Confirms Special Insp on 870223-27 to Evaluate Plants for Compliance w/10CFR50,App R & Implementation of Fire Protection Features,Per 861201 Telcon.Listed Addl Info Requested by 870209
ML20214W972
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/03/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8612100487
Download: ML20214W972 (3)


Text

'

o DEC 3 1986 Dccket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. C. W. Fay Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:

SUBJECT:

INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R, APPLICABLE SECTIONS AND ASSOCIATED FIRE PROTECTION FEATURES - POINT BEACH UNITS 1 AND 2 - DOCKET NOS 50-266 AND 50-301 This letter is to confirm the dates of February 23-27, 1987, for the special inspection of the Point Beach Plant, Units 1 and 2, which were established during the telephone conversation of December 1, 1986, between Messrs. James Reisenbuechler and Greg Maxsfield of your staff and Mr. Joe Ulie of this office.

The purpose of this inspection is to evaluate the Point Beach facility, Units 1 and 2 for compliance with the applicable sections of Appendix R to 10 CFR 50.

In addition, this inspection will review the implementation of the Fire Protection Program. This will be a team-type inspection composed of personnel from the NRC Region III office, our contractors (Brookhaven National Laboratory), and based on their availability, personnel from NRC's Headquarter's offices.

In order for us to properly prepare and perform this type of comprehensive and complex inspection, we request that you provide this office with the latest revision to the following additional information by February 9, 1987:

1.

Piping and instrumentation (flow) diagrams for hot standby (shutdown) and cold shutdown systems, alternative or dedicated shutdown systems and the reactor coolant pump oil collection system.

2.

Plant layout and equipment location drawings which identify the physical plant locations of hot standby (shutdown) and cold shutdowu equipment.

3.

Clearly marked-up electrical raceway drawings which identify the cable routing of power and control circuits for those plant systems necessary to achieve and maintain hot standby (shutdown). Drawings

%2]Q$ h G

h2

. m 6

DEC 3 1986 Wisconsin Electric Power Company 2

should also identify exactly where cable wrapping has been installed and the extent to which cable wrapping has been installed. Also, identify the equipment and cabling which is redundant or alternative to the cabling that has been wrapped.

4.

Control electrical distribution diagrams, control schemes for shutdown components which are being controlled from the remote shutdown panel, and single line AC and DC power.

5.

Plant layout drawings which identify fire area delineation and fire protection equipment locations.

6.

Marked-up plant laycut drawings which identify the locations of emergency lighting units.

7.

Associated drawings which depict the physical and seismic design of reactor coolant pump oil collection system.

8.

Associated circuit analysis including drawings of alternate shutdown panel, circuits and fuse coordination.

9.

Plant Operating Procedures which describe normal hot and cold shutdown from inside the control room, emergency hot and cold shutdown from emergency control stations outside and independent of the control room, and shutdown operations which utilize alternative or dedicated shutdown capability and natural circulation.

10.

Fire damage control and repair procedures for cold shutdown systems.

11. Safe Shutdown Analysis (SSA) and a current Fire Hazards Analysis (FHA).

The SSA and FHA need to list safe shutdown equipment and cabling in each area.

If you have already submitted to the NRC documents providing portions of the information requested, please identify those documents in your response to this letter.

Further, to assist in our inspection effort, please advise us in summary format of any deviation (s)/ exemption (s) requested and granted or requested and pending related to the applicable sections of 10 CFR 50, Appendix R.

In addition to the information requested above, copies of any other analyses and/or evaluations which demonstrate compliance to the applicabla sections of Appendix R, including any analysis written to satisfy Generic Letter 86-10, should be available on site for review during this inspection. Appropriate personnel, knowledgeable with respect to those plant systems required for safe shutdown and their capabilities, should be available at the site during this inspection. Following the entrance meeting, we would appreciate a plant familiarization tour relative to areas containing safe shutdown equipment.

e Wisconsin Electric Power Company 3

DEC 3 3986 o

Also, we request that your staff make the necessary arrangements to permit team members ready access to the radiologically controlled areas of the plant if necessary.

Your cooperation with us during this inspection will be appreciated. Should you have any questions concerning this letter, please contact J. M. Ulie at 312-790-5712.

Sincerely, Original Signed by J. J. Parri: -

J. J. Harrison, Chicf Engineering Branch cc:

J. J. Zach, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch K. Sullivan, BNL Resident Inspector, RIII John J. Duffy, Chief Boiler Section Mary Lou Munts, Chairperson Wisconsin Public Service Conunission Collette Blum-Meister (SLO),

WI Div. of Emergency Government Yb RIII RIIJ J j

R L, II RI g

br6%

Q, s 40

%CK

/

(flie/jk 06F4 Mete Muffett Ha rison 12/03/86 12/ 3 /86 12/3/86 12/.3 /86