -. -- . . . - - .-

[Y6

['$"l*

t

' UNITED STATES NUCLEAR REGULATORY COMMISSION

< g j WASHINGTON, D. C. 20806

%,.... /

JUN 111987 Billie Pirner Garde, Esquire

. Government Accountability Project Midwest Office IN RESPONSE REFER 104 E. Wisconsin Avenue TO F01A-86-A-100

Appleton, WI- 54915-8605 (F0IA-85-59) i

Dear Ms. Garde:

This is in further response to your letter dated June 26, 1986, in which L you appealed Mr. Donnie H. Grimsley's letter dated May 28, 1986.

Mr. Grimsley's letter denied documents in whole or _in part that were subject to your Freedom of Infonnation Act (F0IA) request for documents related to the NRC Comanche Peak Task Force.

My letter to you, dated May 8, 1987, stated that the NRC was contacting the originator of a document concerning a proprietary claim. The response from General-Electric has been received and reviewed, and I f

, have determined that the previously withheld information will continue to be withheld from public disclosure pursuant to Exemption (4) of the

~

F0IA (5 U.S.C. 552(b)(4)) and 10 CFR 9.5(a)(4) of the Conunission's regulations. Your appeal is, therefore, denied.

Document U-12 provides an analytical model for the determination of potential boiling water reactor fuel movement from a combined safe shutdown earthquake and loss-of-coolant accident svent, as well as an engineering-evaluation of the loadings on the fuel from such a combination of individual events. General Electric considers'this type of information

as consnercial information (proprietary) the disclosure of which would harm its competitive position. This information has been held in confidence by General Electric and was provided to the NRC in confidence. ,

This is a final agency action. As set forth in the F0IA (5 U.S.C.

! 552(a)(4)(B)), judicial review of this decision is available in a '

district court of the United States in the district in which you reside

or have your principal place of business or in the District of Columbia.

i j Sincerely, ,

i

. , - [ D /

y l Executive Director for Operations 8706160387 870611 PDR FOIA j GARDE 86-A-100 PDR l

  • ~

MAY 2 81986 Docket Nos. 50-445/50-446 Ms. Billie Pirner Garde Director, Environmental Whistleblower Clinic Government Accountability Project-1555 Connecticut Avenue, NW, Saite 202 IN RESPONSE REFER Washington, DC 20036 TO FGIA-85-59

Dear Ms. Garde:

This is in further response to your letter dated January 21, 1985, in which you requested, pursuant to the Freedom of Information Act (FOIA), records related to the NRC Comanche Peak Task Force established in March 1984.

We are now placing two boxes of records (boxes 11 and 12) in the QA/QC category in the NRC Public Document Room (PDR) in file F01A-85-59 under your name. In particular, with the exception of three records indicated by asterisks on the enclosed Appendix T, which are undergoing further staff review, we are making available for public inspection and copying at the PDR the 131 records listed on the enclosed Appendix T and the 130 records listed on the enclosed Appendix U.

The records identified at number 34 on Appendix T and number 42 on Appendix U contain information that is being withheld from public disclosure pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the-Commission's regulations. The withheld portions contain the advice, opinions, and-recomendations of the staff concerning potential violations. The record identified at number 12 on Appendix U contains information that is being withheld from public disclosure pursuant to Exemption (4) of the F0IA (5 U.S.C. 552(b)(4))

i and 10 CFR 9.5(a)(4) of the Commission's regulations because it is comercici

, information which was provided in confidence to the NRC. The nonexempt portions of these records are being placed in POR file F0!A-85-59 under your name.

Portions of the records identified at numbers 4 through 14, 17 through 19, 22 through 24, 26 through 28, 30 through 33, 35, 36, and 127 of Appendix T and

numbers 2 and 3 of Appendix U are being deleted without invocation of an FOIA exemption in accordance with the agreement reached between you and the NRC staff

, at a meeting on May 8, 1985. .The information deleted consists of names, personal information, and identifying details concerning allegers, interviewees, and l other individuals.

Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld pursuant to Exemptions (4) and (5) of the F0IA is exempt from production or disclosure and that its production or disclosure ts contrary to the public interest. The persons responsible for this denial are the um!crsigned and Mr. Harold R. Denton, Director, Office of Nuclear l Reactor Regulation.

_r pwvu

Ms. Garde This denial may be appealed to the Executive Director for Operations within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."

A separate set of the released records is being made available for public inspection and copying at the Local Public Document Room (LPDR) located at the University of Texas Library,170 South Cooper Street, Arlington, Texas.

Additional boxes of records subject to your request are currently under review and will be placed in the PDR and LPDR in the coming weeks.

