ML20214W779

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-266/86-20 & 50-301/86-20 on 861001-1130.No Violations Noted
ML20214W779
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/22/1986
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20214W783 List:
References
NUDOCS 8706160181
Download: ML20214W779 (2)


See also: IR 05000266/1986020

Text

s

.

.l

p v.6

.

~

'

.

.,

4

OEC 22 q

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice President

Nuclear Power Department

231 West Michigan, Room "08

.

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. L. Hague

and R. J. Leemon of this office from October 1 through November 30, 1986, of

activities at Point Beach Nuclear Plant. Unit 1 and 2, authorized by NRC

Operating Licenses No. DPR-24 and DPR-27 and to the discussion of our finding'.

with J. J. Zach at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

-the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in t

terviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the'NRC

Public Document Room.

I

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

8706160181 861222

ORIGINAL SIGNED BY E. G. GREENMMI

PDR

ADOCK 05000266

G

PDR

W. G. Guldemond, Chief

Projects Branch 2

Enclosure:

Inspection Reports

No.50-266/86020DRP);

No. 50-301/86020 DRP)

See Attached Distribution

RII

RIIgf3v N

Gudem(odd

f4

i

RI

s $l

L

Y

Kan

c

DeFayette'

_

1

. ,-

3

. .

.

+

s

' '

.. .

.

w

Wisconsin Electric Power Company

2-

DEC 22 g

Distribution

~-cc w/ enclosure:

J. J. Zach, Plant Manager

,,

s

DCS/RSB (RIDS)

.

Licensing Fee Management Branch

+ , - . Resident Inspector, RIII

'

John J. Duffy, Chief.

Boiler Section

Ness Flores, Chairperson

C

1,+ -

Wisconsin Public Service

Commission

.

7

%

9

4

.

k.

v.

.

f.

'

.

i

4

-

' L,

,

%

- Rs

>

$j

.

s

r_