t BRAIDWOOD NUCLEAR POWER STATION UNIT 1 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-456 LICENSE NO. NPF-59 k
1 l
8705190033 870430 g-PDR ADOCK 05000456 i
g R
PDRu
\\
' t '( \\.
J (4957z/90z)
~
- -. ~
-I.
Monthly Report for Braidwood Unit 1 A.'
- Summary of_ Operating Experience The unit entered the month of April-in. Mode 3..On April 3
17, a normal plant cooldown.to' Mode 4 was initiated due to a leaking Condensate (CD) discharge header.
Investigation-revealed that the leak was due to one of'the two cracks in the 30" CD line. The unit entered Mode 4 in' order to isolate and repair the CD line. :On April 25, the unit' re-entered Mode 3 and, remained there throughout the remainder of the month, i.
t i.
l 1
I t
i i
9 I
i i
l 5
(4957z/90s)
~
,,aw,
~
4,,
,-.ys.,
7.,
p, 4
=
B.
OPERATING DATA REPORT DOCKET NO.:
50-456-UNIT: Braidwood 1
'DATE: 05/08/87 COMPILED BY:
-B. M. Peacock TELEPHONE:
(815)458-2801 ext. 2480 OPERATING STATUS 1.
Reporting Period: April, 1987 Gross Hours: N/A 2.
-Currently Authorized Power Level (MWt):
0 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
0 Max Dependable Capacity (MWe-net):
0 3.
Power level to which restricted (If Any):
0 (MWe-net) 4.
Reasons for restriction (If Any):
Low power testing license has not been received yet.
THIS MONTH YR TO DATE CUMULATIVE 5.
Report period Hours:
N/A 6.
Hours Reactor Critical:
N/A 7.
RX Reserve Shutdown Hours:
N/A 3
8.
Hours Generator on Line:
N/A 9.
Unit Reserve Shutdown Hours:
N/A 10.
Gross Thermal Energy (MWH):
N/A 11.
Gross Elec. Energy (MWH):
N/A 12.
Net Elec. Energy (MWH):
N/A 13.
Reactor Service Factor:
N/A 14.
Reactor Availability Factor:
N/A 15.
Unit Service Factor:
N/A 16.
Unit Availability Factor:
N/A 17.
Unit Capacity Factor (MDC net):
N/A 18.
Unit Capacity Factor (DER net):
N/A 19.
Unit Forced Outage Rate:
N/A 20.
Unit Forced Outage Hours:
N/A 4
21.
Shutdowns Scheduled Over Next 6 Months:
22.
If Shutdown at End of Report Period, Estimated Date of Startup:
23.
Units in Test Status (Prior to i
Commercial Operation):
i FORECAST ACHIEVED' Initial Criticality 05/23/87 Initial Electricity 07/01/87 Commercial Operation 09/16/87 (4957z/90z)
{
C.
AVERAGE DAILY UNIT NET POWER LEVEL ~ LOG DOCKET NO.:
50-456 UNIT: 'Braidwood 1 DATE:
05/08/87 COMPILED BY:
B. M. Peacock TELEPHONE:
(815)458-2801 ext. 2480 MONTH: April, 1987 1.
N/A 17.
N/A 2.
N/A 18.
N/A 3.
N/A 19.
N/A 4.
N/A 20.
N/A 5.
N/A 21.~
N/A 6.
N/A 22.
N/A 7.
N/A 23.
N/A 8.
N/A 24.
N/A 9.
N/A 25.
N/A 10.
N/A 26.
N/A 11.
N/A 27.
N/A 12.
N/A 28.
N/A 13.
N/A 29.
N/A -
14.
N/A 30.
N/A 15.
N/A 16.
N/A INSTRUCTIONS On this form list the' average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for-the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line).. In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(4957z/90=)
D.
UNIT SHUTDOWNS / REDUCTIONS DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 05/08/87 COMPILED BY: B. M. Peacock TELEPHONE: (815)458-2801 ext. 2480 REPORT PERIOD: April, 1987 No DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE N/A PRECRITICAL PERIOD e****************
SUMMARY
e************.+***
TYPE REASON METHOD SYSTEM & COMPONENT F-Forced A-Equipment Failure Maint or Test 1 - Method _
Exhibit F & H S-Scheduled C-Refueling 2 - Manual Scram Instructions for Preparation of-D-Regulatory Restriction 3 - Auto Scram Data Entry Sheet E-Operator Training & License Examination 4 - Continued Licensee Event Report F-Administration 5 - Reduced Load (LER) File (NUREG-0161)
G-Oper. Error 9 - Other H-Other
. ~. -.._...
i E.
UNIQUE REPORTING REQUIREMENTS
{
1.
Safety / Relief valve operations.
VALVES NO & TYPE PLANT DESCRIPTION' DATE-ACTUATED ACTUATION CONDITION OF EVENT
,i None
?
l r
J
'2.
Licensee generated changes to ODCM.
I None i
I t
t 4
P 4
.,.,,u.-
F.
LICENSEE EVENT REPORTS The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, April 1 through April. 30, 1987.
This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensee Event Report Report Number Date Title of Occurrence 87-020-00 04/10/87 Power supply cooling fan failure results in loss of control room fire protection zone annunciators.
87-017-00 04/10/87 Failure to dual verify liquid radioactive release valve lineup.
87-018-00 04/13/87 Train B containment isolation signal due to an undervoltage condition sensed by the containment incident fuel monitor.
87-019-00 04/13/87 Shiftly daily surveillance to check pressurizer pressure channels missed due to procedural error.
87-021-00 04/28/87 Reactor trip due to maintenance activity on an energized solid state protection channel.
87-022-00 04/28/87 Reactor trip due to personnel error as a result of failure to follow procedure.
86-001-01 04/28/87 Violated fire watches due to personnel errors.
-(4957z/90z)
[h. Commonwealth Edison -
) Ortidwood Nuctwr Powtr StIti:n i
c Route 01, Box B4 Braceville, Illinois 60407
' Telephone 815/4SO2801 EEF/87-741 File: AGNC-14 May 8, 1987 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C.
20555 l
~
ATTN: Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station for the period April 1 through April 30, 1987.
Very truly yours, E. E. Fit atrick Station Manager Braidwood Nuclear Power Station l
EEF/RCB/ jab (4957z)
Attachmenta cc:
B. A. Davis, NRC, Region III NRC Resident Inspector Braidwood Gary Wright, Ill. Dept. of Nuclear Safety D. P. Galle T. J. Mainen D. L. Farrar Nuclear Fuel Services, PWR Plant Support L. Anastasia, Station Nuclear Engineering INPO Records Center Performance Monitoring Group, Tech Staff Braidwood Station Nuclear Group, Tech Staff Braidwood Station J. Stevens - USNRC P. L. Barnes -
//