Sincerely, nnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated DISTRIBUTION:

DRR S/F DRR R/F Norry

Schomaker PDR Robinson

. Bartlett Souder LPDR Noonan Smith

Poslusny Vietti
Chandler l Treby Trannell l Cawley Early Meyer

> /e OFC :ADM:DRR p. :LPDR :0 :NRR

.....:......gh:ADM:DR .... .

ADMp

.... . . . . . . . : . .gf ..: yI......::t

'f .

RF,

<- .......:.7...l.....

F Smi h

. . . . . : . . . . . . :LRo NAME':JCawley:jj

. . . i. . . :: . :.DGrimsley. . . . . . . .:JSouder .E homaker DATE :05/21/85 :05/JT86 :05/o/86 :05/1//86 :05/W86 :05A_/B,6 :05/ 7/86 f

0FFICIAL RECORD COPY

i .

Re: F01A-85-59 Appendix T Box 11 - QA/QC Date Title 'Page 1.- 7/16/82 US NRC Testimony of Alleger 94 Witness for Intervenor CASE (In POR-ANO 8207200406)

2. 11/28/83 CASE letter to Administrative 1 Judge Peter B. Bloch - Dr.

Walter H. Jordan - Dr. Kenneth A. McCollom from CASE -

Subject:

Affidavits of-Allegers (InPDR-ANO 8312010366)

3. 11/28/83 US NRC CASE's Answer to Board's 150 10/25/83 Memorandum (Procedure Concerning Quality Assurance)

(InPOR-ANO 8312010089)

4. 12/9/83 Brown & Root - Employee / Alleger 1
5. 8/6/82 Comanche Peak Nonconformance 3 Report
6. 8/13/82 Memo to William Rice from 30 H. C. Dodd Jr.,

Subject:

Brown & Root Management investi-gation in Response to August 6, 1982 complaint of Alleger (ComanchePeakNuclearPowerPlant)

- - - - - . . , . - , . , , - - - - - , --n.n ,-.-.-- ,,-.----,----.--,.,,--e,, . -- ,--- -- ,-. +, . - - -

? .

7. 8/17/82 Memo to W. M. Rice 7 from H. C. Dodd,

Subject:

Additional A11eger Concern on Swipe testing in pressurizer

8. 8/17/82 Memo to W. M. Rice 12 from H. C. Dodd,

Subject:

Investigation of A11eger Concerns

9. 8/17/82 Memo to W. M. Rice 1

Subject:

Investigation of A11eger Concerns

10. 8/17/82 Memo to W. M. Rice 3 from H. C. Dodd 4-

Subject:

Enclosed Investigation Report on Complaint of A11eger

11. 9/2/82 Memo to D. N. Chapman 5 from O. L. Anderson

Subject:

Investigation of Allegations

12. Deleted Brown & Root Letter of Dis- I crepancies noted in the operations of the Millwright Tool Room
13. Deleted Brown & Root Duties of the ,1 M111 wright Departments' Tool

. room Attendant 2

l.

t

14, 12/10/82 Texas Utilities Generating Co. 1 Memo to D. N. Chapman from Antonio Vega,

Subject:

Telephone Conversation with Alleger 15, 2/15/83 Letter TUGC0 60 to R. J. Gary from G. L.

Madsen - SIT Team Report (InPOR-ANO 8302250237) 16, 2/28/84 Letter TUGC0 to R. J. Gary 9 from E. H. Johnson (In POR-ANO 8403130183)

17. 4/9/84 Interview with site QA Manager 27
18. 4/12/84 Name and Key Additional 9 Information for Appendix A Inspectors
19. 9/10/84 US NRC Memo to TRT Leaders 3 from Thomas A. Ippolito

Subject:

References in SSER

20. 10/10/84 TUGC0 Letter to M. D. Spence 9 from Richard L. Bangart (InPOR-ANO 8411130488) 21, 4/25/83 Certificate of Proceedings-Hearing Transcript 72 (In POR-Hearing File)
22. No date Brown & Root Letter - 2 Attachment A
23. 12/18/82 Statement of A11eger 1 24, 12/18/82 Statement of A11eger 1
  • 25. 3/13/84 US NRC Report of Inquiry 3 3

26, 7/17/84 Allegations-List- 3

27. 7/18/84 List of Allegers - Mechanical 10

& Piping

28. 9/10/84 CP Allegations Chart, Addendum 4 13
  • 29. No date US NRC Confidential Interview 56
30. No date Sumary of Deposition Exits 2
31. No date Summary of Deposition Exits 2
32. No date Comanche Peak Nuclear Power 2 Plant Allegations and/or Investigations sumary - table
33. No date Comanche Peak Nuclear Power 2 Plant Allegations and/or Investigations sumary - table
34. No date Allegation A-3 2
35. No date List of Allegers for Interviews 2 Mechanical & Piping
36. No date Allegers Background 29
37. 10/10/78 Construction Operation traveler 3 Traveler # ME 78-108-1101
38. 1/25/79 US NRC Memo for D. B. Vassallo 2 from G. W. Reinmuth,

