Forwards Insp Repts 50-498/87-03 & 50-499/87-03 on 870103-0308 & Notice of Violation.Actions Taken Re Previously Identified Insp Findings Also Examined
ML20214F005
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/15/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20214F006 List:
References
NUDOCS 8705220368
Download: ML20214F005 (2)


See also: IR 05000498/1987003

Text

--

M.

IIAY 151987

.

4

1

'In Reply Refer To:

Dockets:

50-498/87-03

50-499/87-03

~

Houston Lighting & Power Company

ATTN:

J. H. Goldberg

Group Vice President, Nuclear

.

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. D. R. Carpenter, T. Reis,

.H. F. Bundy, J. E. Cummins, and D. L. Kelley of this office during the period

January 3 through March 8, 1987, of activities authorized by NRC Construction

Permit CPPR-128 and 129 for South Texas Project, Units 1 and 2, and to the'

discussion of our findings with Mr. W. H. Kinsey and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included new fuel receipt, IE Bulletins

and Circulars, review of Unit 1 proof and review draft of Technical

Specifications, preoperational test witnessing, training review

general'

employee training.(GET), preoperational test procedure review, and site tours.

Within these areas,- the inspection consisted of selective examination of.

procedures and representative records, interviews with personnel, and

observations by the NRC inspector. The inspection-findings are documented in

the enclosed inspection report.'

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

ES

C: PBb

C:RPB

d[o .

/

R

RI

C

RPB/

RPB

elley p andell

Cqrpenter/lr

TReis

HFBun

G

stable JEGagli

f/$ /87

f/V/87

f/4/87 5/7/87

flW/87

/ /87

$/)S/

'

'

\\

0

yt

,

8705220368 870515

7

g

'

<

PDR

ADOCK 05000498

i

PDR

O

ry

-

c

...

-

1

Houston Lighting & Power. Company

- - 2_ -

'

,

.

.

.

Should you have any questions concerning this inspection, we_will be pleased to

i

_ discuss them with you.

^

Sincerely,

Ekh$ud Signed By

J. E. Gagilardo '

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

,

50-498/87-03

50-499/87-03

cc w/ enclosures:

Houston Lighting & Power Company

ATTN: M..Wisenberg, Manager,

Nuclear Licensing

P. 0. Box 1700

Houston, Texas 77001

~

!

Texas Radiation Control Program Director

1

bec to DMB (IE01)

bec distrib~. by,RIV:

  • RPB

DRSP

_

,

  • RRI-0PS

R.'D. Martin, RA

.

  • RRI-CONST.
  • Section_ Chief (RPB/C)
  • R&SPB
  • MIS System
  • RIV File'
  • D.1 Weiss, RM/ALFJ
  • RSTS Operator

R. Pirfo,-ELD

'

  • R. G. Taylor, RPB/C'

- *RSB

  • Project Inspector
  • R.' Hall
  • w/766

i

.

'b-e

r

-

e

+-

y-

v

w

w-

rd

W

T*-15-

  • 7-'1m't