0k
O
/
SAKMMMFWORMAI03
DEC 0 21986
Docket No. 50-10
Docket No. 50-237
Docket No. 50-249
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safeguards inspection conducted by
Ms. G. M. Christoffer and Mr. T. J. Madeda of this office on October 20-23,
1986, of activities at Dresden Nuclear Power Station, Units 1, 2 and 3,
authorized by NRC Operating Licenses No. DPR-02, No. DPR-19 and No. DPR-25
and to the discussion of our findings with Mr. E. Eenigenburg and members
of his staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
Security representatives from CECO will attend a working level meeting at
Region III on November 25, 1986 to discuss the CECO Program for Protection of
Safeguards Information.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required for Violation 1.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2). This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21. Consequently, the enclosure
to this letter, our report of the inspection, and your response to the
violations identified in the enclosure to this letter will not be placed in
'
the NRC Public Document Room. Therefore, your statement of corrective action
regarding Violation 1 identified in the enclosure should be submitted as
a separate enclosure to your transmittal letter in the manner prescribed.
,
i
The responses directed by this letter and the accompanying Notice are not
-
subject to the clearance procedures of the Office of Management and Budget as j
required by the Paperyork Reduction Act of 1980, PL 96-511.
g/
pgA2%g!2 Suajk
['#
hi
EncTosure c'cntnins
G
f
~
SAFEGUARDS IliFC:iD. TION
,
, ,__ - , z q y
Upon separation this
)
StTit_rfn%srm unmm wI)
page is Decentrciled
n ru s
=^
1
<
.
SA-~C !ARPS !F FOR 9T!0 \\
-
"
Comonwealth Edison Company
2
DEC 0 21986
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
d
4,
W. L. Axe sorr, ThTef
Nuclear Materials Safety .
~
and Safeguards Branch
.
Enclosures:
1.
2.
Inspection Reports
No. 50-10/86007(DRSS);
No. 50-237/86025(DRSS); and
No. 50-249/86030(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
J. Eenigenburg, Plant Manager
IE File
IE/DI/0RPB
IE/ES
NMSS/SGPL
NRR/PWR-B/SSPB
cc w/ enclosures, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
RIII "
RIII
RIII
RIII
RII
,
Y
V
di~
reed'gje
-
Christoff r/nma J
A>p o
Madeda
//r,fo
EneTosura conteira
5AFCCUArses ::70:?sJIO.1
Upon sephasian shi3
page is Decentrolled
SA3 A_ J Jp p eriMA m
_
-