Subject:

Classification of Spent Fuel Pool Liner Plates (AITS F 12193H1)

(AITS F30382H1) 4

r

39. 4/2/81 Construction Operation Traveler 13 Continuation #ME-81-1562-1101 ,

40, 9/3/81 Brown & Root Notegram 1 to Jim Starkey

41. 8/10/82 Brown & Root Notegram 1 to George Tanley -

42, 8/10/82 CPSES - Nonconformance Report 8 NCR# M-82-01178

43. 9/16/82 System Cleanliness Plan Cover 8 Sheet XCP-ME-4 Revision 5
44. 7/25/83 TUSI CPSES Ductwork Evaluation 178 of Nonconforming Welds - Summary Report - Available in the POR
45. 12/1/83 Handwr'itten Notes.- Traveler 1 ME-80-2008-4000
46. 12/9/83 Startup Work Authorization - 1 Attachment C f
47. 1/10/84 TUGC0 Letter to E. H. Johnson 2 from R. J. Barry
48. 2/29/84 Notes on Neutron detector 1
49. 3/26/84 TUGC0 telephone directory 9
50. 4/4/84 Containment Performance Working 212 Group Containment Leak Rate Estimates fourth draft 5
51. 4/4/84 Containment Performance Working 197 Group Containment Leak Rate Estimates fourth draft
52. 5/14/84 McGraw Hill Report - Inside NRC 6
53. 6/5/84 Technical Review Team Guidance 18 Appendix 0
54. 6/5/84 Technical Review Team Guidance 18 Appendix 0
55. 6/5/84 Technical Review Team Guidance 18 Appendix 0
56. 6/5/84 Technical Review Team Guidance 18 Appendix 0
57. 6/5/84 Technical Review-Team Guidance 18 Appendix 0
58. 6/5/84 Technical Review Team Guidance 18 Appendix 0
59. 6/5/84 Technical Review Team Guidance 18 Appendix 0
60. 6/5/84 Technical Review Team Guidance 17
61. 6/5/84 ,

Technical Review Team Guidance 18

62. 6/5/84 Technical Review Team Guidance 18
63. 6/5/84 Technical Review Team Guidance 18 6

. s

64. 6/5/84 Technical Review Team Guidance ~ 18
65. 6/5/84 Technical Review Team Guidance 18
66. 6/5/84 Technical Review Team Guidance 18
67. 6/5/84 Technical Review Team Guidance 18
68. 6/5/84 Technical Review Team Guidance 18 s
69. 6/5/84 Technical Review Team Guidance 18
70. 6/5/84 Technical Review Team Guidance 19 71, 7/1/84 Re, vision 1 Comanche, Peak Plan 16 for the completion'of Outstanding Regulatory Actions .,

a

72. 7/1/84 Revision 1 Comanche Peak Plan 16 for the completion of Outstanding Regulatory Actions
73. 7/1/84 Revision 1 Comanche Peak Plan 16 t.

for the completion of Outstanding I "'

Regulatory Actions  : ,

74. 7/1/84 Revision 1 Cor.anche Peak Plan 32 for the completion of Outstanding

^

Regulatory Actions

75. 7/1/84 -

Revision 1 Comanche Peak Plan 16 for the completion of Outstanding R'egulatory Actions 7

76. '7/10/84 Employee Listing 'l'
77. 7/10/84 Employee Listing 1
78. 7/10/84 Mechanical & Piping 3 Allegation Review Categories-
79. 7/13/84 Mechanical & Piping 5 Allegation Review Categories
80. 7/17/84 Status Report - Mechanical 4 Piping
81. 7/17/84 No title '- Handwritten notes 1
82. 7/18/84 Handwritten report No title #6 2
83. 7/18/84 Handwritten report No title #7 2 84.. 7/18/84 Handwritten report No title #17- 3
85. 7/18/84 = Status Report - Mechanical / 4 Piping area
86. 7/18/84 Comanche Peak Open Issue Action 1 Plan j 87. 7/18/84 Comanche Peak Open Issue Action 1 i Plan l 88. 7/19/84 Mechanical Piping 1
89. 7/20/84 Mechanical & Piping Allegation 4 Review Categories i 90. 7/30/84~ SSER Writeup Format 1 L

8 i

i 91.'8/6/84 Ne title handwritten notes 1

92. 8/8/84 Comanche Peak Abbreviations 4
93. 8/9/84 Summary of Comanche Peak 96 Open Issues - Control #7
94. 8/10/84 CPSES Telephone Directory 54
95. 8/23/84 As-built Inspection Program 6 Audit
96. 8/30/84 TRT Employee Chart 1
97. 9/7/84 US NRC Note for H. Livermore 16

