ML20214W356
| ML20214W356 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/28/1986 |
| From: | Zech G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20214W359 | List: |
| References | |
| NUDOCS 8612100197 | |
| Download: ML20214W356 (1) | |
Text
-
D f
NOV 2 81986 MEMORANDUM FOR:
B. Joe Youngblood, Project Director, Project Directorate #4, Division of PWR Licensing A, NRR FROM:
Gary G. Zech, Director, Division of TVA Projects
SUBJECT:
SAFETY EVALUATION REPORT (SER) INPUT FOR SEQUOYAH RESTART -
MAINTENANCE i
Enclosed is the updated maintenance SER input that replaces our previous maintenance SER input dated August 7, 1986.
Note that there are followup items that will be resolved by Region II during inspections prior to startup of the Sequoyah units.
CRIGINAL SIGNED BY
( GARY G. ZECH u
Gary G. Zech
Enclosure:
Sequoyah SER Maintenance Input cc w/ enc 1:
H. Thompson, NRR C. Stahle, NRR D. Muller, NRR R. Spessard, IE bec w/ encl:
K. Jenison, RII g2]gy ha
{
G RII RII q
"J f J$rady RC r
b 11//9/86 11/2b/86 11/,p86
[
W/
-