Forwards Insp Rept 50-285/87-05 on 870406-10.Enforcement Conference Scheduled for 870514
ML20213G407
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/08/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20213G411 List:
References
EA-87-072, EA-87-72, NUDOCS 8705180273
Download: ML20213G407 (2)


See also: IR 05000285/1987005

Text

_ - _

.

~

'

e g. } 4 -, -.

_

. , NAY '8 1987

~

,  ::In Reply Refer To:

Docket: 50-285/87-05

' EA: 87-72.

~

,

^

Omaha Public Power District

, ATTN: R.: L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

20maha, Nebraska' 68102

.

Gentlemen:

,'

This refers to the inspection = conducted by Mr.-J. R. Boardman of this office

and one NRC consultant during the period April 6-10, 1987, of activities

.

'~

authorized by NRC Operating License DPR-40 for the Fort Calhoun 5tation, and to

the ' discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

~ Areas examined _during the inspection included the licensee maintenance program,

maintenance program implementation, electrical maintenance, and maintenance of

instrument and control systems. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the NRC inspector. The in;pection findings

are documented in the enclosed inspection report.

During this inspection, it was fcund that certain of your activities appeared

to be in violation of NRC requirements. As discussed in our telephone

conversation of May 8,1987, we have scheduled an enforcement conference in our

office at 8:30 a.m. on May 14, 1987, to discuss your understanding of these

" potential violations including generic implications for previously accomplished

work at Fort Calhoun Station,~and to discuss the unresolved items in report

Sections 3.b.3 and 3.e.6, the reasons for the occurrence, and your corrective

actions.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,-

Orig'n31 s!gned B5

J. E. Gag!!ardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-285/87-05

-

. - - - - . - - - -

cc: (see next page)

RIV-R2 S p 03 / ES RPB RSB E0 d

/cg D u land DRHunter Fy rman DPowers

J sf%

/87

.

,

icuttfR

/87 / /87 (/)/87 J/ /87 5 /g /87

RPB

JEGa

f

g[gliardo/87 870518027387050h85

gDR ADOCK 05000

PDR

P

.. ,

Omaha Public Power District -2-

cc w/ enclosure:

W. G. Gates, Manager

Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D. C. 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB *RRI R. D. Martin, RA
  • R&SPB *Section Chief (RPB/B) * MIS System
  • RIV File DRSP *RSTS Operator
  • RSB * Project Inspector *D. Weiss, RM/ALF
  • R. Hall *J. Boardman *SectionChief(RSB/ES)
  • Section Chief (RSB/0S)
  • w/766