- L. Shao R..Bangart from Annette Vietti

98. 9/10/84 US NRC Memo for Technical 2 Review Team Leaders from Thomas A. Ippolito,-

Subject:

References in SSER Writeups 99 .- 9/12/84 TUGC0 Memo to John Finnerman from A. Vega,

Subject:

I. E. Bullilen 79-14 100. Oct 84 Comanche Peak Completion of 7 Outstanding Regulatory Actions Chronology - 5 complete copies

  • 101.No date -

US NRC - Confidentiality 32 Agreement 102. No date Task & Discipline Codes - 1 Appendix 6 9

103. No date Comanche Peak Open Issue Action 2 Plan #7 104. No date Comanche Peak Open Issue Action 2 Plan #6 105. No date Comanche Peak Open Issue Action 2 Plan.#17 106. No date Comanche Peak Open Issue Action 1 Plan #18 107. No date Comanche Peak Open Issue Action 1

' Plan #19 108. No date Comanche Peak Open Issue Action 1 Plan #20 109. No date Comanche Peak Open Issue Action 1 Plan #22 110. No date Comanche Peak Open Issue Action 1 Plan #23 i

111. No date Comanche Peak Open Issue Action 1 Plan #24 L

i 112. No date Comanche Peak Open Issue Action 1 i

Plan #25 113. No date Comanche Peak Open Issue Action 1 Plan #26 114. No date Comanche Peak Open Issue Action 1 l

l Plan #27 l

l l

10

1115. No date Comanche Peak Open Issue Action 1 Plan #28 116. No date Comanche Peak Open Issue Action 1 Plan #29 117. No date Comanche Peak Open Issue Action 1 Plan #30 118. No date No title handwritten notes 1

^

119. No date No title handwritten notes 1 120. No date QA/QC Allegation Review 12 Categories 121. No date QA/QC Allegation Review 15 Categories 122. No date Allegation Group #9 7 123. No date Figure E-1-CPSES Work & Records 1 Flow Process 124. No date NRC Technical Review team 2 125. No date Mechanical & Piping Allegation 3 l Review Categories

--126. No date ,

Engineering - Operations 7 Interface CPSES - Org. Charts 127. No date Employee Telephone Listing 3 l

11

, ~ , ,

128. No ..'date Note's_--No title Handwritten-- 1

-129.-No.date-

. No title page of report 77-13 ~ 1 130.'.No date Attachment to traveller- c1

. ME80-2008-4000 131. No:date First Draft: Severe' Accident 54

' Program Description 4

8 9

b r

12 i- -

Re: F01A-85-59 APPENDIX U Box 12 - QA/QC Description Page

1. 2/22/84 Memo with attachment ^o: John Larkins 46 and Bill Farmer (NRC) from: W. H. McCulloch (SNLA)Re: Transmittal of Ice Condenser Equipment Survivability Report
2. No Date Signout sheet for Depositions 1
3. No Date Creating the Signon Document 41
4. No Date Before the Atomic Safety and Licensing 33 Board " Case's Partial Statement of Material Facts as to which there is no Genuine Issue Regarding the Upper Lateral Restraint Beam"
5. No Date Before the Atomic Safety and Licensing 12 i

Board, " Case's Answer to Applicants'

-Statement of Material Facts as to which there is no Ge~nuine Issue Regarding Consideration of Local Displacements and Stresses"

.Before the Atomic Safety and Licensing

~

6. No Date 41 Board " Case's Partial Answer to Applicants' Statement of Material facts as to which there is no Genuine Issue Regarding Allegations Concerning Consideration of Force Distribution in Axial Restraints" l
7. No Date Before the Atomic Safety and Licensing 31 Board, " Case's Partial Answer to Applicants' Statement of Material Facts as to which there is no Genuine Issue Regarding Safety Factors"
8. No Date Before the Atomic Safety and Licensing 40 Board, " Case's Partial Answer to Applicants' Statement of Material Facts as to which there is no Genuine Issue Regarding Applicants' use of Generic Stiffnesses Instead of Actual Stiffnesses in Piping Analysis"
9. No Date Before the Atomic Safety and Licensing 11 Board, " Case's Partial Answer to Applicants' Statement of Material Facts as to which There is no Genuine Issue Regarding Differential Displacement of Large-Framed, Wall-to-Wall and Floor-to-Ceiling Piping Supports"
10. 8/29/84 Case ltr to NRC,

Subject:

Case's Partial 5 Answer to Applicants' Motions for Summary Disposition

11. 9/10/84 Case 1tr to NRC,

Subject:

Case's 172 Answer to Applicants Motion for Sunnary Disposition Regarding Richmond Inserts l

12. July 82 General Electric Report, BWR Fuel Assembly 75 Evaluation of Combined SSE and LOCA Loadings (Amendment No. 3)
13. 10/25/82 ASME ltr to Zoltan Rosztoczy- 1 Re: Form to be completed by prospective members.
14. 11/24/82 ASME ltr to the Subcommittee on- 68 Qualification of Nuclear Plant Equipment

Subject:

Letter-Ballot #6 N551-2

15. 12/16/82 Seismic Risk Sensitive Study 28 (Presented to: R. H. Vollmer, U.S.

