INSTRUMENTATION 3/4.3.7 TURBINE OVERSPEED PROTECTION SYSTEM LIMITING CONDITION FOR OPERATION 3.3.7 At least one turbine overspeed protection system shall be OPERABLE.

APPLICABILITY:

CONDITIONS I and 2.

ACTION:

With the above required turbine overspeed protection system inoperable, isolate the turbine from the steam supply within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.3.7.1 The provisions of Specification 4.0.4 are not applicable.

4.3.7.2 The above required turbine overspeed protection system shall be demonstrated OPERABLE:

a.

At least once per 7 days by:

1.

Cycling each of the following valves for a) and/or b) below through at least one complete cycle of full travel; a)

For the normal overspeed protection system; 1.

Four high pressure turbine control valves, and 2.

Four low pressure turbine intercept valves.

b)

For the emergency overspeed protection system; 1.

Four high pressure turbine main stop valves, and 2.

Four high pressure turbine reheat stop valves.

Q52 ggN f5 6