M.
IIAY 151987
.
4
1
'In Reply Refer To:
Dockets:
50-498/87-03
50-499/87-03
~
Houston Lighting & Power Company
ATTN:
J. H. Goldberg
Group Vice President, Nuclear
.
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. D. R. Carpenter, T. Reis,
.H. F. Bundy, J. E. Cummins, and D. L. Kelley of this office during the period
January 3 through March 8, 1987, of activities authorized by NRC Construction
Permit CPPR-128 and 129 for South Texas Project, Units 1 and 2, and to the'
discussion of our findings with Mr. W. H. Kinsey and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection included new fuel receipt, IE Bulletins
and Circulars, review of Unit 1 proof and review draft of Technical
Specifications, preoperational test witnessing, training review
general'
employee training.(GET), preoperational test procedure review, and site tours.
Within these areas,- the inspection consisted of selective examination of.
procedures and representative records, interviews with personnel, and
observations by the NRC inspector. The inspection-findings are documented in
the enclosed inspection report.'
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with provisions of Section 2.201 of
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
C: PBb
C:RPB
d[o .
/
R
RI
C
RPB/
RPB
elley p andell
Cqrpenter/lr
TReis
HFBun
G
stable JEGagli
f/$ /87
f/V/87
f/4/87 5/7/87
flW/87
/ /87
$/)S/
'
'
\\
0
yt
,
8705220368 870515
7
g
'
<
ADOCK 05000498
i
O
ry
-
c
...
-
1
Houston Lighting & Power. Company
- - 2_ -
'
,
.
.
.
Should you have any questions concerning this inspection, we_will be pleased to
i
_ discuss them with you.
^
Sincerely,
Ekh$ud Signed By
J. E. Gagilardo '
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
,
50-498/87-03
50-499/87-03
cc w/ enclosures:
Houston Lighting & Power Company
ATTN: M..Wisenberg, Manager,
Nuclear Licensing
P. 0. Box 1700
Houston, Texas 77001
~
!
Texas Radiation Control Program Director
1
bec to DMB (IE01)
bec distrib~. by,RIV:
- RPB
DRSP
_
,
- RRI-0PS
R.'D. Martin, RA
.
- RRI-CONST.
- Section_ Chief (RPB/C)
- R&SPB
- MIS System
- RIV File'
- D.1 Weiss, RM/ALFJ
- RSTS Operator
R. Pirfo,-ELD
'
- R. G. Taylor, RPB/C'
- *RSB
- Project Inspector
- R.' Hall
- w/766
i
.
'b-e
r
-
e
+-
y-
v
w
w-
rd
W
T*-15-
- 7-'1m't