Nuclear Regulatory Comission)

16. 1/20/83- NRC memorandum for: Division of Engineering 4 Thru: William V. Johnston From: Victor Benaroya

Subject:

Proposed Response for UCS Letter Dated January 5, 1983 17, 1/26/83 Seismic and Dynamic Qualification 108 of Safety Related Electrical and Mechanical Equipment in Operating Nuclear Power Plants by: John Curreri Structural Analysis Division Department of Nuclear Energy Brookhaven National Laboratory (DraftReport)-

18. 1/27/83 Brookhaven National Laboratory 9 Memorandum from A. Azam to J. Boccio

Subject:

BNL Coments to Peer Review of Seismic Report 4

.e

19. 3/16/84 NRC Memorandum for: Richard H. 3 Vollmer Thru: James P. Knight From: George Lear,

Subject:

Comments Concerning CRGR Package For the Proposed Resolution of-USI A-46, " Seismic Qualification of Equipment in Operating Plants"

20. ~3/19/84 Severe Accident Meeting Schedule 1
21. 3/20/84 Standard Order for DOE Work 3
22. 4/11/84 Telephone Directory Comanche Peak 65 Steam Electric Station-

'23. 7/20/84 Comanche Peak List of Allegations 28

24. 7/24/84 NRC Memorandum for File From E. H. Johnson 1

Subject:

Alleged Poor Construction Practices - Comanche Peak 4-83-A

25. -8/10/84 Telephone Directory _

54 Comanche Peak Steam Electric Station

26. 8/20/84_ Technical Review Team 3 Third Session (orig. Chart)
27. 9/4/84 Bishop, Liberman, Cook, Purcell & 6 Reynolds ltr to William L. Clements Re: Texas Utilities Electric Co. et al.

(NRC) Comanche Peak Steam Electric

. Station (Units 1 and 2) Docket No.

50-445-2 and 50-446-2 n .. . - , . - . . - , .

28. 9/10/84 NRC Memorandum For: Technical 2 Review Team Leaders From: Thomas A.

Ippolito

Subject:

References in SSER Writeups

29. 9/10/84 Draft 4 Comanche Peak Abbreviations 5
30. 9/21/84 Technical Review Team fifth session 2
31. No Date Figure 5 Comanche Peak Allegations 1 Resolution Schedule
32. No Date General Employee Training 64 (Comanche Peak Steam Electric Station)
33. No Date Sumary of Coments on BNL Draft 2 Report Cost / Benefit Study
34. No Date Peer Review: Major Topic Breakdown 1
35. No Date Status of NRC Safety Concerns 23 Regarding Possible Reactor Coolant Pump Seal LOCAs Following Los of Seal Support Functions
36. 9/17/84 Texas Utilities Generating Co. ltr to NRC 3 Re: Comanche Peak Steam Electric Station Units 1 and 2 Welding Allegations Add'itional Response File No. 10066.5
37. 7/26/84 Inspection Report, Docket: 50-445/84-18 14 (InPDR) i I-l l-

l

. i

38. 7/26/84 Inspection Report, Docket: 50-445/84-08 17 50-446/8404 (In PDR)
39. 7/26/84 Inspection Report, Docket 50-445/84-20 11 (In PDR)
40. 7/30/84 Inspection Report, Docket 50-445/84-15 15 (In PDR)
41. 9/18/84 Inspection Report, Docket 50-445/84-30 4 Hilti Bolt (In PDR)
42. 6/28/84 SSER Civil / Structural Revision 2 8 43, 2/15/83 Inspection Report Dockets 50-445/82-26 55 50-446/82-14 44, 4/20/83 Review Package CC-X-116-709-A75C 18
45. 5/5/83 As-built drawing Pkg, 18 Brown and Root 46, 5/18/84 Before the Atomic Safety and Licensing 122 Board. " Applicants' Motion for Summary Disposition Regarding the Effects of GAP on Structural Behavior Under Seismic Loading Conditions" 47, 6/5/84 Technical Review Team Guidance June 1984 18
48. 7/10/84 TRT Reviewer Comments 1 i

