ML20214L615
| ML20214L615 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 05/22/1987 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20214L618 | List: |
| References | |
| NUDOCS 8706010027 | |
| Download: ML20214L615 (3) | |
See also: IR 05000373/1987014
Text
-.
_-
.
. .
,
.
MAY 221987
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the emergency pre)aredness exercise inspection conducted by
Mr. James Foster and others of t1is office on April 28-30, 1987, of activities
at the LaSalle County Station, Units 1 and 2, authorized by NRC Operating
Licenses No. NPF-11 and NPF-18, and to the discussion of our findings with
Mr. G. Diederich and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection re) ort identifies areas examined during
the inspection. Within these areas, tie inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
However, one weakness was identified which will need corrective
action by your staff.
This weakness is summarized in the enclosure to this
letter.
As required by 10 CFR 50, Appendix E (IV.F) any weaknesses that are
identified must be corrected and a written response submitted to this office
within 45 days.
In accordance with 10 CFR 2.790 of the Commission's regulations a copy of
thisletter,theenclosures,andyourresponsetothisletterwIllbeplaced
in the NRC Public Document Room.
8706010027 070522
y
ADOCK 05000373
/gg
g
i
_ _ _ _ - _ _ _ _ _ _ _ _ -
.
Commonwealth Edison Company
2
g g gg
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
marrginnt sised lir T.D. Etiaferer
W. D. Shafer, Chief
Radiological Protection Branch
Enclosures:
1.
Exercise Weaknesses
2.
Inspection Reports
No. 50-373/87014 DRSS
No. 50-374/87014 DRSS
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
G. J. Diederich, Plant
Manager
DCS/RSB(RIDS)
Licensing Fee _ Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
David Rosenblatt, Governor's
Office of Consumer Services
D. Matthews, EPB, NRR
W. Weaver, FEMA, RV
3
RII
RIII,
RIII
rig
'
r
qr
o
r
e
n
ee
Y.,
eb&
.
__ -
.
.
____
.
EXERCISE WEAKNESS
The post-accident sampling team failed to adequately demonstrate precautionary
actions and show increased awareness for Health Physics contamination control
during /87014-03; 50-374/87014-03) (Section 5d)the performance of a High Radiatio
(50-373
-
_
_