Proposed Tech Specs,Extending Allowed out-of-svc Period for Diesel Generator 12 in Order That Maint Can Be Performed W/O Requiring Unscheduled Cold Shutdown
ML20214Q792
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/19/1986
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20214Q790 List:
References
NUDOCS 8609260317
Download: ML20214Q792 (2)


Text

. .

. ,5 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.3.1 A.C. SOURCES 1

OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. physically independent circuits between the offsite transmission M d network and the onsite Class lE distribution system consisting of cith :
1. Two 500 Ky offsite power circuits, :r x xxxnr3 and .
2. The 69 Kv SMECO offsite power circuit described in the January 14, 1977 Safety Evaluation y = c O ' ;ff:it: p u r ci, L it, and
b. Two separate and independent diesel generators (one of which may be a swing diesel generator capable of serving either Unit 1 or Unit 2) each with:
1. Separate day fuel tanks containing a minimum volume of 375 gallons of fuel, t
2. A common fuel storage system consisting of two independent storage tanks each containing a minimum volume of 18,250 gallons of fuel, I

, and

3. A separate fuel transfer pump.

APPLICABILITY: MODES 1, 2, 3 and 4.

^ "*

, ad ewedkn(generahor

a. Withgews.offsite circuitgAof the above required A.C. electrical power l sources inoperable, demonstrate the OPERABILITY of the remaining A.C.

r sources by perfoming Surveillance Requirement 4.8.1.1.lg within one bted cmte- hour and. at least once per 8. hours thereafter; and 4.8.1.1.2M within e,ve.c41 2, Leon 24 hourf unless the diesel generators are already operating. Restore f$ red.

4 j ct Ext 2r offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be h"-)8 3 in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

No,tL

b. With enegdiesel generator inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by perfoming Surveillance Requirement 4.8.1.1.1g within one hour and at least once per 8 hauts thereafter. and g Surveillance Raouirement 4.8.1.1.2d(# witt.in 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />sg Restore two Miesel generators to UFtKABLE status ~ withir'44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> or be in at least HOT STANOBY within the next G hours and in COLD SHUTDOWN within the

-fol1ow.;.; 30 urs.

8609260317 860719 *8' DR ADOCV 0D00 7 cygg )y Q CALVERT CLIFFS - UNIT 1 3/4 8-1 Amendment No. 58,32, 11 -f gea[ g l t

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION: (Continued)

c. With two offsite circuits and one diesel generator of the above a required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Q within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Requirement thereafter and Survei 4.8.1.1.1;l(ance l Requirement 4.8.1.1.W within 8 ho ,

unless the diesel generators are already operating. Restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be Q4 '

in at lmt HOT STANDRY within the nort 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore

  • t ?;; t :.. offsite circuits O, ll o r No.ll) time ando4#[ initialdiesel loss orgenerator.l(

be in at least HOT to OPERABLE STANDBY within s8atus the nextwithin32 hou 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. /

esd O ns dit$$( Jt.nefA,7bf"

d. With three of the above required offsite A.C. circuits 4 noperable. i l 40 r--t :t; :.i.s OP:","'IL!T" .i u u....;  ;;;;r:t: r by ;;rf # ;

2"-"" 11.n;; ":;i : := ' .0. . i . " . 2. ' ui + ki-  :,. . . c. ! : n t M -

OE!E=Wh"drh !!!MW=54'!N:; if E l 4a a :== rr m i n. ... ... ..a e w- u4+w --n ;... ; r-d t: :nc;; ren ..u, .mde.; .t b.. L. :ff:ft: -4* "it: t OP:P."1:

it:tn itt.in 72 hou.. T. .. . . ..m u r ir,tti:1 i n : er 5: t :t 1r = "0T -

h in of \ ud- N01' STANDBY within the next 6 hou'rs and in COLD SHUTDOWN within \ t ing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

e. With two of the abov e ired diesel generators inoperable, demonstrate l the OPERABILITY of ite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> l ' M8 ~V Ell nerearter; 1 restore :- 'rrt r rf r:

OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in^at least Hr e ..:.:"' fesel generator to STANDBY within he next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. I Restore at least two diesel gnerators to OPERABLE status within 44 M E ,N hours from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in ~ COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.  ;

. f. T h e.

