Summary of 870508 Meeting W/Util in Bethesda,Md Re Proposed Tech Spec Changes Re Revised Shutdown Margin Requirements & Variable Overpower Trip Setpoints.List of Attendees Encl
ML20214T380
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/03/1987
From: Licitra E
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8706100231
Download: ML20214T380 (4)


Text

3 JUN 1987 Docket Nos.: 50-528/529 and 50-530 LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Units 1, 2 and 3

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS A meeting was held on May 8,1987 in Bethesda, Maryland with representatives of the licensee to discuss several proposed changes to the Technical Specifications for Palo Verde. Units 1, 2 and 3.

The attendees for the meeting are listed in Enclosure 1 and the meeting is sumarized as follows.

SUMMARY

The licensee provided a discussion of two recent amendment requests for Technical Specification changes to Palo Verde. Units 1, 2 and 3.

These are a l

requested change to Specification 3.0.3, submitted by letter dated May 6 I

1987, and to the variable overpower trip setpoints in Table 2.2-1, submitted by letter dated May 4, 1987. The discussion was helpful in providing the I

staf f with an understanding of what was being requested and why it was needed.

l The licensee also discussed its pending request for additional relief to Specification 3/4.11.1 for Unit 1 (which was received on May 11,1987) regarding discharges to the onsite evaporation pond. During the week of April 27, 1987, the licensee had informed the staff that the relief previously granted until May 23, 1987 would not allow sufficient time to reduce the concentrations of Antimony-124 in the secondary system so that liquid waste discharges to the pond could be within the limits of Specification 3/4.11.1.

The licensee stated that in addition to evaluating permanent changes to Specification 3/4.11.1, it is evaluating alternatives for potential plant l

modifications for such situations in the future.

l The staff also discussed another Technical Specification change request i

submitted by the licensee for all three Palo Verde units, dealing with revised shutdown margin requirenents. The staff identified the need for the following additional information to complete our review, which the licensee agreed to j

provide:

0706100231 070603 PDR ADOCK 00000520 P

PDR

l Mr. E. E. Van Brunt, Jr.

Arizona Nuclear Power Project Palo Verde cc:

Arthur C. Gehr, Esq.

Kenneth Berlin, Esq.

Snell & Wilmer Winston & Strawn 3100 Valley Center Suite 500 Phoenix, Arizona 85073 2550 M Street, NW Washington, DC 20037 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission Ms. Lynne Bernabei 1200 West Washington Government Accountability Project Phoenix, Arizona 85007 of the Institute for Policy Studies 1901 Que Street, NW Charles R. Kocher, Esq. Assistant Washington, DC 20009 Council James A. Boeletto, Esq.

Southern California Edison Company Mr. Ron Rayner P. O. Box 800 P. O. Box 1509 Rosemead, California 91770 Goodyear, AZ 85338 Mr. Mark Ginsberg Energy Director Mr. Charles B. Brinkman, Manager Office of Economic Planning Washington Nuclear Operations and Development Combustion Engineering, Inc.

7910 Woodmont Avenue Suite 1310 1700 West Washington - 5th Floor Bethesda, Maryland 20814 Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. O. Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourthan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 f

1 l

ENCLOSURE PALO VERDE TECHNICAL SPECIFICATION MEETING (March 8, 1987)

NAME AFFILIATION Hanny Licitra NRC/NRR/PDS i

Daniel Fieno NRC/NRR/SRXB Gerald Sowers APS Joe Rezandes C-E Mark Mancuso C-E(ProjectOffice)

Richard A. Bernier ANPP Licensing Leon E. Brown ANPP Rad. Prot. & Chem.

Larry Kopp NRC/NRR/SRXB

'Millard Wohl NRC/NRR/TSB Robert J. Giardina NRC/NRR/TSB Charles F. Nichols NRC/NRR/PSB Chu-Yu Liang NRC/NRR/SRXB s

Ed Branagan NRC/NRR/RPB i

)j.

,e

-2_

)

(1) A clearer definition of the new Kn-1 factor in the proposed changes.

(2) A safety evaluation of the new Special Test Exception 3/4.10.9 in the proposed changes.

(3) Clarification in the bases section of the proposed T/S changes to reflect the above two items.

Grisinal signed by E. A. Licitra, Senior Project Manager Project Directorate V Division of Reactor Project - III/IV/V l

& Special Project

Enclosure:

Meeting Attendees cc: As stated DISTRIBUTION sMP r

NRC & Local PDRs PDf5 Reading EAlicitra MDavis GWKnighton OGC-Bethesda EJordan JPartlow NRC Participants ACRS (10)

T. O. Martin-ED0 4

hY DRSP/PDV D

):PDV ELicitra:cd G

lton 06/j/87 06/;/87

.