l

[

i l

l l

7-

49. 8/13/84 Before the Atomic Safety and Licensing 127 Board, " CASE's Answer to Applicants' Motion for Summary Disposition Regarding the Effects of GAPS on Structural Behavior Under Seismic Loading Conditions"
50. 8/28/84 Request for copies with Dwgs 5
51. No Date Index of Comanche Peak Operating 57 Licensing Proceeding
52. No Date Comanche Peak Nuclear Power Plant 1 Allegations and/or Investigations Summary
53. No Date Figure E-1. CPSES Work and Records 1 Flow Process
54. No Date Figure 5. Comanche Peak Allegations 1 Resolution Schedule
55. No Date Technical Review Team Org, Chart 1
56. No Date Mechanical ~and Piping Allegation Review 5 Categories (List of Allegations)
57. No Date NRC-Technical Review Team Org. Chart 2
58. No Date General Information Comanche Peak 1 Technical Review Team (TRT)
59. No Date Writing Standards for Comanche Peak SER 5 Supplement (SSER) t r-'n es-- w ,--,-~-m- g -~-
60. No Date Before the Atomic Safety and Licensing 43 Board " Affidavit of Robert C. Iotti and John C. Finnerman, Jr. Regarding the Effects of Gaps on Structural Behavior Under Seismic Loading Conditions
61. No Date AB-13 TRT Review Notes 1
62. No Date CPSES Org. Charts 7
63. 8/20/82 Texas Utilities Office Memorandum to: 7 J. T. Merritt From M. R. McBay

Subject:

Comanche Peak Steam Electric Station Electrical Conduit Support Reinspec tion Ref: Dwg. 2323-S-0910 CPPA-10032

64. 8/23/82 Texas Utilities Generating Company Office 3 Memorandum to: J. T. Merritt From: R. G.

Tolson

Subject:

Comanche Peak Steam Electric Station CP-82-10

65. 9/14/82 Texas Utilities Services, Inc. 1 To: R. G. Tolson From: Mr. R. McBay

Subject:

Comanche Peak Steam Electric Station SDAR CP-82-10 Re-Inspection of Conduit Supports Ref: TUQ-1374

66. 9/20/82 Texas Utilities Generating Company 1 ltr to: G. L. Madsen From: R. J. Gray Re: Re-Inspection of Ccnduit Supports File No. 10110
67. 10/20/82 Texas Utilities Generating Company 8 ltr to: Madsen From: Gray

Re: Re-inspection of Conduit Supports File No. 10110

68. 7/11/84 Comanche Peak Open Issue 1 l Inspection Data Sheet NRC Tracking No. DE-002
69. No Date TRT Reviewer Notes 1 (Summary of DE-002)
70. 11/15/79 Daily Report - Region IV 79-09 1
71. 11/16/79 TUGC0 Office Memo To: J. T. Merritt 2 From: R. G. Tolson

Subject:

CPSES 1981-83 2300 MW Installation Ref: CP-79-09

72. 1/2/80 TUGC0 Office Memorandum to: Ron Tolson 3 From J. T. Merritt

Subject:

CPSES 1981-83 2300 MW Installation SDAR 79-09 Ref: CPP-2199 TUQ-659

73. 3/20/80 Brown and Root Message to RGT From JRA 2 RE: SDAR-79-09
74. 4/21/80 TUGC0 ltr to Seidle From: R. J. Gravy

~

3 Re: Comanche Peak Steam' Electric Station 1981-83 2300 MW Installation Welded Conduit Supports File No. 10110

75. 4/22/80 Brown & Root Message To: R. G. Tolson 6 From: JRT RE: SDAR CP 79-09 l
76. 5/28/80- Speed ltr to: R. G. Tolson 2 From: J. R. Ainsworth

Subject:

SDAR 79-09/ Conduit Support Inspection 77.. 6/5/80 CPSES Speed ltr To: R. G. Tolson From: .2 J.~ P. Ainsworth

Subject:

Welded Conduit Supports - SDAR CP-79-09

.78. 7/24/80 TUGC0 Office Memorandum to M. Laue 3-From; J. R. Ainsworth

Subject:

CPSES SDAR 79-09 Site Welded Conduit Supports

79. 7/25/80 TUGC0 ltr to Siedle (NRC) 4 From R.-- J. Gray, RE: 1981-83 2300 MW Installation Welded Conduit Supports File No. 10110
80. 7/28/80 TUGC0 Memo To: M. La'ue 3 From: J. R. Ainsworth

Subject:

Revision of Response to SDAR 79-09 Welded Conduit Supports

81. 7/30/80 Speed ltr to: R. G. Tolson From: J. R. 1 Ainsworth

Subject:

