ML20214Q719

From kanterella
Jump to navigation Jump to search
Public Version of Revs to Emergency Plan Implementing Procedures RP/0/A/5000/02,RP/0/A/5000/03,RP/0/A/5000/04, RP/0/A/5000/05 & RP/0/A/5000/06
ML20214Q719
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/03/1986
From: Bolch M
DUKE POWER CO.
To:
Shared Package
ML20214Q703 List:
References
PROC-860703, NUDOCS 8609260264
Download: ML20214Q719 (55)


Text

e-a

. ' GEGUL ATORY INFORMATION DISTRI. JTION SYSTEM (R IDS)

ACC M3 ION NOR'~"~~: '_ z.m- DCC.DATE. 56/07/C8 NOTARI?ED: NO DOCKET #

F?C IL: F.O -413 Cc taub a Nucit.cr Utction, Unit 1, Duke Power Co. 05000413 00-114 C 3 t woti c fluc l e a r Station, Unit 2, Duke Power Co. 05000414 f(31M. NA iF AUl FiOR AIFILIATIGN l VC KER, M. IJ. Duke Power Co.

Ti?CIP. NAN:- 3:iCIPIENT AFFILIATION Mecord Gervices Branch (Document Control Desk)

SUllJEC1. Forwards Ceritral Files version of revs to Emergencu Plan Implementing Procedurer. RP/0/ A/5000/05 & RP/0/A/5000/06, p er 10CFilDO. 54 ( q ) . Wi th h el d.

DISTRIDUTION CODE: XOO5D COPIES RECEIVED: LTR ENCL l SI ZE: _

1 Il LE: Emerg P1an (CF Avai1)

NOTES: t PDR 2c y s ANDTG to FSAR. ASLB icy. 05000413 LPDR 2cys Ai IDT G to FGAR. ASL3 1 c y. 05000414 RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL PWN-A PD4 LA 1 0 PWR-A PD4 PD 1 0

,!ADDOUR,K #Y J 1 Iin:in8AL' W1/ Dnii-- ,J J 1 IE/DEPER/EP3 J$.2$3 2 2

} IE/DEPER/IRD Mk I 1 REG FILES /() 1 1 NOl E 3: 3 3 l

1 1

1 l

)

8609260264 860908 PDR ADOCK 00000413 F PDR ,

TOT AL NUMDER CF CCPIES REGUINLD: LTTP 11 ENCL  ?

/

..e .

3 Document Control Desk (S8ptember 8, 1986 o Page Two xc: (w/ enclosure)

Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NiJ. Suite 2900 Atlanta, Georgia 30323 (w/o enclosure)

NRC Resident Inspector Catawba Nuclear Station

~Q7iovv,a Jov7uu *

f, L GC r. 00:00" ?

M i

s' (1) I3 No: RP / 0 / A/ 5000 / 0 2 Fors 3e731 (3-'3a) Change (s) 7 ta d Incorporated Recype n 2 DUKE PC re.R COMPANY PRCCICLE PRCCESS RECORD PRI?ARATICN (2) STAT:CN:

(3) PRCCI CRI ;;;;I: NOTIFICATION OF UNUSUAL EVENT Mike Bolch DATE: July 3, 1986 (4) PREPARID ST:

1 & W DATE: M4db-/ b, / 7 (5) REVIUiED 3Y:

N/ : 2/3/g/.

Cross-Disciplinary Re,tew By: l (6) E MPCRARY APPROVAL (I? NECESSARY):

(SRC) Date:

Sy:

Date:

Sy:

- o l (7) APPROVED 3Y: \l~ bs' 04te:

(3) MISCI!.:.ANICCS : l Reviewed / Approved By: Date:

Reviewed / Approved By: Date:

COMPLE*!CN (9) CATE(S) PERTCR."3:

(10) PRCCEDURI COMPLETICN VERITICATION:

YES N/A Check lists and/or blanks properly ints:,aled, signed, dated or filled in N/ A or NiR, as appropriate?

YES N/A Listed enclosures attached? l YES N/A Data sheets attached, completed, dated and signed?

YES N/A Charts, grapas, etc. attacned and properly dated, identified and sacked?

YES N/A Acceptance cetteria met?

OA~E:

VIRITIED 3Y:

CA~E:

(11) PRCCI URE COMPLETION APPRCVED:

(12) REMARKS:

O

--n - , , . - . - - , -

, ~.. ,

RP/0/A/5000/02 DUKE POWER COMPANY CATAWBA NUCLEAR STATION NOTIFICATION OF UNUSUAL EVENT 1.0 SYMPTOMS 1.1 This condition exists when events are in process or have occurred which indicate a potential degradation of the level of safety of the plant.

? 2.0 IMMEDI ATE ACTIONS 2.1 Make initial notifications to individuals and organizations.

2.1.1 Complete Part I of Warning Message Form. (See example Enclosure 4.3.) Record receivers name and time (initial contact) .

NOTE: Emergency Coordinator shall initial forms when

' message is approved for transmission.

NOTE: Warning Message Forms are kept in the Control Room and TSC, ensure that all used forms are returned to the back of the notebook.

2.1.2 Notifications shall be as the order of Enclosure 4.1 indicates. See RP/0/B/5000/13 for NRC Notification.

NOTE: The State and County notification must be made within 15 minutes of declaration of the emergency.

2.2 Notify the Nuclear Production Duty Engineer using Enclosure 4.2.

3.0 SUBSEQUENT ACTIONS 3.1 Assess the emergency condition, then remain in a Notification of Unusual Event, escalate to a more severe class or terminate the emergency.

NOTE: When Terminating the Emergency use Parts I r, til of Warning Message Form.

3.2 Followup Notifications 3.2.1 See RP/0/A/5000/06, Follow-up Notifications

. - . . . - - , . . . - ~ _ _ . - _ . _ . . . . ~ , . - . - - -

  • RP/0/A/5000/02 o

Page 2 of 2 i

3.3 Augment shift resources to assess and respond to the emergency situation as needed.

3.4 The Compliance Engineer or delegate shall follow up with a written summary to county and state authorities, notified in 4.1.3 of Enclosure 4.1, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.0 ENCLOSURES I 4.1 Telephone Notification List 4.2 Emergency Message Format 4.3 Example Warning Message: Nuclear Facility to State / Local Government f

f l

i

.i i

s ,

' R P/0/ A/ Ergo /02 Enclosure 4.1 Page 1 cf 2 TELEPHONE NOTIFICATION LIST

( p , .'~; m initial 4.1.1 PR SP Conference Call Station OfficM,n'cer

'* :;gjk$$-T jyl:kblf.W Home C 1st Alternate - H. B. Barron r.1 2nd Alternate - J. W. Cox e

3rd Alternate - G. T. Smith e

4th Alternate - G. F. Caldwell e s 5th Alternate - W. R. McCollum

~'

4.1.2 Ccmpliance %cineer - C. L. Hartzell

  • Conference Call e

1st Alternate - M. E. Bolch 4

e 2nd Alternate - P. G. LeRoy Offic Hom

  • Ccnference Call Instruction nly)
1. Press and release the receiver button to put the first call on " hold" l You will hear three beeps, then dial tone.
2. Dial the third person's number. You can talk before including the original calier.
3. To begin the Conference call, press and release the receiver button. All three parties will be on the line. (If the line is busy or there's no answer, you can return to the original call by pressing and releasing the receiver button. )
4. All parties are disconnected when you hang up.
  • R P/0/ A/5CCO/02 Enclosure 4.1 Page 1 of 2 TELEPHONE NOTIFICATION LIST 4.1.3 State r, County Warnino Points **Use Warning Messace For:7 **
1. Mecklenh'tro County GROUP CALLD-Wy* -
p. yn - wr% '

7::"Gfp[ f. : .. . _

~

-2 Back-up: Emergency Radio, Code:

sk

2. York Countv M

$[; iib'IS[NIjEAb$h

,~

Back-up: Emergency Radio, Code:

3. Gaston Countv P:

A _

Back-up: Emergency Radio, Code

5. S.C. State. Columbi o -- M .-

P: .e A bEiN...> M 4.1.4 Operations Duty Engineer - Plant Page y- .m- u m. ,_ 3. <

4__.

A: See Current Operations Work List for Home Phone Number.

4.1.5 Nuclear Production Dutv Encinaa-

=

    • USE ENCLOSURt 4..

