Text
I
,
D
2 6 7986
Docket No. 50-424
License No. CPPR-108
Georgia Power Company
/ ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT N0. 50-424/86-78
On May 5-9, June 2-6,15-19, 22-25, and July 7-11, 20-24, 28-31, 1986, Nuclear
Regulatory Commission (NRC) inspected activities authorized by NRC Construction
Permit No. CPPR-108 for your Vogtle facility.
At the conclusion of the inspec-
tion,- the findings were discussed with those members of your staff identified in
the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Luis A. Reyes /for
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
(See page 2)
8612090597 861126
ADOCK 05000424
G
, \\
Seol
-
,
4
NOV 2 G G95
.'
.
Georgia Power Company
2
-dtw/encls:
. P. O'Reilly, Senior Vice President
, Nuclear Operations
VR. E. Conway, Senior Vice President &
Project Director
vd. O. Foster, Vice President, Project
/ Support
.p.D. Rice,VicePresident, Project
Engineering
j ..H. Pinson, Vice President, Project
R
Construction
f.T.Beckham,VicePresident&
j General Manager - Operations
f.A. Thomas,VicePresident,
Licensing
. S. Read, General Manager,
/ Quality Assurance
%.W. Hayes,VogtleQuality
/ Assurance Manager
VW. C. Ramsey, Manager -
, Readiness Review
(A. B. Bockhold, General Manager,
Nuclear Operations
,y.~ Gucwa, Manager, Nuclear Safety
V
and Licensing
M H. Googe, Project
, Construction Manager
//E. D. Groover, Quality
Assurance Site Manager -
Construction
g.'A. Bailey,ProjectLicensing
Manager
g.F.Trowbridge,Esq.,Shaw,
Pittman, Potts and Trowbridge
V . W. Churchill, Esq., Shaw,
B
Pittman, Potts and Trowbridge
y . L. Blake, Jr. , Esq. , Shaw,
E
Pittman, Potts and Trowbridge
f.E. Joiner,Troutman, Sanders,
r Lockerman and Ashmore
f G. Ledbetter, Commissioner,
Department of Human Resources
/ H. Badger, Office of Planning
and Budget
p'D. Kirkland, III, Counsel,
Office of the Consumer's Utility
[. Council
Feig, Georgians Against
Nuclear Energy
(cc w/encls cont'd - see page 3)
i
!
i
_.
-
-4
.
,
D 2 6 1986
Georgia Power Company
3
g(ccw/enclscont'd)
B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
L,Br. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
f. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
grP. Garde,CitizensClinic, Director
Government Accountability Project
bgc w/encls:
/f. Reis, OGC
v W. M. Hill, IE
CA4. Miller, NRR
- A . Brach, ED0-
~M.
Sinkule, RII
% E. Christnot, RII
/RCResidentInspector
Document Control Desk
State of Georgia
RI
RII
RI
EChr stnot:cdg
MS
R alke
10fM/86
407 /86
/ /8
ll
H z. J
P