ML20214P992

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-245/87-05 on 870414-0518 & Notice of Violation.Potential Generic Problem W/Timely Processing of License Action Requests Indicated.Response Requested within 90 Days of Ltr Receipt
ML20214P992
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/29/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20214P997 List:
References
NUDOCS 8706040198
Download: ML20214P992 (2)


See also: IR 05000245/1987005

Text

w

$

.

.

,

.

MAY 2 91987

Docket No. 50-245

.

Northeast Nuclear Energy Company

ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Routine Safety Inspection 50-245/87.-05 (4/14/87 to 5/18/87)

This letter transmits the report of the above subject inspection of Millstone Unit

1 by Mr. G. Grant of this office. The inspection findings have been discussed with

Mr. S. Scace of your staff.

Based on this inspection, it appears that the two activities set forth in the

Notice of Violation enclosed as Appendix A were not conducted in full compliance

with NRC requirements. These violations have been categorized by severity level

in accordance with 10 CFR Part 2, Appendix C, the " General Statement of Policy and

Procedure for NRC Enforcement Actions." You are required to respond to this letter

and, in so doing, should follow the instructions in Appendix A.

The violations in Appendix A, along with other amendment and exemption request de-

lays, indicate a potential generic problem with timely processing of license action

requests. In addition to the required violation response, please assess this con-

cern and notify me of your findings and any planned corrective measures within 90

days of receipt of this letter.

Thank you for your cooperation.

Sincerely,

prisinalSisned Bye

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Report 50-245/87-05

8706040198 870529 ~

PDR ADOCK 05000245

G PDR

I l

-

.

..

..

Northeast Nuclear Energy Company 2 NUDI291997

..

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ enc 1: .

Region I Docket Room (with concurrences) '

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

M. McBride, RI, Pilgrim

P. Swetland, SRI, Haddam Neck

J. Shedlosky, SRI, Millstone 3

J. Shea, LPM, NRR

R. Bores, DRSS

'

W. Lazarus, DRSS

R. Summers, DRP

RI:DPR RI:DRP R 1

'

GEDGs G?)

GrantImeo McCabe Wer!zin ger

5/29/87 sl29 g 7

0FFICIAL RECORD COPY

,

- .- ..,,, ..-,- .=..,,, . , . - . . - , - -