DEC 0 2 #
Docket / License: 50-317/DPR-53
50-318/DPR-69
Baltimore Gas and Electric Company
ATTN:
Mr. J. A. Tiernan
Vice President
Nuclear Energy
P. O. Box 1475
Baltimore, Maryland
21203
Gentlemen:
Subject:
Combined Inspection Report N a 50-317/86-20; 50-318/86-20
This transmits the November 3-7, 1986 special announced safety inspection findings
by Messrs. S. A. McNeil and R. M. Perfetti of the Office of Nuclear Reactor Regu-
lation at the Calvert Cliffs Nuclear Power Plant, Lusby, Maryland.
Those findings
have been discussed with Mr. J. Lemons and others of your staff during the course
of and at the conclusion of the inspection.
The areas examined during this inspection are described in the NRC Region I In-
spection Report which is enclosed with this letter.
Within these areas, the in-
spection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, an apparent violation of NRC requirements
was noted, as set forth in the Notice of Violation, enclosed herewith as Appendix
A.
This violation has been categorized by severity level in accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C.
The enclosed report also includes observations that may result in other enforcement
actions; these potential enforcement findings, referred to as unresolved items in
the report, will be followed by Mr. S. A. McNeil, Project Manager, Office of Nuc-
lear Reactor Regulation.
You are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR Part 2.790 of the Commission's regulations, a copy of
this letter and the attached enclosures will be placed in the NRC's Public Document
Room.
8612090544 861202
ADOCK 0500
7
I (
__.
.
. - -
..
_
.~
.
..
'
b .* C
'
I
Baltimore Gas and Electric Company
2
DEC 0 21986
Your cooperation with us in this matter is appreciated.
Sincerely,
c.dr,1331 signed By,Il
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Inspection Report Nos. 50-317/86-20; 50-318/86-20
cc w/encls:
M. Bowman, General Supervisor, Technical Services Engineering
Thomas Magette, Administrator, Nuclear Evaluations
Public Document Room (PDR)
Local Public Document Room (LPDR)
';
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
bcc w/encls:
Region I Docket Room (w/ concurrences)
Management Assistant, DRMA (w/o enclosure)
DRP Section Chief
S. McNeil, ORPM, NRR
M. McBride, RI, Pilgrim
-
T. Kenny, SRI. Salem
D. Jaffe, LPM, NRR
Robert J. Bores, DRSS
,
i
I
f
kjD-8:
P4/
)
DkP:RI
1
I
p SMcNeil/RPerfetti
LTripp
E
inger
l
'
11/K4/86
11/jf/86
Yg4/86
f
0FFICIAL RECORD COPY
i
,
i