ML20214T281

From kanterella
Jump to navigation Jump to search
Advises That Const & Preoperational Testing of Plant Completed.Insp Program & Other Related Activities Implemented
ML20214T281
Person / Time
Site: Catawba, 05000000
Issue date: 02/07/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20214T134 List:
References
FOIA-87-271 NUDOCS 8706100192
Download: ML20214T281 (5)


Text

l I

gs,9 Ce s UNITED ST ATES

,4 8- NUCLEAR GEGULATORY COMMtsSION l y

e

^

C CECION il 101 MARIET T A STREET,N.W.

j i

'f ATLANT A,Cf 0RGI A 30323 l

z. p.. .* /  :

FEB 0 71986 MEMORANDUM FOR: Harold R. Denton, Direc tor, Office of Nuclear Reactor Regulation l FROM: J. Nelson Grace, Regional Administrator -

SUBJECT:

DUKE POWER COMPANY'S CATAWBA UNIT 2, DOCKET NO. 50-414, STATUS OF FACILITY COMPLETION Based on the implementation of the prescribed NRC inspection program and other related inspection activities, we have deterinined that construction and pre-operational testing of Catawba Unit 2 have been completed in accordance with the FSAR, other docketed comitments and regulatory requirements with the exceptions listed in the enclosures. Region 11 notes the draft Catawba Unit 2 Low Power License, dated December 26, 1985, and the Duke Power Company *.etter requesting exemptions for Catawba Unit 2, dated January 21, 1986. We requested and received from Duke Power Company the status of completion letter dated January 24, 1986.

The letter is acceptable and consistent with our findings. Therefore, the enclosures to this memorandum are recomended for enclosure to the draft lor power license for Catawba Unit 2.

Region II is presently scheduled to send to NRR our recommendations for issuance of a low power license on February 12, 1986.

bu  %

J. Nelson Grace

Enclosures:

1. Items to be Completed Prior to Fuel Loading of Catawba Unit 2 (DocketNumber50-414)
2. Items to be Completed Prior 1.c Initial Criticality of Catawba Unit 2 (Docket

- Number 50-414)

3. Items to be Completed Prior to Exceeding 5*. Rated Power at Catawba Unit 2 (Docket Number 50-414) cc w/encls: (See page 2)

CONTACT:

C. W. Burger 242-4193 192 870604 DE -27,1, ,,

a FEB 071986 Harold R. Denton 7 cc w/encls:

E. L. Jordan, Director, DEPER, IE G. T. Ankrum, Chief, Quality Assurance Branch, DQAVT, IE -

L. I. Cobb, Chief, Safeguards and Material Programs Branch, IP, IE R. F. Heishman, Chief, Reactor Construction Programs Branch IP, IE K. N. Jabbour Licensing Project Manager, NRR t

I C

1

4 FEB 0 71986 ENCLOSURE 1 ITEMS TO BE COMPLETED PRIOR TO FUEL LOADING

0F CATAWBA UNIT 2 (DOCKET NUMBER 50-414)

The licensee will complete to the satisfaction of NRC Region II, the

~

A.

requirements of the following bulletins:

1. Pipe support base plate designs using concrete expansion anchor bolts (79-BU-02/MPS).
2. Seismic analysis for as-built safety-related piping systems (79-BU-14/MPS). ,

e

}

  • 4 1

4 f

t 4

I g ,m7 y e . ~-e ---

^

FEB 0 7 5986 ENCLOSUPE 2 .

ITEMS TO BE COMPLETED PRIOR TO INITIAL CRITICALITY OF CATAWBA UNIT 2 (DOCKET NUMBER 50-414)

A. The licensee will complete to the satisfaction of NRC Region II, the following Construction Deficiency Reports (50.55e items) and Part 21 identified items:

1. Complete modification to provide proper clearances of NCX 750'and NCX 1200 batteries (CDR 85-07/PSS). e
2. Implement corrective action relative to Diesel Generator 2B bearin'g .

f failures (CDR86-01/DRP) ,

B. The licensee will resolve to the satisfaction of NRC Region II, the following unresolved items

l Complete review of electrical interface between Units 1 and 2 (85-32-01/DRP).

1

, FEB 0 71986 ENCLOSURE 3 ITEMS TO BE COMPLETED PRIOR TO EXCEEDING 5%

RATED POWER AT CATAWBA UNIT 2 (DOCKET NUMBER 50-414)

The licensee will complete to the satisfaction of NRC Region II, the TMI related requirenents for full power and low power testing (TI 2514/01, Rev. 2).

1 3