PMisins & S t edCca% 3.b.4 att vo+ afP licable. \

SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each required independent circuit between the offsite transmission network and the ortsite Class lE distribution system shall be)( denu 6/Med OPEA AO L C.o ot.s folle u s?

. r - .nc=d 0.":PC.2, as to a ivm  ;

i ,

.3 houfS Q X. For each 500 XV offsite circuit, at least once per 7 i.p by verify-ing correct breaker alignments and indicated power svailability, CALVERT CLIFFS.- UNIT l' 3/4;8-27 Amdadment-No. 58.92',.111:

)

i

)

. ....\

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) h g. For the 69 Kv SP C0 offsite power circuit, _ithin ::: 'cu :#

zubstitutier fr ; 500 L UTTa,tu evoca uo wait and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability. **d-sh r % ne+ryt;d gpgpfgt_g ;g ],g,g ggg; pg, }g _ , _ j j _g .3, gg ._ _

-an. gally trancfar*4ag _,,jt p;,;c ;gpp], 77; the agemmi circui+ gg the Cl tar ;te w a i vu n i'.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE)(Q B t. k u rs -

gt least once per -21 d;y;gon a STAGGERED TEST BASIS by:

1. Verifying the fuel level in the day fuel tank.
2. Verifying the fuel level in the fuel storage tank.
3. Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank.

1

4. Verifying the diesel starts and accelerates to at least 900 rpm l f with generator voltage and frequency at 4160 + 420. volts and i 60 + 1.2 Hz, respectively.* -
5. Verifying the generator is synchronized, loaded to > 1250 Kw, and _

operates for > 60 minutes. _

6. Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.

m- ,__> -

72. . u.. - _. 4.,,. 4 , n ,u... _ _ ,,.m

.....,.m_ .. . _ _ _ _ . . _ m

. . ... .... m m . ,,, , , , , , , , ,

vr - m o n.h the interval bas men mach :::d bl 9- w4+h4n + 1nt nr _

4+-... 2 - - 4. ,,, ,

l

4. lu. icosi unum pr ^2 d:y; L i verifyinv 6u.:. ; : pic ;f dis; 1 T sl

'r:-- the fuel st 3;r t;nk 12 -i u.i , t.':: ::::pt:bi; l'-'t: : cri#ied l in l'2hle 1 ef ^S?'. 007: !! 'd: th:d:d f:r ;i;;.;;i , , .. .. ..,o l

_nC.

di
e. ^t-le :t ergo no r lu amye by_ye_4s 4y ng the

,44.u1 etar+e s n ,,,,, , , n ,

.;;,diti:0 2"d 2PP818PS*": t; a n. leasb huv i rn $u ; IC ^02 II.

a.

  • AllenginestartsforthepurposeofthisSurveillanceRequirimentmay be preceded by an engine prelube period and/or other warmup pFocedures recommended by the manufacturer so that mechanical wear and stress on
t. the die nt er.;!.a is min mized.

[

CALVERT CLIFFS - UNIT 1 3/4 8-3 Amendment No. 3 9, 111

ATTACHMENT 2 HURRICANE POLICY CONDITION ACTIONS A. Hurricane Watch 1. Obtain weather updates every four hours from the system operator.

2. Test Diesel Generators in accordance with Surveillance Test Procedure 0-8.

B. Hurricane Warning 1. Secure outside equipment.

2. Shut intake watertight doors and hatches.
3. Recall emergency teams. Emergency team leaders must ensure they have adequate personnel for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coverage.

C. Onsite winds expected 1. Reduce power on both units to to reach greater than 300 MWe.

70 mph or sustained onsite wind speed measured at greater than 60 mph.

D. Onsite winds expected to 1. Place both units in hot standby using reach greater than 90 mph existing procedures.

or sustained onsite wind speed measured at greater than 80 mph l