ML20214J318

From kanterella
Jump to navigation Jump to search

Forwards Rev 12 to Physical Security Plan & Rev 6 to Safeguards Contingency Plan,Per 10CFR50.54(p).Revs Withheld (Ref 10CFR73.21)
ML20214J318
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/12/1986
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
TAC-65279, NUDOCS 8612010252
Download: ML20214J318 (2)


Text

/

c y-WASHINGTON PUBLIC POWER SUPPLY SYSTEM-P.O. Box 968

  • 3000 George \\nisitirugtort \\ Yay
  • Riciclartd. \\Yasisirugtort 9935 t,

?>,

WASmNGTON PUBllC POWER SUPPLY SYSTEM November 12, 1986 SAFEGUARDS INFORMATION (10CfR73.21)

LOCKl0 STORAGE REQUIRED Docket No. 50-397 Mr. M. D. Schuster Safeguards & Emergency Preparedness U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Subject:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-2 PHYSICAL SECURITY PLAN, REVISION 12 WNP-2 SAFEGUARDS CONTINGENCY PLAN, REVISION 6 Enclosed please find the sub.1ect document revisions.

The enclosures are submitted pursuant to 10 CFR 50.54 (p) and do not decrease the safeguards effectiveness of the approved plans.

These revisions describe changes made as a result of amendments identified in the Federal Register 27817, dated August 4,1986, and other administrative and procedural changes.

The enclosures contain Safeguards Information concerning security measures for the physical protection of Supply System facilities in which special nuclear material is used.

This information is to be protected in accordance with 10 CFR 73.21.

Should you have any questions concerning this submittal, please do not hesitate to contact me.

f

/

G. C. Sorensen, Manager Regulatory Programs

Enclosure:

Revision 12, WNP-2 Physical Security Plan (5 copies)

Revision 6, WNP-2 Safeguards Contingency Plan (5 copies) cc:

R. T. Dodds, Senior Resident Inspector, Nuclear Regulatory Commission (w/o attachment)

N. S. Reynolds, B. L. C. P and R (w/o attachment) 1 D. Williams, Bonneville Power Administration (w/o attachment)

J. O. Bradfute, Nuclear Regulatory Commission (w/o attachment) 0(

L. Norderhaug, Nuclear Regulatory Commission (w/o attachment) j E. Adensam, Nuclear Regulatory Commission (with attachment)

)C i 0 k

WASmNCION FUBLIC POWER SUPFLY SYSTEM THIS PAGE UNCONTROLLED WHEN 8612010252 861112 EGUARDS INFORMATION (10CFR73.21)

SEPMATED FROM ENCLOSURES.

DR ADOCK 0500 7

LCC/.ED SICUCE REQU: RED

o 6

STATE OF WASHINGTON

)

Subject:

Revision to WNP-2 Physical

)

Security & Safeguards Contingency County of Benton

)

Plans.

I, R. B. Glasscock, being duly sworn, subscribe to and say that I am the Director, Licensing & Assurance for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

R. B. Glasscock, Director Licensing & Assurance On this day personally appeared before me R. B. Glasscock to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this Q day of Mer m%Q

,1986.

8.Q. M eA Notary Public irbend for the State of Washington Residing at Q $ _ h S_m__y A m,d.

.y.,

.