SDAR 79 Welded Conduit Supports

82. 8/6/80 TUGC0 ltr to: Seidle (NRC) 2 From: Perry G. Brittain,

Subject:

1981-83 2300 MW Installation Welded Conduit Supports File No. 10110

83. 10/10/80 Speed. letter to: S. Ali 1 From JRA

Subject:

SDAR 79-09

84. 11/24/80 Speed ltr to: J. R. Ainsworth

Subject:

1 SDAR 79-09 " Welded Conduit Supports"

85. No Date Summary of DE-001 (Handwritten) 1
86. 12/12/78 Handwritten Note Weld Material 1 Requisitions
87. 11/2/80 Review of WFML's for Welded Conduit 62 Supports
88. 11/4/80 Brown and Root Message From: J. Burke 1 to: S. Ali Re: Weld Filler Material Issued
89. 10/24/80 List of Welders Taken from Weld Filler 17 Material Logs in Welding Engineering Files.
90. 11/8/79 TUGC0 Office Memorandum To: J. T. Merritt 2 From: R. G. Tolson

Subject:

Comanche Peak Steam Electric Station 1981-83 2300 MW Installation CP-79-08

91. 11/12/79 TUSI Office Memorandum To: R. G. Tolson 1 From: J. T. Merritt

Subject:

Comanche Peak Steam Electric Station

  • 1981-83 2300'MW Installation SDAR No. CP-79-08 Ref: TUQ-658
92. 12/4/79 Brown and Root Missage To: R. G. Tolson 1 From: J. R. Ainsworth Re: SDAR 79-08

- - . . - . . , , . , ,-,----,n ,, , - - -

, t

93. 1/8/80 . TUSI. 0ffice Memorandum To: R. G. Tolson 1 From: J. T. Merritt,-

Subject:

1981-83 2300 MW Installation SDAR No. CP-79-08 Ref: 1)TUQ-658

2) GTN-42796

. 3) CPP-2182

94. :1/29/80 Speed ltr From: _J. R. Ainsworth 1

Subject:

Reportable Deficiencies -

Status

95. 2/13/80 Brown.& Root, Inc. To: R. G. Tolson 1 From: JRA Re: SDAR 79-08 No Change In Response Date
96. 4/2/80 Texas Utilities Serv' ices, Inc. 1 Office Memorandum To: R. G. Tolson From: John T. Merritt,

Subject:

Comanche Peak Steam Electric Station 1981-83 2300 MW Installation

- SDAR-CP-79-08

97. . 4/6/80 Speed Letter To: J..T. Merritt From 1
R. G. Tolson

Subject:

SDAR-CP-79-08 CPP-00248

98. 4/16/80 Speed Letter fro: Jerry Allen 1 From: J. R. Ainsworth

Subject:

Hilti Bolt

- Installation Engineering Survey SDAR 79-08 t

i

\

r y e-r~ r . ,.,.v -.w,,--<,,=-e ,,,,wy,,, , _.nm m._ s._my_,__,y,r. ,-3y- , -w1 --6 re-y,.w-r .,.= - -yer

99. 4/21/80 TUGC0 ltr to NRC Re: Installation 1 of Drilled-In Expansion Anchors File No.-10110 100,-4/28/80 TUSI Office Memorandum To: Ron Tolson 1 From: J. T. Merritt,

Subject:

CPSES 1981-83 2300 MW Installation SDAR-CP-79-08 Ref: CPP-00248 101. 8/20/80 Texas Utilities Services, Inc. 35 Office Memorandum To: Dick Kissinger/ David Wade From: Jerry A. Allen

Subject:

CPSES Hilti Bolt-Discrepancies 102. 12/5/80 TUSI Office. Memorandum 3 To: R. G. Tolson From: J. T. Merritt

Subject:

CPSES SDAR-79-08 Ref: CPPA-7666 103. 12/9/80 Description of Deficiency 3 104. 12/10/80 TUGC0 ltr to NRC 2 Re: CPSES Installation of Drilled-In Expansion Anchors File No. 10110 105. 2/10/81 Speed Letter To: J. T. Merrill 2 From: Tolson

Subject:

Hilti Bolt Spacing Violations n- , e . .,a- - - - - - , - - - - - - - - - - - - - - - , - - - - . - , - - , , , ~ - e , ,. ., , , . , - - - , - - . - - - - -

d 14 -

106. 2/23/81 TUSI Office Memorandum 126 To: R. G. Tolson From: M. R. McBay

Subject:

CPSES SDAR 79-08 Failure to Maintain Minimum Spacing for Hilti's Ref: CPP-4522 Dated 2-11-81 107. 3/24/81 - Speed Letter From: J.R.A. 1 To: R. G. Tolson

Subject:

