ML20214S213
| ML20214S213 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/01/1987 |
| From: | Mangan C NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| (NMP2L-1042), GL-87-06, GL-87-6, NUDOCS 8706090183 | |
| Download: ML20214S213 (1) | |
Text
NMRifR NIAGARA MOHAWK POWER CORPORATION /301 PLAINFIELD ROAD. SYRACUSE. N.Y.13212/ TELEPHONE (315) 474-1511 June 1,1987 (NMP2L1042)
U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C. 20555 Re:
Nine Mile Point Unit 2 Docket No. 50-410 Geritlemen:
This letter provides Niagara Mohawk's response to Generic Letter 87-06,
" Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves,"
for Nine Mlle Point Unit 2.
The Generic Letter stated that the specific information requested in the letter need not be provided if the leak rate testing of all pressure isolation valves in the plant were required in the current Technical Specification.
This is the case at Nine Mlle Point Unit 2.
The current Nine Mile Point Unit 2 Technical Specifications require leak rate testing of all of the Pressure Isolation Valves in the plant.
The pressure isolation valves that are leak rate tested are listed in Table 3.4.3.2-1 of the Nine Mile Point Unit 2 Technical Specifications.
The testing requirements for these valves are given in Section 4.4.3.2.2 of the Technical Specifications.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION
{f $
0 P
C. V. Man an Senior Vice President GAG /pns 3051G xt: Regional Administrator, Region I (p(/p Mr. R. A. Capra, Director, Project Directorate I-l Mr. H. A. Cook, Resident Inspector g}
l Project File (2) l