4.1.6 NRC Operations Center, Bethesda, Md. (RP/0/B/5000/13)

^ " ' ' - ' ~ ' - - - - - , - - - - - , _ _ _ _ , _ _ , _ _ _ , . _

I l g RP/0/A/5000/02

- Enclosure 4.2 Page 1 of 1 DUKE POWER COMPANY CATAWBA NUCLEAR STATION TO NUCLEAR PRODUCTION DUTY. ENGINEER EMERGENCY MESSAGE FORMAT

1. This is at Catawba Nuclear Station.

(Name and Title)

2. This is is not a drill. An X Unusual Event Alert Site Area Emergency General Emergency was declared by the Emergency Coordinator at on Unit # .

(Time)

3. Initiating Condition: (Give as close to the emergency plan description as possible together with station parameters used to determine emergency status.)
4. Corrective measures being taken:
5. There have have not not been any injuries to plant personnel.
6. Release of radioactivity: is taking place is not taking place
7. NRC Yes No; State Yes No; Countios Yes No; have been notified.
8. The Crisis Management Team should X should not be activated.

Corporate Communications and Company Management should be notified.

Ensure that Corporate Communications sends a copy of any News Release, to Control Room.

9. .I can be reacned at for follow-up information.

(Telephone Number)

10. Additional Comments:

Name of Person Contacted Date Time

, N ,

RP/0/A/5000/02 PART 1 INITIAL WARNING MESSAGE Enlosure 4.3 Page 1 of 4

1. Date: Time: hou rs
2. This is: Catawba Nuclear Station concerning Unit #

My name is: Telephone:

this message (Number ):

(a) Reports a real emergency.

(b) Reports the change in the class of a real emergency.

(c) Reports the termination of a real emergency.

(d) is an exercise message.

3. Message Authentication Message Sender: I authenticate as .

(a) IF A TERMINATION MESSAGE. GO TO PART 3.

4. The class of emergency is:

X (a) Unusual Event (c) Site Area Emergency (b) Alert (d) General Emergency

5. This class of emergency was declared at: on .

(time) (date)

6. The initiating event causing the emergency classification is:
7. The emergency condition:

(a) Does not involve the release of radioactive material from the plant.

(b) Involves the potential for a release, but no release is occu ring.

(c) Involves the release of radioactive materials.

8. The following protective actions are recommended:

X (a) No protective action is recommended at this time.

(e) Other recommendations:

9. I repeat, this message:

(a) Reports a real emergency.

(b) Reports a change in the classification of a real emergency.

(c) is an exercise message.

10. Do you have any questions? (Copy on separate sheet.)
11. RELAY THIS INFORMATION TO THE PERSONS LISTED IN YOUR ALERT PROCEDURES WHO MUST BE NOTIFIED OF INCIDENTS AT A NUCLEAR FACILITY.
  • For Message sender: record names of Message Receivers on Page 4.

END OF PART 1

a .

i

  • RP/0/A/5000/02

! PART 2 FOLLOW-UP MESSAGE (S) Enclosure 4.3 l Page 2 of 4

,l

! 1. Plant status: was tripped at (Time):

Reactor (a) is not tripped /

Plant is at: (a)  % power (c) hot shutdown (b) cold shutdown (d) cooling down 1

Prognosis is: (a) stable (c) degrading (b) Improving (d) unknown i

1 I 2. Emergency actions underway at the facility include:

3. Onsite support needed from offsite organizations:
4. Dose Projection Data

' Windspeed: mph Wind direction: From Precipation:

Release Type: (a) G rou nd/(b) Elevated Stability Class: ( A,B,C,D,E, F,or G) a

' Weighted dose Conversion Factor: (a) (R/hr)/(Ci/m')(whole body)

! (b) (R/hr)/(Ci/m')(Child Thyroid) 4 d Radiological Release: Noble Gas Equivalent Xe-133 & l-131 curies /sec.

lodine Equivalent curies /sec.

5. The type of actual or projected release is:

(a) Airborne (b) Waterborne (d) Other (c) Surface Spill 4 (e) No release is in progress or expected at this time (Skip Items 6, 7 L 8)

_a m 1

6. Release

! (a) will begin at hou rs .

(b) began at hours.

t

7. The estimated duration of the release is hou rs .
8. The source and description of the release is:

j a

l I

i

.- e. ,

RP/0/A/5000/02 PART 2 FOLLOW-UP MESSAGE (S) Continued Enclosure 4.3 Page 3 of 4

9. Dose Projections:

Dose Commitment Projected Integrated Dose in Rem Based on hours of release Whole Body Child Thyroid Whole Body Child Thyroid Distance (rem / hour)(Rem / Hour of inhalation) i Site Boundary l

2 miles 5 miles 10 miles

10. Field measurement of dose rate (mr/hr) or contamination (X)

(if available): _

Time Zone Distance from Direction from Whole Body Child Thyroid Plant Plant

11. I repeat, this message:

(a) Reports a real emergency.

(b) Reports a change in the class of a real emergency.

(c) is an exercise message.

12. Do you have any questions? (Copy on Separate Sheet)
          • EN D O F FO LLOW- U P MES S AG E ( S )*****
  • For Message Sender: Record names of Message Receivers on Page 4.

PART 3 TERMINATION MESSAGE

1. The event was terminated at on .

(time) (cate)

2. The event at the plant was terminatec for the f:Ilowing reason (s):
          • EN D OF TERMIN ATION MESS AGE-----
  • For Message Sender: record names of Message Recervers on Page 4,.

t 9 i s

RP/0/A/5000/02

- WARNING POINTS ALERTED Enclosure 4.3 4

Page 4 of 4 1.

, (name) (title) i (date) (time) (warning point)

! 2.

! (name) (title) i (date) (time) (warning point) 3.

.! (name) (title) i (date) (time) (warning point) i l 4.

(name) (title) lt

(date) (time) (warning point) 1 5.

] (title) 1 (name) i

! (date) (time) (warning point)

{ 6.

j (name) (title) i t

(date) (time) (warning point) 7.

l (name)

(tit'e)

! (date) (time) (warning point)

          • FO R U T I LI TY U S E O N LY*****

Release of this message approved by: at:

(Name) (Time) (Date) e a

i b

  • t i

i I .

8 f g Fo:-s 3;73; (3-3;i (1) IO No: RP/0/A/50004 Change (s> -

.A ,_ Iaco rpo ra ted Retype ,, 2 OCKE PCWIR COMPA.VY PROCEDtRE PRCCESS RECORD

, PREPARAT CN (2) STAT:CN:

(3) PRCCE URE !!T* T.:

(4) PREPARED 3Y: Mike Bolch DA;I: July 3, 1986

($) REVII'=ID SY: db 4x./ A(m. 0 ATE: btk 3 JC) y[,

1 l Cross-Dise:.plinary Review 3y: [. ./R: WJ/44 (6) EMPORARY APPRCVA:, (:7 NECESSARY):

Sy: (SRC) Date:

Sy: - Cate:

(7) APPRCVED BY: . Lv

  • M, . Oate:

d (S) MISCE!.* ANICUS: -

Reviewed / Approved By: Oate:

Reviewed / Approved Sy: Date:

CC."PEET:CN (9) CATE(5) PERTCR.'E.D:

(10) PRCCC URE COMP ETICN VERITICATION:

YES N/A Check lists and/or blanks properly 1stt:aled signed, dated or filled in N/A or NiR. as appropetate?

YES N/A I.isted enclosures attached?

YES N/A Data sheets attached, completed, dated and signed?

TIS ' N/A Charts, graphs, etc. attached and properly dated.

identified and sarted?

YES N/A Acceptance ersteria set?

VER:7!E3 3Y: OATI:

(11) PRCCC URE OCMP27:0N APPROVED: OATE:

(12) RI". ARKS:

e

f

' & l l

RP/0/A/5000/03 DUKE POWER COMPANY CATAWBA NUCLEAR STATION ALERT 1.0 SYMPTOMS 1.1 Events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant.

2.0 IMMEDI ATE ACTIONS 2.1 Make initial notifications to individuals and organizations.

2.1.1 Complete Part I of Warning Message Form (see example Enclosure 4.3). Record receiver's name and time d

(initial contact).

NOTE: Emergency Coordinator shall initial forms when message is approved for transmission.

NOTE: Warning Message forms are kept in a Notebook in the Control Room and TSC, ensure that all used forms are returned to the back of the notebook.

2.1.2 Notifications sh'all be as the order of Enclosure 4.1 indicates. See RP/0/B/5000/13 for NRC Notification.

NOTE: The State and County notification must be made within 15 minutes of declaration of the emergency.

