Special Rept:On 870406,discovered That Door 1011-1 Did Not Properly Fit New Frame After Installation of New Lockset & High Security Lock Cylinder.Door Returned for Repair & Reinstalled on 870427,exceeding Tech Spec 2.19(7)
ML20214H328
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/13/1987
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LIC-87-298, NUDOCS 8705270348
Download: ML20214H328 (2)


Text

..

1 Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402/536-4000 2

MAY I 81987 O

Mr. Robert D. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Dear Mr. Martin:

Reference:

Docket No. 50-285

SUBJECT:

Special Report on Inoperability of Fire Barrier The Omaha Public Power District, holder of Operating License DPR-40, submits this special report pursuant to the requirements of Fort Calhoun Station Unit No.1 Technical Specification 2.19, " Fire Protection System".

Fort Calhoun Station Unit No. 1 Technical Specification Section 2.19(7) requires that all penetration fire barriers protecting safety-related areas shall be functional (intact). With a penetration fire barrier nonfunctional, within one hour, either establish a continuous firewatch on at least one side of the affected penetration, or verify the operability of fire detectors on at least one side of the penetration and establish an hourly firewatch patrol. Restore the nonfunctional penetration to functional status within seven days, or prepare and submit within an additional 30 days a report to the Nuclear Regulatory Commission pursuant to Technical Specification 5.9.3.

On April 6, 1987, door 1011-1, the # ire door separating fire area 32 from the  ;

turbine building, was removed as directed by Maintenance Order 871687 and sent off-site to be prepared for an upgraded lockset and high security lock cylinder. This upgrade was performed in anticipation of modificatio1 FC-86-117, " Security Barrier at Compressor Room". An hourly firewatch patrol was initiated for the affected areas within one hour of removing the door after verifying the operability of fire detectors. After replacing the door frame and reinstalling the door, it was discovered that the door did not properly fit the new frame. The door supplier recommended modifying the door. It was again sent off-site for repair and was not returned until April 27, 1987. The fire barrier was returned to operable status on May 13, 1987, 8705270348 870513 J l PDR ADOCK 05000285 y D-qH1 s eDn , qq 4s sm emoioumengugoppononnu i0

q Mr. Robert D. Martin LIC-87-298 Page Two and the firewatch terminated. This exceeded the seven-day limit specified in Technical Specification 2.19(7). This report is being issued within the 30-day limit specified in-Technical Specification 2.19(7); no further action is required.

Sincerely, W

R. L. Andrews Division Manager h ,

Nuclear Production RLA:rge i c: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.

Washington, DC 20036 Mr. W. A. Paulson, NRC Project Manager Mr. P. H. Harrell, NRC Senior Resident Inspector T. J. McIvor R. J. Mueller J. E. Lechner-l l