officicd
~
-
-
,
NOV 131986
Georgia Power Company
ATTN:fr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE 98, CHEMISTRY
The NRC has completed a detailed review, inspection, and verification of the
subject module which you submitted to the NRC.
Periodic inspections were
conducted at the Vogtle site, and the resultant findings were discussed with
members of your staff at the conclusion of these inspections. Technical reviews
were also conducted in NRC Bethesda offices, and the findings from these reviews
have also been discussed with your staff.
Areas contained in the module which were reviewed, examined, and verified are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
I
Based on the NRC review, Module 9B provides the framework for an acceptable water
chemistry program.
Inasmuch as the major elements of such a program (i.e.,
staffing, training, development of procedures, and construction of laboratory
facilities) had not been completed, our assessment of the Vogtle chemistry
program will be continued during future inspections.
During the review of this module, the staff's main concern was that the
implementation of the programs described in this module had progressed too
slowly.
However, a recent inspection indicated that significant progress has
been made toward completion of the water chemistry program.
We believe that
continued management attention is warranted to ensure completion of program
implementation by the projected fuel load date.
We will again be inspecting your programs for training and qualification of
personnel prior to licensing as part of the Near Term Operating License
Inspection Program and, during that inspection, we will assess the adequacy of
implementation of corrective actions associated with this review.
It is expected
that, at that time, all open items and unresolved issues associated with training
should be corrected.
Based upon your responsiveness and your ongoing efforts to correct the
deficiencies noted during this review, it appears that Module 9B will be
acceptable once corrective actions have been satisfactorily implemented and
remaining concerns have been adequately resolved.
861125030S 861113
ADOCK 05000424
0
J [
.
.
_
_
i
.
,
s,
.
.
Georgia Power Company
2
Should you have questions concerning this letter, please contact us.
Sincerely,
DRIGINAL SIGNED DY:
L NEl.SO:1 GRACE
J. Nelson Grace
'
Regional Administrator
Enclosure:
Inspection Report No. 50-424/86-33
cc w/enci:
J . P. O'Reilly, Senior Vice President
/. Nuclear Operations
E. Conway, Senior Vice President &
Project Director
D. O. Foster, Vice President, Project
/ Support
VP. D. Rice, Vice President, Project
_ j Engineering
VR. H. Pinson, Vice President, Project
/. Construction
T. Beckham, Vice President &
General Manager - Operations
/R.A. Thomas,VicePresident,
/. Licensing
D
S. Read, General Manager,
Quality Assurance
/C. W. Hayes, Vogtle Quality
Assurance Manager
vW. C. Ramsey, Manager -
vb. Readiness Review
B. Bockhold, General Manager,
Nuclear Operations
ML. Gucwa, Manager, Nuclear Safety
and Licensing
M. H. Googe, Project
Construction Manager
vE. D. Groover, Quality
Assurance Site Manager -
Construction
IJ.A. Bailey,ProjectLicensing
v'8. Manager
F. Trowbridge, Esq., Shaw,
- .Pittman, Potts and Trowbridge
B
W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
cc w/ encl:
(See page 3)
1
.
,
~ ~ .
.
Georgia Power Company
3
.
fcw/ encl:
(Continued)
jV E. L. Blake, Jr. , Esq. , Shaw,
,
Pittman, Potts and Trowbridge
/J.E. Joiner,Troutman, Sanders,
Lockerman and Ashmore
[J. G. Ledbetter, Commissioner,
Department of Human Resources
. H. Badger, Office of Planning
j and Budget
VD. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
/ Nuclear Energy
y'M. B. Margulies, Esq. , Chairman,
Atomic Safety and Licensing Board
/ Panel
V Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
/ Panel
s/G. A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
Panel
/B. P. Garde, Citizens Clinic, Director
Government Accountability Project
bec w/ encl:
\\/E. Reis, GS0
dW. M. Hill, IE
'
\\/M. Miller, NRR
4. Brach, GS0
yM. Sinkule, RII
v(. Christnot, RII
yNRC. Resident Inspector
Document Control Desk
State of Georgia
RII
RII
RII
RII
/
RII
RII
RI
i
WRd)s{ J/(k*/)/
0M1l
yJ6 kW VLBrowl.& /^ f
l/)
tN}G
i
lee
alker'
WGTo6fsen
DCollins JP ohr
MSinkuie
10/N/86 10 4 //86
10/2Z/86 10/7//86 10/ /86 10/
'86-
, ($//p/86
hples
oj)eo
RII
ELD
TNovalct% \\!G lev
MUL
k
EChristienbury
MErnst
B r es
'
10/ /86
86 10/ /86 10/ /86
l'/ t o /60
ti/.c/ge,
i