2.1.3 Advise station personnel to activate TSC and OSC.

2.1.4 Complete Enclosure 4.2 and advise the Nuclear Production Duty Engineer to bring the CMC to standby.

3.0 SUBSEQUENT ACTIONS i 3.1 Accident Assessment:

1 3.1.1 Dispatch on site monitoring teams with associated communications equipment, see HP/0/B/1009/09.

i i

! 3.2 Follow up Notifications.

3.2.1 See RP/0/A/5000/06, Follow-up Notifications.

3.3 Recommend Protective Action Offsite NOTE Protective Action Recommendations are obtained from: OAC Program " Nuclear-23" or RP/0/A/5000/11, if the OAC is not operational, for Operations Personnel. If you have determined the need for the offsite protective actions, then reasses the emergency classification. You are no longer in an Alert situation. .

., . - - , , - . - , - - . , . - , . , - , . . . -- - - -~ . , - . ..

, s

' RP/0/A/5000/03  !

Page 2 of 2 I 3.4 If the emergency situation is rapidly degrading then conduct a Site Assembly, see RP/0/A/5000/10.

3.5 Augment shift resources to assess and respond to the emergency situation as needed.

3.6 Assess the emergency condition, then remain in an Alert, escalate to a more severe class, reduce the Emergency Class or terminate the emergency.

3.7 The Compliance Engineer or delegate shall close out the emergency with verbal summary to county and state authorities, notified in 4.1.3 of Enclosure 4.1, followed by written summary within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

4.0 ENCLOSURES 4.1 Telephone Notification List 4.2 Emergency Message Format 4.3 Example Warning Message: Nuclear Facility to State / Local Government I

6 RP/0/A/5000/03 Enclosure 4.1 Page 1 of 2 TELEPHONE NOTICICATION LIST 7((;ejs N Initial 4.1.1 Station Mannone - ' gy > t  ;^ Conference Call

~ #"

Offic 5^ ^f f - : a f a. ;!g y' ist Alternate - H. B. Barron.

Office ^ um-. . ,

Homej .y 2nd Alternate - J. W. Cox 3rd Alternate - G. T. Smith e ~.

4th Altern += - B. F. Caldwell Offic Home ,

5th Alterna = - W. R. McCollum Offic Hem ...

4.1.2 Ccmpliance Fncineer - C. L. Hartzell

  • Conference Call Office <M Home ;f Q $ fhi% ,-

1st Alternate - M. E. Bolch 2nd Alternate - P. G. LeRoy Office '

Home

/

  • Conference Call Instructions
1. Press and release the receiver button to put the first call on " hold".

You will hear three beeps, then di:1 tona.

2. Dial the third person's number. You can talk before including the original caller.
3. To begin the Conference call,. press and release the receiver button. All three parties will be on the line. (if the line is busy or there's no answer, you can return to the original call by pressing and releasing the receiver button. )
4. All parties are disconnected when you hang up.

RP/0/A/5000/03 Enclosure 4.1 Page 2 of 2 2.1.2 State 7, County Warninc Points *'Use Warning Message Form **

1. Mecklenburg County GROUP CAL ~I -

s b

P: > -~ ' _7 A lN"cmergency Back-up.

f. Radio, Code: 2.{ y
2. York Countv . I p *f bbIh$ ? W :k Back-up: Emergency Radio, Code: < P-
3. Gaston County ,
p. -

p1 k y;

.f d dy_ M .

Back-up: Emergency Radio, Code t

i

5. S.C. Stata c'"- -

4.1.4 Operations Duty Engineer - Plant Page w n;ww--ame - .

A: See current Operations work List for Home Phone Number.

4.1.5 Nuclear Production Dutv Engineer e 2 m:- .

l

m. . ,_ v. _ ~ _

l

    • USE ENCLOSURE 4.2 " l l

4.1.6 NRC Operations Center, Bethesda, Md. (RP/0/B/5000/13) l 6

, t l

m

E RP/0/A/5000/03

- Enclosure 4.2 Page 1 of 2 DUKE POWER COMPANY CATAWBA NUCLEAR STATION TO NUCLEAR PRODUCTION DUTY ENGINEER EMERGENCY MESSAGE FORMAT

1. This is at Catawba Nuclear Station.

(Name and Title)

2. This is is not a drill. An Unusual Event X Alert Site Area Emergency General Emergency was declared by the Emergency Coordinator at on Unit # .

(Time)

3. Initiating Condition: (Give as close to the emergency plan description as possible together with station parameters used to determine emergency status.)
4. Corrective measures being taken:
5. There have have not not been any injuries to plant personnel.
6. Release of radioactivity: is taking place is not taking place
7. NRC Yes No; State Yes No; Counties Yes No; have been notified.
8. The Crisis Management Team X should be told to standby.

Corporate Communications and Company Management should be notified.

Ensure that Corporate Communications sends a copy of any News Release, to Control Room.

9. I can be reached at for follow-up information.

(Telephone Number)

10. Additional Comments:

Name of Person Contacted Date Time

+

i 1

  • RP/0/A/5000/03 PART 1 INITIAL WARNING MESSAGE Enlosure 4.3 Page 1 of 4
1. Date: Time: hours
2. This is: Catawba Nuclear Station concerning Unit #

My name is: Telephone:

this message (Number ):

(a) Reports a real emergency.

(b) Reports the change in the class of a real emergency.

(c) Reports the termination of a real emergency.

(d) is an exercise message.

3. Message Authentication Message Sender: I authenticate as .

(a) IF A TERMINATION MESSAGE. GO TO PART 3.

4. The class of emergency is:

(a) Unusual Event (c) Site Area Emergency X (b) Alert (d) General Emergency

5. This class of emergency was declared at: on .

(time) (date)

6. The initiating event causing the emergency classification is:
7. The emergency condition:

(a) Does not involve the release of radioactive material from the plant.

(b) Involves the potential for a release, but no release is occu ring.

(c) involves the release of radioactive materials.

8. The following protective actions are recommended:

(a) No protective action is recommended at this time.

(e) Other recommendations:

9. I repeat, this message:

(a) Reports a real emergency.

(b) Reports a change in the classification of a real emergency.

(c) is an exercise message.

10. Do you have any questions? (Copy on separate sheet.)
11. RELAY THIS INFORMATION TO THE PERSONS LISTED IN YOUR ALERT PROCEDURES WHO MUST BE NOTIFIED OF INCIDENTS AT A NUCLEAR FACILITY.
  • For Message sender: record names of Message Receivers on Page 4.

END OF PART 1 ,

w s

RP/0/A/5000/03 PART 2 FOLLOW-UP MESSAGE (S) Enclosure 4.3 Page 2 of 4

1. Plant status:

Reactor (a) is not tripped /__ was tripped at (Time):

Plant is at: (a)  % power (c) hot shutdown (b) cold shutdown (d) cooling down Prognosis is: (a) stable (c) degrading (b) Improving (d) unknown

2. Emergency actions underway at the facility include:
3. Onsite support needed from offsite organizations:
4. Dose Projection Data Windspeed: mph Wind direction: From Precipation: '

Release Type: (a) G round/(b) Elevated Stability Class: ( A, B,C, D, E, F,or G) l Weighted dose Conversion Factor: (a) (R/hr)/(Ci/m')(whole body)

(b) (R/hr)/(Ci/m*)(Child Thyroid)

Radiological Release: Noble Gas Equivalent Xe-133 & I-131 curies /sec.

lodine Equivalent l curies /sec.

5. The type of actual or projected release is:

(a) Airborne (b) Waterborne (c) Surface Spill (d) Other (e) No release is in progress or expected at this time (Skip Items 6, 7 L 8)

6. Release (a) will begin at hou rs .

(b) began at hours, j

7. The estimated duration of the release is hours.
8. The source and description of the release is:

. . .. _- _ _ . - ._ . . - _ . - _ _ .._- _ - _ _ ___e__ _ ._ .. _ _ _ . . _ . _ _ _.-- - _

  • RP/0/A/5000/03

! PART 2 FOLLOW-UP MESSAGE (S) Continued Enclosure Page 3 of 4 4.3 i.

