ML20214M930

From kanterella
Jump to navigation Jump to search
Forwards Corrected Title Page to Insp Rept 50-424/87-29 Due to Administrative Error.Insp Date & Rept Number Shown Incorrectly
ML20214M930
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/22/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20214M933 List:
References
NUDOCS 8706010469
Download: ML20214M930 (3)


See also: IR 05000424/1987029

Text

-

ofEaa/

.

..

-

,

I%Y 2 21987

Docket No. 50-424

License No. NPF-61

j eorgia Power Company

G

ATTN: Mr. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: CORRECTION OF ERROR IN V0GTLE INSPECTION REPORT N0. 50-424/87-29

This letter refers to the subject Inspection Report transmitted to you via

our letter of May 8, 1987.

Due to an administrative error, it was necessary

to make a correction to the title page of the referenced report.

The

inspection date was shown as April 24-25, 1987, and the report number was

shown as 50-424/87-27.

Consequently, we request that you replace the existing

report title page with the enclosed corrected page.

Should you have any questions concerning this letter we will be glad to

discuss them with you.

Sincerely,

-

.g

a

.

Douglas M. Collins, Chief

Emergency Preparedness and

Radiological Protection Branch

Division of Radiation Safety and

Safeguards

Enclosure:

Inspection Report Title Page

cc w/ encl:

(See page 2)

8706010469 G70522

PDR

ADOCK 05000424

G

PDR

\\

l

s \\

l

SE01

_.

_

_

.

.

.g.

o

Georgia Power Company

2

cc w/ encl:

4. E. Conway, Senior Vice President &

Project Director

C. Whitney, General Manager Project

/ . Support

P

D. Rice, Vice President, Project

/ Engineering

VR. H. Pinson, Vice President, Project

Construction

vt. W. Hayes, Vogtle Quality

Assurance Manager

/G. B. Bockhold, General Manager,

Nuclear Operations

/L. Gucwa, Manager, Nuclear Safety

/ .and Licensing

J

A. Bailey, Project Licensing

i

Manager

jB.W. Churchill,Esq.,Shaw,

1.Pittman,PottsandTrowbridge

J

E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

/J. G. Ledbetter, Comissioner.

d.DepartmentofHumanResources

H. Badger, Office of Planning

and Budget

/D. Kirkland, III, Counsel,

Office of the Consumer's Utility

/ Council

4. Feig, Georgians Against

Nuclear Energy

/M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

/Dr.O.H. Paris,AdministrativeJudge

!

Atomic Safety and Licensing Board

,

d.PanelA. Linenberger, Jr., Administrative Judge

-

Atomic Safety and Licensing Board

,

Panel

'

bec w/ encl:

(Seepage 3)

,

.

,

l

!

i

. .

. -

-

- -

-

- -

- a

.

- .

. .-

...

Georgia Power Company

3

bec w/ encl:

1. Reis. 0GC

1

. M. Hill, IE

. Miller, NRR

. Brach, EDO

M. Sinkule RII'

f.Christnot,RII

NRC Resident Inspector

Document Control Desk

State of Georgia

%A

(b fd

&y

RII

RII

RW

WDRoss

tl

h e

70 /87

t/J1/87

Idt MSinkule

t

4/gg/87

- -

-

-

- -

- -

- -

-

-

-

-

- -

- -

- -

-