. S SEP 101986 Docket No. 50-346 Toledo Edison Company Attn: Mr. J. Williams, Jr.

Senior Vice President Nuclear 300 Madison Toledo, OH 43652 Gentlemen:

SUBJECT:

COST ESTIMATE REQUEST FROM TOLED0 EDIS0N COMPANY TO INSTALL ADDITIONAL CIRCUITRY AT THE DAVIS BESSE NUCLEAR POWER PLANT'S ECC/ADMINISTPATION BUILDING AND PERMISSION TO USE SITE PROPERTY FOR CONTINGENCY TELECOMMUNICATIONS Reference is made to a comunications survey which was conducted at the Davis Besse facility by an NRC contractor representative during November 1983. Based upon this survey, NRC Region III is initiating arrangements for the installation of contingency telecommunication equipment at the Davis Besse

site.

These arrangements consist of obtaining Toledo Edison Company's cost estimate to install additional telephone circuits in the ECC, and formalized permission to use space on the Met tower as a repeater location and on the ECC/ Administration Building roof as an antenna location, as described below.

The circuits, and repeater and antenna locations are essential elements of our emergency telecommunications plan for the Davis Besse site. It should be noted, that with the exception of the equipment installation described below, communications equipment will only be installed at any of the comunications sites in the event of an actual emergency or NRC participation drill, and will be removed imediately at the termination of the emergency or drill.

1. Agree to reserve an area on the roof of the ECC/ Administration Building for the installation of a Sinclair SRL-229 6 db gain antenna. The base of the antenna would be mounted at least 10 feet above the roof and at a minimum of 25 feet from any other antenna. It is suggested, in the interest of building appearance and roof construction impact, that a 10 foot piece of 3 inch heavy wall galvanized pipe be mounted at some convenient point to the screen wall surrounding the air conditioning unit.

This pipe would make a satisfactory mount for the antenna.

2. Install two WE-742 Terminal Blocks; one located in the NRC area of the ECC, the other on the roof of that building near the area reserved for the NRC antenna, in a weather proof container and using existing ducts. Exact placement to be determined by the Toledo Edison Company.
3. Install two DC control pairs (voice quality circuits) from the ECC terminal block to the roof terminal block. Lines can be run through existing cable ducts. ,

8609160194 860910 PDR I \

ADOCK 05000346 PDR

. s Toledo Edison Company SEP 101986

4. Agree to reserve an area at the 200 foot level of the Met tower for use by the NRC as an emergency repeater site. The low power of the equipment that would be installed at this point, coupled with the 50 feet of vertical separation between it and any meteorology ecuipment, will provide adequate radio frequency protection for the installed meteorology equipment.

Following receipt of your estimate NRC Region III will issue the necessary purchase order. Work should not commence prior to receipt of the purchase order.

If you should have any questions regarding the above, please feel free to contact either Ruth LaFreniere (312) 790-5577 or Linda Kers (312) 790-5711 of my staff.

l Enclosed for your information are the frequencies that the NRC equipment may use at each site. We appreciate your assistance in this matter.

Sincerely,

. irector Division of Radiation Safety and Safeguards

Enclosure:

Transmitter Frequencies cc w/ enclosure:

Senior Resident Inspector l Davis Besse J. Wasilk, Davis Besse cc w/o enclosure:

K. Perkins, 01E S. Cohen, TB D. Herman, BIFC RIII RIII RII R I-jtogw g A > RIII LaFFeniere 'Kers Snell d N 08/AN86 .p -

Alind g[g$6 v f/#/X

ENCLOSURE 4

ECC/ ADMINISTRATION BUILDING i 46.63 166.725 168.550 411.750 2

46.99 166.775 169.350 411.925 46.81 168.250 169.100 412.150 l 168.400 165.6625 412.200

}'

166.6125 169.100 417.300 167.100 165.6625 417.350 169.750 417.500

417.800 MET TOWER

! Transmit Receive Transmit Receive Transmit Receive

j. 49.73 48.63 168.400 166.6125' 411.750 417.300 49.77 46.99 167.100 169.750 411.925 417.350 49.91 46.81 169.350 166.725 412.150 417.500 412.200 417.800 t
All power levels will be at 6 watts or less.