! 9. Dose Projections:

1 Dose Commitment Projected Integrated J

Dose in Rom '

i Based on hou rs

of release l ll Whole Body Child Thyroid Whole Body Child Thyroid Distance (rem / hour)(Rem / Hour of inhalation)

Site j Boundary i

2 miles l

^

l 5 miles 1

10 miles l

h i

10. Field measurement of dose rate (mr/hr) or contamination (X)

(if available):

Time Zone Distance from Direction from Whole Body Child Thyroid 1 Plant Plant 5

i i

11. I repeat, this message:

I (a) Reports a real emergency.

' (b) Reports a change in the class of a real emergency.

(c) is an exercise message.

i

12. Do you have any questions? (Copy on Separate Sheet)

! *****END OF FOLLOW-UP MESSAGE (S)****

i 1

  • For Message Sender: Record names of Message Receivers on Page 4 PART 3 TERMINATION MESSAGE
1. The event was terminated at on .

i (time) (date)

2. The event at the plant was terminated for the following reason (s):

i j

i

          • END OF TERMIN ATION MESSAGE *****

t

  • For Message Sender: record names of Message Receivers on Page 4. .

lI m er-g.yp,y---.- .w---.y,..g w-T-em-e-- n-m--t---+gn,y--- -,v-----

9- ---ep-----t-*-w w-wr- 'e*-9 e - eupww w-Nw--'--e=if-=m-t==-----wN-e%.- -i--,--*g- p-mmt-, e,-- -mv +%+,-- .',-y

t l . RP/0/A/5000/03

^

WARNING POINTS ALERTED Enclosure 4.3 Page 4 of 4 1.

(name) (title) 1 (date) (time) (warning point) 2.

(title) 4 (name) i (date) (time) (warning point) 3.

(name) (title) v (date) (time) (warning point) i 4.

1 (name) (title) i (date) (time) (warning point) 5.

(name) (title)

(date) (time) (warning point) 4 6.

(name) (title)

(date) (time) (warning point) 7.

(name) (title)

$ l (date) (time) (warning point) ,

l

          • FOR UTILITY USE ONLY*****

I Release of this message approved by: at:

(Name) (Time) (Date)

I l

1 I

. _ . _ _ _ . _ _ . . . _ _ _ __._.__. _ _ _ . . _ . _ _ _ . _ - . . _ _ . . . _ ~ - . , _ _ _ _ _ . . . . _ , _ . . _ _ . _ _ , . . _ . - . _ _ _ - . _ _ _ _ _ _ _ _

Form 34731 (3-3a) (1) I:' No : RP/ 0/ A/ 5000 /04 Changels) 7 ::

a Incorporated Retype = 2 CUKE PCWER COMPANY PRCCC URI PRCCISS RICCRD PREPARATION (C) STAT:CN:

Site Area Emergency (3) PRCCC URE TIT:.E:

Mike Bolch CATE: July 3, 1986 (a) PRIPARID BY:

(1) RIVII*T.D 3Y: h / An A/h-* OATE: b dt.,- /Wb Cross-Disciplinary Review By: 7d /R: 2/5/cFt (6) 3MPCRARY APPROVAI. (II NECISSARY):

Sy: (SRC) Date:

I Sy: - Date:

(7) APPRCVID 3Y: Lv Cate:

^

' !*S s:

(8) MISCII.I.ANICUS :

Reviewed / Approved By: Date:

Reviewed / Approved Sy: Date:

CC.wPlIT:CN (9) DATI(S) PIRTCR.J.D:

(10) PRCCC URI COMPLITICN VIRITICATICN:

TIS N/A Check lists and/or blanks properly tatttaled, signed, dated or filled in N/A or NiR as appropetate?

TES N/A Listed enclosures attached?

YES N/A Data sneets attached, completed, dated and signed?

TIS N/A Charts, grapas, etc. attached and properly dated, identified and sacked?

TES N/A Acceptance criteria set?

VER: TIC 3Y: OATI:

I DATE:

j (11) PRCCCURI COMPLIT CN APPRC'.T.D:

! (12) RIMARKS:

1 9

e c , - _ . - - - .. -

4 d

RP/0/A/5000/04 i

DUKE POWER COMPANY CATAWBA NUCLEAR STATION SITE AREA EMERGENCY 1.0 SYMPTOMS 1.1 Events are in process or have occurred which involve an actual or likely major failures of plant functions needed for protection of the public.

2.0 IMMEDI ATE ACTIONS, I

2.1 Make initial notifications to individuals and organizations.

h 4

' 1.1- Complete Part I of Warning Message Form (see Example Enclosure 4.3). Record receiver's name and time 1; (initial contact).

1 NOTE: Emergency Coordinator shall initial forms when message is approved for transmission, j NOTE: Warning Message forms are kept in a notebook in the i

Control Room and TSC, ensure that all used forms are returned to the back of the notebook.

i

2.1.2 Notifications shall be as the order of Enclosure 4.1 Indicates. See RP/0/B/5000/13 for NRC Notification.

l

! NOTE: The State and County notification must be made l

within 15 minutes of declaration of the emergency.

1 l 2.1.3 Advise station personnel to activate TSC and OSC.

i 2.1.4 Complete Enclosure 4.2 and advise the Nuclear i Production Duty Engineer to activate the CMC.

2.2 Protective Action Offsite 2.2.1 Recommend to Offsite Agencies that the Alerting Sirens be sounded and that the EBS be activated to inform the public of a potential for later protective actions.

j 2.3 Protective Action Onsite 1

2.3.1 Conduct a Site Assembly, see RP/0/A/5000/10.

i l

- - - - _ - - - - --- -, ., .- - ~ , - - - - - - , - - - - - , - -

i RP/0/A/5000/04 4

- Page 2 of 3 l

3.0 SUBSEQUENT ACTIONS 1

3.1 Accident Assessment:

3.1.1 Dispatch field monitoring teams with associated communications equipment, see HP/0/B/1009/04.

I 3.2 Follow up Notifications.

3.2.1 See RP/0/A/5000/06, Follow-up Notifications.

l 3.3 Follow-up Recommend Protective Action Offsite NOTE Prate.ct!ve Action Recommendations are obtained from: OAC Program " Nuclear-23" or RP/0/A/5000/11, if the OAC is not available, for Operations personnel.

J 3.3.1 The Emergency Coordinator shall make Protective Action

' Recommendations to the affected county warning points and to both SC and NC state warning points (Emergency Operations Center if established) or the designated I state department as per the state's Radiological Emergency Response Plan. See Enclosure 4.4 for aid in I protective action da".: n making.

NOTE This authority shall not be delegated to other elements i of the emergency organization.

3.3.2 If actual release of radioactive material will result in a projected dose to the population of:

i EPA Protective Action Guides Whole Body Thyroid Recommendation

<1 Rem <5 Rem No Protective Action is Required.

1 to <5 Rem 5 to <25 Rem Recommend seeking shelter and wait

for further instruction. Consider I evacuation particularly for children L pregnant women. Control access to affected areas.

i

> 5 Rem > 25 Rem Recommend mandatory evacuation of l

population in the affected areas.

Control access to affected areas.

i 9

I t

RP/0/A/5000/04 Page 3 of 3

! NOTE i

Monitor environmental radiation levels to verify and adjust recommendations as necessary.

I 3.4 Follow-up Protective Actions On-site.

i 3.4.1 Consider evacuation of non-essential station personnel, l see RP/0/A/5000/10.

i i 3.4.2 Emergency Worker Exposure Limits t

l Skin of W.B. or Activity Extremeties (Rem) Whole Body (Rem) Thyroid (Reml

]

j Normal Dose Limit 75 5 30 Emergencies (a) 75 25 125 i

Lifesaving Activities (a)(b) 375 75 150(c)

(a) Appropriate controls of emergency workers, include: time limitations, resprators and Potassium lodide (Kl) - See i H P/0/B/1009/16. ,

The Emergency Coordinator may authorize doses to these limits.

(b) Volunteers only.

t (c) Although respirators and Potassium lodide should be used

where effective for emergency team work, Thyroid dose may not be a limiting factor for lifesaving missions.

3.5 Augment shift resources to assess and respond to the emergency I situation as needed.

1

3.6 Assess the emergency condition, then remain in a Site Area Emergency, escalate to a more severe class, reduce the emergency class, or terminate the emergency.

3.7 The Recovery Manager at the Crisis Management Center shall close out or recommend reduction of the emergency class, by briefing of offsite authorities at the Crisis Management Center or by phone if necessary, followed by written summary within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

4.0 ENCLOSURES l 4.1 Telephone Notification List 4.2 Emergency Massage Format I

4.3 Example Warning Message
Nuclear Facility to State / Local Government 4.4 Protective Action Recommendation Flow Chart 4.5 10 Mlle Emergency Planning Zone (EPZ) Map and Wind Direction '

Determination Worksheet.