Min Spac. Violations 108. 12/16/83 Brown & Root Procedure Number CEI-20 18 Rev. 9 (Installation of "Hilti" Drilled-In Bolts) 109. No Date Comanche Peak Open Issue Inspection 3 Data Sheet NRC Tracking No. CB-005 110. No Date Summary of DB-005 (Handwritten) 1 111. 3/16/84 Application for Operating License 21 Dockets 50-445/50-446 -

112. 7/17/84 Comanche Peak Special Review Team 79 Report 113, 4/7/83 Dwg, 2323-Al-0511 1 Rev. 8 114. 4/7/83 Dwg. 2323-Al--0505 1 Rev. 11 115. 4/7/83 Dwg. 2323-Al-0504 1.

Rev. 10

'l y, - ,.

116. 4/7/83 Dwg. 2323-Al-0503 1~

Rev. 9 117._4/7/83 Dwg. 2323-Al-0500 1 Rev. 10 118. 4/7/83 Dwg. 2323-Al-0501- 1 Rev. 10 119. 4/7/83 Dwg. 2323-Al-0502 1 Rev. 11 120, 4/7/83 Dwg.-2323-Al-0507 1 Rev. 9 121. 4/7/83 Dwg. 2323-Al-0509 1 Rev. 12 122. 4/7/83 Dwg. 2323-Al-0508 1 Rev. 9

.123. 4/7/83 Dwg. 2323-Al-0510 -1 Rev. 8 124. No Date HDwg. (Primary Plant Electrical &

1 Control Building Observation Floor Plan EL-Sections and Details 340'-6")

125. No Date Dwg. 2323-Al-0506 (Prima Plant Unit 1 1 & 2 Roof Plan & Details

.e 16 -

.126. No Date ~ CPSES Org. Charts 7 127. 3/21/83 Memo C. Berlinger to V. Noonan 8 regarding the Adequacy of GE' Material Strength Limits 128. No Date ASME Article 111-3000: Basis .

7 For. Establishing Allowable Stress Values 129. July 1981 U.S. N.R.C. Standard Review Plan 21 NUREG-0800; Section 4.2 Fuel System Design 130. 8/31/81 ANSI /ANS-57.5 - 1981 Standard: 21 Light. Water Reactors Fuel Assembly Mechanical Design and Evaluation 4

4 4

i e

, - ,v - - - - - - - - - , . - - , . - - -

p j

  • y., .,

- 'l .

GOVERNMENT ACCOUNTADIUTY PROJECT

' 1'$35 Connecticut Avenue. N.W Soire 202 WasNngton D.C. 20036 (202)232 8550 G:85:104 January 21, 1985

- FREEDOM OF INFORMATION ACT REQUEST u

fn .D0'A 0F INFOftMATION ACI REQUESI Director k'Y

&gh*}j.g-Q f

Office of Administration

, Nuclear Regulatory Commission Washington, D.C. 20555

{ To Whom It May Concern:

Pursuant to the Freedom of Information Act ("FOIA") 5 U.S.C. $ 552, the Government Accountability Project (" GAP") requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, sunmaries, interview re-ports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies. data sheets, notebooks, books, telephone messages, computations, voice recordings, computer runoffs, any other data compilations, interim and/or firal reports, status re<

ports, and any and all other records relevant to and/or generated in connection

' with the overvfew, ragolation and investigation cf the Comanche Peak Nuclear Plant by any person, branch, or department of the NRC since January 18, 1985.

This request includes all agency records as defined in 10 C.F.R. $ 9.3a(b) and the NRC Manual, Appendix 0211. Parts 1.A.2 and A.3 (approved October 8,1980) whether they currently exist in the NRC official, " working," investigative or other files. or at any other location, including private residences.

i If any records as defined in 10 C.F.R. $ 9.3a(b) and the NRC Manual, supra, and

  • covered by this reques.t have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implementtheaction(s).

GAP requests that_ fees be waived, because " finding the information can be con-l . sidered as primari)y benefitting the general public," 5 U.S.C. $ 552(a)(4)(a),

GAP is a non-profit.-non-partisan public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents of government accountability. Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups I

seeking to ensure the health and safety of their communities. The Citizens Clinic is currently assisting several citizens groups, local governments and

'intervenors in the central Texas area concerning the construction of the Comanche Peak nuclear power plant. .

t

  • - QU-J.L.-U(.U r/rn }[A V /DAM//

~

irector Office of Administration - .

Page Two 3-We are requesting the above information a's part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.

For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of.

documents withheld. The index should provide a detailed jusitfication of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir.1973), cert. denied, 415 U.S.

977 (1974).

We look forward to your response to this request within ten days.

Sincerely, b LW Billie Pirner Garde Citizens Clinic Director P