ML20214K798
| ML20214K798 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 11/19/1986 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil Public Service Enterprise Group |
| Shared Package | |
| ML20214K799 | List: |
| References | |
| NUDOCS 8612020467 | |
| Download: ML20214K798 (2) | |
See also: IR 05000354/1986049
Text
. _ - -
.-
4
NOV 191986
Docket No. 50-354
License No. NPF-57
Public Service Electric & Gas Company
ATTN: Mr. C. A. McNeill, Jr.
Vice President - Nuclear
Post Office Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject:
Inspection Report No. 50-354/86-49
This refers to the routine safety inspection conducted by Mr. L. Wink of this
office on October 11-16, 1986 at the Hope Creek Generating Station, Hancocks
Bridge, New Jersey, of activities authorized by NRC License No. NPF-57 and to
the discussions of our findings held by Mr. L. Wink with Mr. J. Nichols of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
This report also includes several items which were identified during the
Augmented Inspection Team (AIT) review of September 24 - October 3, 1986.
Our inspector also verified the steps you have taken to correct the violation
brought to your attention in the enclosure to our letter dated July 28, 1986.
We have no further questions regarding the steps you took to correct the
violation.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in 'the Notice of Violation, enclosed herewith as Appendix A.
This
violation has been categorized by severity level in accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR
. Part 2, Appendix C (Enforcement Policy 1986).
You are required to respond to
. this letter and in preparing your response, you should follow the instructions
in Appendix A.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
861202046'/ 861119
DR
ADOCK 0500
4
0FFICIAL RECORD COPY
IR HC 86-49 - 0001.0.0
\\
11/10/86
MO
\\
.
2
Your cooperatior "ith us in this matter is appreciated.
Sincerely,
,
Griginal Signed By:
Iec H. Bett ehusw .
Stewart D. Ebneter, Director
Division of Reactor Safety
Enclosures:
1._
Appendix A, Notice of Violation
2.
NRC Region I Inspection. Report No. 50-354/86-49
cc w/ encl:
P. R. H. Landrieu, Vice President - Engineering (Newark)
R. S. Salvesen, General Manager, Hope Creek Operations
A. E. Giardino, Manager, Station Quality Assurance
R. L. Mitt 1, General Manager, Nuclear Assurance and Regulation
.
W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic
Electric Company
L. A. Reiter, General Manager - Licensing and Reliability
Rcbecca A. Green, Bureau of Radiation Protection
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State'of New Jersey
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Robert J. Bores, DRSS
'
^
f
-[S
ek)
Bettenhausen
.
11//L/86
11/Q/86
11//f/86
.
0FFICIAL RECORD COPY
IR HC 86-49 - 0002.0.0
11/10/86
<
-
_
- . _ - - _ . _ - .
-_
. - _
_
.-
. . - - .
. -
- - - - .
_ _ _ _ _