ENCLOSURE 4.2

' PAGE1OF1

! DUKE POWER COMPANY e

CATAWBA NUCLEAR STATION i

TO NUCLEAR PRODUCTION OUTY ENGINEER EMERGENCY MESSAGE FORMAT at Catawba Nuclear Station.

f 1. This is

' (Name and Title) is is not a drill. An Unusual Event

2. This Alert X Site Area Emergency General Emergency T

was declared by the Emergency Coordinator at on Unit e_.

, (Time)

Initiating Condition: (Give as close to the emergency plan description as 3.

possible together with station parameters used to determine emergency status.)

4. Corrective measures being taken:

i

)

There have have not been any injuries to plant personnel.

5.

Release of radioactivity: is taking place

6. is not taking place No; State Yes No;
7. NRC Yes ,

Counties Yes No; have been notified.

j 1

The Crisis Management Team X should should not be activated.

8. Ensure l Corporate Communications & Company Management should be notified.

J that Corporate Communications sends a copy of any News Release to Control i

Room.

for follow-up information.

9. I can be reached at i

' (Telephone Number) i l

Additional Comments: .

10.

s l

Date Time l Name of Person Contacted I

i l

i

s a .

RP/0/A/5000/04 PART 1 INITIAL WARNING MESSAGE Enlosure 4.3 Page 1 of 4

1. Date: Time: hours
2. This is: Catawba Nuclear Station concerning Unit #

My name is: Telephone:

this message (Number ):

(a) Reports a real emergency.

(b) Reports the change in the class of a real emergency.

(c) Reports the termination of a real emergency.

(d) is an exercise message.

3. Message Authentication Message Sender: I authenticate as .

(a) IF A TERMINATION MESSAGE. GO TO PART 3.

4. The class of emergency is:

(a) Unusual Event X (c) Site Area Emergency (b) Alert (d) General Emergency

5. This class of emergency was declared at: on .

(time) (date)

6. The initiating event causing the emergency classification is:
7. The emergency condition:

(a) Does not involve the release of radioactive material from the plant.

(b) Involves the potential for a release, but no release is occuring.

(c) Involves the release of radioactive materials.

8. The following protective actions are recommended:

(a) No protective action is recommended at this time.

l (b) People living in zones remain indoors with the doors and windows closed, turn off air conditioners and other ventillation, monitor EBS stations.

(c) People living in zones evacuate thier homes and businesses and go to the designated shelter.

l (d) Pregnant women and children in zones remain )

indoors with the doors and windows closed, turn off air conditioners and other ventilation, and monitor EBS stations.

Y (e) Other reenmmendatinns; Activate the alerting _ siren _sy_s,lem,,

and inform the public via the Emergency Broadcast System.

9. I repeat, this message:

l (a) Reports a real emergency.

(b) Reports a change in the classification of a real emergency.

(c) is an exercise mossage.

10. Do you have any questions? (Copy on separate sheet.)
11. RELAY THIS INFORMATION TO THE PERSONS LISTED IN YOUR ALERT PROCEDURES WHO MUST BE NOTIFIED OF INCIDENTS AT A NUCLEAR -

FACILITY.

  • For Message sender: record names of Message Receivers on Page 4.

END OF P RT 1

_ - _ - .== _ _. .__ . _ _ -_ _ _ _ _ - - . . . ._.

. t ,

RP/0/A/5000/04 PART 2 FOLLOW-UP MESSAGE (S) Enclosure 4.3 Page 2 of 4

1. Plant status:

Reactor (a) is not tripped / was tripped at (Time):

l l

Plant is at: (a)  % power (c) hot shutdown l

d (b) cold shutdown (d) cooling down Prognosis is: (a) stable (c) degrading

! unknown (b) Improving (d)

2. Emergency actions underway at the facility include:

l 1

3. Onsite support needed from offsite organizations

4

4. Dose Projection Data Windspeed: mph Wind direction: From

]

Precipation:

Release Type: (a) Ground /(b) Elevated Stability Class: ( A,B,C,D,E,F,or G)

Weighted dose Conversion Factor: (a) (R/hr)/(Cl/m )(whole 2 body)

(b) (R/hr)/(Cl/m 8)(Child Thyroid)

Radiological Release: Noble Gas Equivalent cu ries.'s ec.

lodine Equivalent curies /sec.

[ 5. The type of actual or projected release is:

! (a) Airborne (b) Waterborne (c) Surface spill (d) Other (e) No release is in progress or expected at this time i

(Skip items 6, 7 t, 8)

6. Release will begin at hours, began at hours.
7. The estimated duration of the release is hours.

3

8. The source and description of the release is:

i 1

f l

}

i

4 I .

. RP/0/A/5000/04 PART 2 FOLLOW-UP MESSAGE (S) Continued Enclosure 4.3 Page 3 of 4

9. Dose Projections:

Dose Commitment Projected Integrated Dose in Rom Based on hours of release Whole Body Child Thyroid Distance (rem / hour)(Rem / Hour of inhalation) Whole Body Child Thyroid Site Boundary 2 miles 5 miles 10 miles

10. Field measurement of dose rate (mr/hr) or contamination (X)

(if available):

Time Zone Distance from Direction from Whole Body Child Thyroid Plant Plant

11. I repeat, this message:

(a) Reports a real emergency.

(b) Reports a change in the class of a real emergency.

(c) is an exercise message.

12. Do you have any questions? (Copy on Separate Sheet)
          • END OF FOLLOW-UP MESS AGE ( S)*****
  • For Message Sender: Record names of Message Receivers on Page 4 PART 3 TERMINATION MESSAGE 1, The event was terminated at on' . ~ ...

~(time) ~ (dais)

2. The event at the plant was terminated for the following reason (s):

i I

          • END OF TERMINATION MESSAGE *****
  • For Message Sender: record names of Message Receivers on Page 4 e

i i .

RP/0/A/5000/04 WARNING POINTS ALERTED Enclosure 4.3 Page 4 of 4 1.

(name) (title) 4 (date) (time) (warning point) 2.

(name) (title)

(date) (time) (warning point) 3.

i (name) (title)

(date) (time) (warning point) '

4.

(name) (title)

(date) (time) (warning point) i 5.

i (name) (titte) i l

! (date) (time) (warning point)

S.

(name) (title)

(date) (time) (warning point) j 7.

j (name) (title)

.i i (date) (time) (warning point)

*****FO R UTI LITY U S E O N LY*****

, Release of this message approved by: at:

(Name) (Time) (Data) f I .

. - _ - _ - , . - - - - , - _ - _ _ ,_ ___,_. ..,..- _... _ - .._~ __ , ~ _ - -., _.. -_.-___._-_.. - . _ _..-___ _ ._ _ _ -..-_ _ .. _ _ _

l 4

Page 1 of 1 RP/0/A/5000/04 SITE AREA EMERGENCY i ENCLOSURE 4.4 PROTECTIVE ACTION RECOMMENDATION FLOW CHART CLASSIFICATION is a

! SITE AREA EMERGENCY ONSITE OFFSITE L

1P Conduct a. Site Assembly Recommend Sirens be Sounded & Notify

& Consider an Evac. of the Public,via EBS, Non-Essential Personnel '

l of the Situation.

l L

I l l

i Continue Assessment t

3 i

l i .

i E. o ure 4.5 ,

CATN*3A NL' CLEAR STATION 10-MILE EMERGENCY PLANNING ZONE i (EPZ) MAP

- zone w EPz sounenry l

h1 Zone M wnter '

-b.

(

7

  • . ./

\

_g _

P2 h2

r. m .

e

(

===i. F1 A-3

.~

f P

l

~

k

., x., .

b

[ * I

, s. ,

7 a.: 3_ , fA,

) .' l 02

)

[ e.,

i -

i. '

, ,,,, j .

S.,

% g,

  • 4' ./

% . . 4 - ~

y,

+2 -

\ .

e ,.)~ T g_,'d;!

j . . .~. . .,

1, 1

l

Page 2 of 2 CUKE PCWER CCMPANY CATAW8A NUCLEAR STATICN RP/0/A/5000/04 ENCLOSURE 4.5 WIND DI. M CTION DETERMINATION WCRK SHEET Sased on wind direction (WO), cetermine the affected zones frem sne taoles

elow. Circle the wind direction and affected :enes.

