ML20214A500

From kanterella
Jump to navigation Jump to search
Requests Review & Comment on Encl EGG-NTA-7368, Conformance to Reg Guide 1.97,Zion Nuclear Station,Units 1 & 2. Justifications for util-identified Exceptions to Reg Guide 1.97 Acceptable,W/Exception of 22 Items Shown in Rept
ML20214A500
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/15/1987
From: Muller D
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20214A502 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8705190478
Download: ML20214A500 (2)


Text

May 15, 1987 s

Dockets Nos. 50-295/304 DISTRIBUTION T DocketJ11as NRC PDR Local PDR PDIII-2Rdcf File GHolahan 0GC-Bethesda Mr. Dennis L. Farrar .EJordan JPartlow CVogan Director of Nuclear Licensing JNorris ACRS (10)

Commonwealth Edison Company PDIII-2 Plant File Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

ZION NUCLEAR POWER STATION, UNITS 1 AND 2 -- EMERGENCY RESPONSE CAPABILITY -- CONFORMANCE TO R.G. 1.97, REV. 2 By letter. dated August 1,1986, the Commonwealth Edison Company (CECO) provided detailed descriptions of conformance with Regulatory Guide 1.97, Rev.

2. The staff, with technical assistance of Idaho National Engineering Laboratory, reviewed the information and concluded that CECO has provided an.

explicit commitment on conformance to R.G.1.97, with the exception of those items which CECO identified. The staff further concluded that the justification for exceptions to R.G.1.97 provided by CECO are acceptable, with exception of 22 items shown in the enclosed interim Technical Evaluation Report (TER).

We request that you review the interim TER and respond to the open items within 60 days. You should also comment whether the TER includes any incorrect assumptions or reflects a commitment which Ceco believes is beyond the intent of previous response.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, CMB clearance-is not required under PL 95-511.

Sincerely, 1

Original signed by/

Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

Technical Evaluation Report cc w/encicsure:

See next page '

PDI-1:LA DI :PM P pyA' D CVoganof 5/6/87 DNo((r r

s '

fler S/gg/7 3 /87

~

8705190478 870515 5 DR ADOCK 0500 1

i

Mr. D. L. Farrar Commonwealth Edison Company Zion Station cc:

Robert J. Vollen, Esquire Mr. Michael C. Parker, Chief 109 North Dearborn Street Division of Engineering Chicago, Illinois 60602 Illinois Department of Nuclear Safety Dr. Cecil Lue-Hing 1035 Outer Park Drive, 5th Floor Director of Research anc Development Springfield, Illinois 62704 Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Mr. P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza -

olst Floor Chicago, Illinois 60602 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 52704

~

U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.

Zion. Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137