Forwards Insp Repts 50-317/86-20 & 50-318/86-20 on 861103-07 & Notice of Violation
ML20214V142
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/02/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20214V145 List:
References
NUDOCS 8612090544
Download: ML20214V142 (2)


See also: IR 05000317/1986020

Text

'

,

e

DEC 0 2 #

Docket / License: 50-317/DPR-53

50-318/DPR-69

Baltimore Gas and Electric Company

ATTN:

Mr. J. A. Tiernan

Vice President

Nuclear Energy

P. O. Box 1475

Baltimore, Maryland

21203

Gentlemen:

Subject:

Combined Inspection Report N a 50-317/86-20; 50-318/86-20

This transmits the November 3-7, 1986 special announced safety inspection findings

by Messrs. S. A. McNeil and R. M. Perfetti of the Office of Nuclear Reactor Regu-

lation at the Calvert Cliffs Nuclear Power Plant, Lusby, Maryland.

Those findings

have been discussed with Mr. J. Lemons and others of your staff during the course

of and at the conclusion of the inspection.

The areas examined during this inspection are described in the NRC Region I In-

spection Report which is enclosed with this letter.

Within these areas, the in-

spection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, an apparent violation of NRC requirements

was noted, as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

This violation has been categorized by severity level in accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C.

The enclosed report also includes observations that may result in other enforcement

actions; these potential enforcement findings, referred to as unresolved items in

the report, will be followed by Mr. S. A. McNeil, Project Manager, Office of Nuc-

lear Reactor Regulation.

You are required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying Notice are not subject

to the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR Part 2.790 of the Commission's regulations, a copy of

this letter and the attached enclosures will be placed in the NRC's Public Document

Room.

8612090544 861202

PDR

ADOCK 0500

7

I (

__.

.

. - -

..

_

.~

.

..

'

b .* C

'

I

Baltimore Gas and Electric Company

2

DEC 0 21986

Your cooperation with us in this matter is appreciated.

Sincerely,

c.dr,1331 signed By,Il

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Inspection Report Nos. 50-317/86-20; 50-318/86-20

cc w/encls:

M. Bowman, General Supervisor, Technical Services Engineering

Thomas Magette, Administrator, Nuclear Evaluations

Public Document Room (PDR)

Local Public Document Room (LPDR)

';

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

bcc w/encls:

Region I Docket Room (w/ concurrences)

Management Assistant, DRMA (w/o enclosure)

DRP Section Chief

S. McNeil, ORPM, NRR

R. Perfetti, PE, NRR

M. McBride, RI, Pilgrim

-

T. Kenny, SRI. Salem

D. Jaffe, LPM, NRR

Robert J. Bores, DRSS

,

i

I

f

kjD-8:

P4/

)

DkP:RI

1

I

p SMcNeil/RPerfetti

LTripp

E

inger

l

'

11/K4/86

11/jf/86

Yg4/86

f

0FFICIAL RECORD COPY

i

,

i