If not availacle, use NOTE: Uccer tower wind direction is craferred.

lower WO, tnen use 'nD from National Weather Service.

IF WINO SPEED IS < 5 vow, THE AFFECTED ZCNES ARE A-0 A-1, 5-1.

A.

C-1, 0-1, E-1 and F-1.

3. IF WINO SPEED IS > 5 Sc4, SELECT THE AF:ECTED ICNES FRCM THE TABLES BELCW AS APPLICA8LE.

Table 2.1 Table 2.2

~

Affected 5-10 Mile Ractus Affected 0-5 Mile Radius Wind Direction Zones Wind Direction Zones .

A-0 l 0.1* - 360*

All 5 C-2, 0-2 0.1* - 22'  : C-1, 0-1 0.1 - 27' .

27' - 69' "C 2, 0-2. E-2 22' - 73*  ; C-1 C-1. E-1

C-1, C-1 E-1, F-1 69' - 95' = 0-2. E-2 F-2 73' - 108'

. 3 2' --->0-2. E-2, F-2, C- 3 108' - 120' r 0-1, E-1, F-1 958 r E-1, F-1 132' *.44'  : E-2, F-2 F-3 120' - 159' 159' - 207' A E-1, F-1. A-1 144' - 160* ---**E-2 F-2, F-3, A-2

& F-1, A-1, B-1 160' - 201' 7 F-2, F-3. A-2 207' - 247'

? A-1, 3-1 201' - 2 29'--**F-2, 8-3, A-2, S-2 247' - 265*

229' - 249' O : -3. A-2, 3-2 2558 - 298' 5 A-1 E-1, 2-1 2 8-1, C-1 .249' - 259' W A-2, A-3, 6-2 298* - 338' r B-1, C-1, 0-1 259' - 110*--p A-2, 6-2, C-2, A-3 338' - 360'.

290' - 104* = A-3, 3-2, C-2 304' - 133" 7 8-2, C-2 333' - 160*- r e-2, C-2, 0 2 f

r 1

i

Fors 3a731 (3-3a) (1) IO No: RP/0/ A/ 5000/ 05 Changetsj e sa 8 Incorporated Recype ,, 2 CC12 PCWER CCM.'ANY PRCCEURI PRCCISS RICORD PRIPARAT!0N (2) STAT:CN:

General Emergency (3) pgccccyz ;; :,I; l

Mike Bolch DATE: July 3, 1986 (4) PREPARID SY:

(3) RIVIIkC SY: Add h : ATE: O,b d /h Cross-Disciplinar/ Review Sy: e . .(700 N/ : 7/g/pc I

(6) EMPCRARY APPRCVA!. (:7 NECIS$ARY):

37: ($RO) Cate:

Sy: - Date:

l '

(7) APPRCVC 3Y: b ~

Date:

(S) MISCII.*.ANICUS :

Reviewed / Approved By: Date:

Reviewed / Approved Sy: Date:

COMP!.ET!CN (9) CATE(5) PERTCR.T :

(10) PRCCC URE CCMP!.ZTICN VIRITICATICN:

L Y13 N/A Check lists and/or blanus properly tsttaaled st;ned, dated or filled in N/ A or N,R. as appropriate?

TES N/A Listed esclosures attacted?

Data sneets attached. completed, dated and stased*

l YES _ N/A YES N/A Charts graphs, etc. attac:ed and properly dated. 1 identified and sorted? -

YIS N/A Acceptance criteria set?

  • 'IR T!C 3Y:

, OATI: 1 CATI: f (11) PRCCCURL C MP!.IT:CN APPROVC l

}

(12) A*E RX3:

RP/0/A/5000/05 ,

l DUKE POWER COMPANY CATAWBA NUCLEAR STATION GENERAL EMERGENCY 1.0 SYMPTOMS l 1.1 Events are in process or have occurred which involve an actual or imminent substantial core degradation or melting with potential for loss of containmsnt integrity.

2.0 IMMEDI ATE ACTIONS

! 2.1 Make initial notifications to individuals and organizations.

2.1.1 Complete Part I of Warning Message Form (see example Enclosure 4.3). Record receiver's name and time (initial contact).

NOTE: Emergency Coordinator shall initial forms when message is approved for transmission.

1 NOTE: Warning Message forms are kept in a notebook in the Control Room and TSC, ensure that all used forms are returned to the back of the notebook.

2.1.2 Notifications shall be as the order of Enclosure 4.1 indicates. See RP/0/B/5000/13 for NRC Notification.

NOTE: The State and County notification must be made within ]

15 minutes of declaration of the emergency.

l 2.1.3 Advise station personnel to activate TSC and OSC. .

1 i 2.1.4 Complete Enclosure 4.2 and advise the Nuclear Production l

Duty Engineer to activate the CMC.

l i

2.2 Protective Actions Offsite 2.2.1 Recommend to Offsite Agencies that all residents of the 2 mile radius zone (A 0) and any zone 5 miles downwind of the plant seek immediate shelter and await futher instructions.

2.3 Protective Action Onsite 2.3.1 Conduct a Site Assembly, see RP/0/A/5000/10, j

2.3.2 Evacuate non essential personnel to the Evacuation Relocation Centers, see RP/0/A/5000/10.

I, I

' RP/0/A/5000/05

- Page 2 of 3 2

3.0 SUBSEQUENT ACTIONS 3.1 Accident Assessment:

3.1.1 Dispatch field monitoring teams with associated communications equipment, see HP/0/B/1009/04.

3.2 Follow up Notifications.

3.2.1 See RP/0/A/5000/06, Follow-up Notifications.

3.3 Follow-up Recommend Protective Action Offsite NOTE Protective Action Recommendation are obtained from: OAC l

Program " Nuclear-23" or RP/0/A/5000/11, if the OAC is not

operational, for Operations personnel.

3.3.1 The Emergency Coordinator shall make Protective Action Recommendations to the affected county warning points and to both SC and NC state warning points (Emergency Operations Center if established) or the designated state department as per the state's Radiological Emergency Response Plan. See Enclosure 4.4 for aid in protective action decision making.

NOTE This authority shall not be delegated to other elements of the emergency organization.

3.3.2 If actual release of radioactive material will result in a projected dose to the population of:

j EPA Protective Action Guides Whole Body Thyroid Recommendation

<1 Rem <5 Rem No Protective Action is Required.

! I to <5 Rem 5 to <25 Rem Recommend seeking shelter and wait l

for further instruction. Consider evacuation particularly for children

& pregnant women. Control access to affected areas.

>5 Rem >25 Rem Recommend mandatory evacuation of population in the affected areas.

' Control access to affected areas.

l

i

- RP/0/A/5000/05

- Page 3 of 3 i

NOTE Monitor environmental radiation levels to verify and adjust recommendations as necessary, i

{ 3.4 Emergency Worker Exposure Limits i Skin of W.B. or Activity Extremeties (Rem) Whole Body (Rem) Thyroid (RemT Normal Dose Limit 75 5 30 l Emergencies (a) 75 25 125 j Lifesaving Activities (a)(b) 375 75 150(c)

(a) Appropriate controls of emergency workers, include: time limitations, respirators and Potassium lodide (KI) - See >

a HP/0/B/1009/16.

) The Emergency Coordinator may authorize doses to these limits.

l (b) Volunteers only.

(c)

Although respirators and Potassium lodido should be used where effective for emergency team work, Thyroid dose may not be a limiting factor for lifesaving missions.

3.5 Augment on shift resources to assess and respond to the emergency situation as needed, i 3.6 Assess the emergency condition, then remain in an General Emergency, j reduce the emergency class or terminate out the emergency.

l 3.7 The Recovery Manager at the Crisis Management Center shall close out the emergency or recommend reduction of the emergency class by briefing the offsite authorities at the Crisis Management Center l

or by phone if necessary, followed by written summary within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

l

4.0 ENCLOSURES 4.1 Telephone Notification List a

4.2 Emergency Message Format 4.3 Example Warning Message: Nuclear Facility to State / Local Government l

l 4.4 Protective Action Recommendation Flow Chart l

4.5 10 Mile Emergency Planning Zone (EPZ) Map and Wind Direction j Determination Worksheet l

l 1

f f

~

i f

i l

}

- RP/0/A/5000/05

- Enclosu.e 4.2 Page 1 of 1 DUKE POWER COMPANY CATAWBA NUCLEAR STATION TO NUCLEAR PRODUCTION DUTY ENGINEER EMERGENCY MESSAGE FORMAT I ,

l 1. This is at Catawba Nuclear' Station.

(Name and Title)

, 2. This is is not a drill. An Unusual Event I Alert Site Area Emergency l

X General Emergency I was declared by the Emergency Coordinator at on Unit e .

i (Time)

)

i

3. Initiating Condition: (Give as close to the emergency plan description as j

possible together with station parameters used to determine emergency status.)

4. Corrective measures being taken:
5. There have have not not been any injuries to plant personnel.
6. Release of radioactivity: is taking place is not taking place
7. NRC Yes No; State Yes No;
Counties Yes No; have been notified.

! 8. The Crisis Management Team X should should not be activated.

Corporate Communications and Company Management should be notified.

l Ensure that Corporate Communications sends a Copy of any News Release, to Control Room.

9. I can be reached at for follow up information.

(Telephone Number) 1

10. Additional Comments:

i I

1 i Name of Person Contacted Date Time j -

- RP/0/A/5000/05 PART 1 INITIAL WARNING MESSAGE Enlosure 4.3 Page 1 of 4

1. Date: Time: hours
2. This is: Catawba Nuclear Station concerning Unit #

My name is: Telephone:

this message (Number ):

(a) Reports a real emergency.

(b) Reports the change in the class of a real emergen'cy.

(c) Reports the termination of a real emergency.

(d) is an exercise message.

3. Message Authentication Message Sender: I authenticate as .

(a) IF A TERMINATION MESSAGE. GO TO PART 3.

4. The class of emergency is:

(a) Unusual Event (c) Site Area Emergency (b) Alert X (d) General Emergency

5. This cl ss of amergency was declared at: on .

(time) (date)

6. The initiating event causing the emergency classification is:
7. The emergency condition:

(a) Does not involve the release of radioactive material from the plant.

(b) Involves the potential for a release, but no release is occuring.

(c) Involves the release of radioactive materials.

8. The following protective actions are recommended:

(a) No protective action is recommended at this time.

X (b) People living in zones A-0

  • 5 mi DW remain indoors with the doors and windows closed, turn off air conditioners and other ventillation, monitor EBS stations. (see note)

(c) People living in zones evacuate thier homes and businesses and go to the designated shelter.

l (d) Pregnant women and children in zones remain indoors with the doors and windows closed, turn off air conditioners and other ventilation, and monitor EBS stations.

(e) Other recommendations:

NOTE: This recommendation applies to the immediate notification only.

9. I repeat, this message:

(a) Reports a real emergency.

(b) Reports a change in the classification of a real emergency.

(c) is an exercise message.

10. Do you have any questions? (Copy on separate sheet.)
11. RELAY THIS INFORMATION TO THE PERSONS LISTED IN YOUR ALERT PROCEDURES WHO MUST BE NOTIFIED OF INCIDENTS AT A NUCLEAR FACILITY. .
  • For Message sender: record names of Message Receivers on Page 4.

END OF PART 1

i

" RP/0/A/5000/05 PART 2 FOLLOW-UP MESSAGE (S) Enclosure 4.3 1, Page 2 of 4

1. Plant status:

Reactor (a) is not tripped / was tripped at (Time):

Plant is at: (a)  % power (c) hot shutdown (b) cold shutdown (d) cooling down Prognosis is: (a) stable (c) degrading (b) Improving (d) unknown

2. Emergency actions underway at the facility include:

i 3. Onsite support needed from offsite organizations:

4. Dose Projecfion Data Windspeed: mph Wind direction: From
Precipation:

Release Type: (a) G round/(b) Elevated Stability Class: ( A, B,C,D, E, F,or G) j Weighted dose Conversion Factor: (a) (R/hr)/(Ci/m 8)(whole body)

(b) (R/hr)/(Ci/m*)(Child Thyroid) l' Radiological Release: Noble Gas Equivalent Xe-133 r,1-131

' curies /sec.

lodine Equivalent curies /sec.

5. The type of actual or projected release is:

i (a) Airborne (b) Waterborne (c) Surface Spill (d) Other f

(e) No release is in progress or expected at this time l

(Skip items 6, 7 r, 8)
6. Release will begin at hou rs ,

began at hours.

I j 7. The estimated duration of the release is hours.

! 8. The source and description of the release is:

1 1 J

l 4

1 e

l

" RP/0/A/5000/05 PART 2 FOLLOW-UP MESSAGE (S) Continued Enclosure 4.3 Page 3 of 4

9. Dose Projections:

Dose Commitment Projected Integrated Dose in Rem Based on hours

' of release Whole Body Child Thyroid ,

Whole Body Child Thyroid Distance (rem / hour)(Rem / Hour of inhalation)

Site Boundary 2 miles 1

5 miles 10 miles l

10. Field measurement of dose rate (mr/hr) or contamination (X)

(if available):

j Time Zone Distance from Direction ,f rom Whole Body Child Thyroid Pla nt- Plant i 11. I repeat, this message:

(a) Reports a real emergency.

(b) Reports a change in the class of a real emergency.

(c) is an exercise message.

12. Do you have any questions? (Copy on Separate Sheet)
          • END OF FOLLOW-UP MESSAGE (S)*****
  • For Message Sender: Record names of Message Receivers on Page 4.

PART 3 TERMINATION MESSAGE

1. The event was terminated at on .

(time) (date)

2. The event at the plant was terminated for the following reason (s):

i

          • END OF TERMIN ATION MESS AGE *****
  • For Message Sender: record names of Message Receivers on Page 4. ,

~ -

e .

' RP/0/A/5000/05 WARNING POINTS ALERTED Enclosure 4.3 Page 4 of 4 1.

(name) (title)

(date) (time) (warning point)

C~%

2.

(name) (title)

(date) (time) (warning point) 3.

(name) (title)

(date) (time) (warning point) 4.

(name) (title)

(date) (time) (warning point) 5.

(name) (title)

(date) Itime) (warning point) 6.

(name) (title)

(date) (time) (warning point) 7.

(name) (title)

(date) (time) (warning point)

          • FOR UTILITY USE ONLY*****

Release of this message approved by: at:

(Name) (Time) (Date) l

, s .

A 2

RP/0/A/5000/05 GENERAL EMERGENCY ENCLOSURE 4.4 PROTECTIVE ACTION RECOMMENDATION FLOW CHART CLASSIFICATION is a GENERAL EMERGENCY Conduct a Site Evacuation Has Physical Yes Consider a 2MLR.

Control of Plant " Precaut.. Evac-Been Lost? +3 No immediately Redommend 2Mi.R.

& 5Mi.0.W. Shelter Indoors. Continue Assessment i No Yes Core Damage No EPA PAG's

Projected to be

+ A20% Actual Fission Products Exceeded or or Projmed? Measured in Environs?

pin Containment l ) GAP Activity? Yes Yes Recomrn[,od Action No

' in Accordance with Release in l EPA PAG's

% ogress or 4 See Section 3.3.2 Projected > Design No Leak Rate?-No Yes [ .

Re5Ernmend Recolnmend Reconwnend Shelter for Evacuation Evacuation Areas that 2M.R. & 5M.R. &

Cannot be SMI.D.W. 10M. D.W.

Evac. Before +1 +2 +1+2 Proceed with Plume Arrival W _. I Recoirdpidation j

+4 is Evac.IFeasble? l No +3 +4 Yes Abbreviations:

D.W.- Downwind (90* Sector)

~

Notes #1,#2,#3,#4 are on Page 2 .

  • CATAWBA Evacuation Time Estimates are on page 2.

a . .

Page 2 of 2

  • RP/0/A/5000/05 GENERAL EMERGENCY ENCLOSURE 4.4 PROTECTIVE ACTION RECOMMENDATION FLOW CHART Notest
1. For an evacuation recommendation, sheltering of the downw'ind subzones of the plume exposure EPZ should be recommended.
2. Concentrate on evacuation of areas nearest the plant.
3. The feasibility of an evacuation must be determined by responsible offsite authorities at the time of the emergency. Consideration should include:
a. Can State / County agencies support the evacuation?
b. Will weather condition inhibit evacuation?
c. Do bridge and road conditions present an impediment to evacuation?
d. Is the release continuous (>2 hours) or a puff? EPA -

520/1-75-001 Table 1.3.

4. Promptly relocate the population affected by grcund contamination following plume passage.
5. Evacuation Time Estimates for Catawba Plume Exposure EPZ:

Normal Adverse conditions conditions All Zones (except as noted) 3:25 hrs 3:25 hrs 4:00 hrs 6:15 hrs Zone C-2 3:25 hrs 4:00 hrs Zone B-2 Special Facilities (except as noted) 2:45 hrs 4:15 hrs i

special Facilities B-1,C-1,F-1,F-3 1:40 hrs 2:30 hrs l

~

.v , v,4, :vvvi va

. CATN43A NUCLEAR STATION Enclosure 4.5 10-MILE .MRGENCY PLANNING ZONE Page 1 of 2 l

(EPZ) MAP l amme zone or p2 sownesty ht Zone Number

~

l F3 / ..., .a./.

- ._ _ _ sg, . ...

I === _-_

._ al

  • A FS k3

(,,--

^

^ -

.* s

- P .. J ,

k1 -

< q ,

1

.2 D1

/

L.'

e -

l '\

I 1 \

P r

l 1- l 51 L ^ ,

%.=

== ,

, ( w -

^

\

.! OS ,- v - 61 .

%g'

, .) /

, M,' .

a s. .

,-% h (

a '

u-Q .c.) - -

s.' . '

',. .j / w h

-9 on ,;

l Q,

i d.c ., .. q. .~

l l

l

. - _. I

. )

Page 2 of 2 s'

CUKE PCWER CCMPANY CATAWBA NUCLEAR STATICN RP/0/A/5000/05 ENCLOSURE 4.5 WIND DIRECTION DETERMINATION 'aCRK SHEET Based on wind direction (WD), ceter-iine the affected zones from the tables celow. Circle the wind direction and affected :enes.

NOTE: Uccer tower wind direction is preferred. If not availacie, use lower WO, then use a0 frort National Weather Service.

A. IF WIND SPEED IS < 5 WP4, THE AFFECTED ZONES ARE A-0 A-1, B-1, C-1, 0-1, E-1 and F-1.

B. IF WIND SPEED IS > 5 MPu. SELECT THE AFFECTED ZONES FRCM THE TABLES BELOW AS APPLICABLE.

Taele 2.1 Table 2.2 0-5 Mile Radius Affected 5-10 Mile Radius Affected Zones Wind Direction Zones Wind Direction -

0.1* - 3c0*  ; A-0 M ~

? C-2, 0-2 0.1* - 22'

C-1 C-1 0.1 - 27' O C-1, 0-1, E-1 27' - 69' ---*C-2, 0-2, E-2 22' - 73*

73* - 108'----,C-1, 0-1, E-1, F-1 69' - 95'- 4 0-2 E-2, F-2 108' - 120* r 0-1. E-1 F-1 958 -

' 32* --m>0-2 E-2, F-2, F-3 132' - 144' E-2, F-2, F-3 120' - 159' r E-1, F-1

  1. E-1. F-1, A-1 144' '.60* -->E-2, F-2, F-3, A-2 159' - 207' 160* - 201' 7 F-2, F-3, A-2 207* - 247' r F-1, A-1, B-1 7 A-1, B-1 201' - 329' - W -2, F-3, A-2, B-2 2478 - 265' i A-1, B-1, C-1 229' - 309' O F-3, A-2, B-2 265' - 2988 29B' - 338' r B-1, C-1 249' - 259' > A-2 A-3, 3-2 338' - 360' r B-1, C-1, 0-1 259' - 2908--> A-2, B-2, C-2, A-3 290* - 304 A-3, B-2, C-2 304* - 133' 7 B-2, C-2 333* - 360' = B-2, C-2, 0-2 l

1

a .

s'

. (1) ID No: RP/ 0/ A/5000/ 0E Fors 3e731 (3-30) Change (s)0 to L Incorperated t Recype as DUKZ PokIR CCMPANY l PROCIDURE PRCCISS RICORD

', PRIPARATICN l CATAWBA  !

(2) STA*!CN:

Follow up Notifications (3) PRCCI URI .. .....: .

Mike Bolch DATI: Julv 3, 1986 (4) PRIFARID BY:

(5) REVII%ID BY: /E4L. M DATE:' W A - 5/f Cross-Disciplinary Review By: [ . [who N R: MJ/86 (6) *IMPORARY APPROVAI. (!? NICISSARY):

(SRO) Date:

Sy:

Date:

37:

(7) APPRCVID 3Y:

{\

1,w U'l Date: "

l l/

(3) MISCI!.:.ANICCS:

Reviewed / Approved 3y: Date:

Reviewed / Approved By:

Date:

CCMPLITICN (9) DATI(S) PIRECRMID:

(10) PRCCIDURE CCMP!.ITION VIRITICATION:

TIS N/A Check lists and/or blanks properly tntitaled, stgned, dated or filled in N/A or N/R as appropriate?

YIS N/A Listed enclosures attacted?

YES N/A Data sheets attached, completed, dated and signed?

YIS N/A Charts, graphs, etc. attacted and properly dated, identified and sacked?

TIS N/A Acceptance enteria set?

OA~I:

VIRIT:ID BY:

0ATI:

(11) PRCCIDURE CCMPLITICS APPROVT.D:

(12) RIMARKS:

l I _

RP/0/A/5000/06 DUKE POWER COMPANY CATAWBA NUCLEAR STATION FOLLOW-UP NOTIFICATIONS 1.0 SYMPTOMS 1.1 An emergency situation has developed which requires follow-up messages be transmitted to count and state government officials.

1.2 This procedure is for the Control Room Operations Personnel only.

2.0 IMMEDI ATE ACTIONS 2.1 Make follow-up notifications to the county and state Warning Points within 15 minutes of:

2.1.1 The escalation of any emergency situation. See applicable Emergency Response Procedure.

2.1.2 Anytime there is a ?rotective s Action Recommendation for the Public or any c~aange in Protective Action Recommendations.

3.0 SUBSEQUENT ACTIONS 3.1 Make follow-up notifications to county and state government officials according to the following schedule:

3.1.1 Notification of Unusual Event and Alert 1

o Every hour until the emergency is closed out.

0C o[s If there is any significant change to the situation.

9.E o As agreed upon with each individual agency.

NOTE: Documentation shall be maintained for any

' agreed upon schedule change and the interval shall not be greater than every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to any agency.

l

,..o ,

,' RP/0/A/5000/06 Page 2 of 2 3.1.2 Site Area Emergency and General Emergency o Every half hour until the emergency is closed out.

E o if there is any significant change to the situation.

E o As agreed upon with each individual agency.

NOTE: Documentation shall be maintained for any agreed upon schedule change and the interval shall ny be greater than every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to any agency.

3.2 Follow up notifications shall be made as indicated in Enclosure 4.1, Notification Matrix.

3.3 Warning Message Form 3.3.1 For Notification of Unusual Event use Parts 1, 3 & 4 of the Warning Message Form, as applicable.

3.3.2 For Alert, Site Area Emergency or General Emergency use Parts 1 & 4 for the initial Notification and Parts 1, 2 & 4 for the follow-up notifications.

4.0 ENCLOSURES 4.1 Notifications Matrix l

l i

.-n,-- - - - - -

+

.. o 4

Page 1 of 1 RP/0/A/5000/06 FOLLOW-UP NOTIFICATIONS ENCLOSURE 4.1 NOTIFICATION MATRIX l

Change in Status I initial Follow-up or Notification Notifications Emergency Class North Carolina 1 1 or as directed 1 South Carolina 2 3 2 i

i York County 4 4 4 Mecklenburg County 5 5 5 I

Gaston County 6 6 6 GROUP CA

1. NC Warnino Point - N.C. Highway Patrol - Raleigh, N.C. Selective Sign _ f
2. SC Warning Point - S.C. Dept. of Transportation - Columbia, S.C.

Selective Signa ._

3. SC Dept. of Health & Environmental Control - Duty Officer -

Columbia, S.C. Telephone Number to be provided by calling back to the Shift Supervisor.

4. York Co. Warning Point - York Sheriff's Deot. - Rock Hill, S. C.

Selective Signal +1ggg4,dM A. J - i

5. Mecklenburg Co. Warning Point - Mecklenburg Police Dept. -

Charlotte, N.C. Selective Signal _

6. Gaston Co. Werninc paint - Gaston Police Dent. - Gastonia, N . C.

SeIeetive Signal M(yg?l&3'Eg3(nrjggggiggy skey NOTE: Group Call */may be used for follow-up notifications but will access tiie S.C. Warning Point also - notify the S.C.

Warning Point to disregard the call.