Text
.
DISTRIBUTION:
LB#2 Reading RAuluck
/o[J["I'l.
ASchwencer TMNovak MEMORANDUti FOR:
DistributionList(Attached)
FROM:
R. Auluck, Project Manager Licensing Branch No. 2 Division of Licensing
SUBJECT:
AGENDA - WNP-2 ACRS MEETING Attached is a copy of the agenda for the ACRS Full Committee meetinq on UNP-2 to be held on Thursday, October 7,1982 at 8:45 AM.
A shuttle bus has been arranged to transport staff members to the meeting. The bus will depart the Phillips Building at 7:50 AM.
'/
'/
R. Aulick,' Project ifanager Licensing Branch Po. 2 Division of Licensing Attachments:
As stated
- ~.
x 8211020179 821005 k-C ADOCK. 050003?7'
~
C
- Q omer >
t.
N sunser > E.......R : k W t
....../. 5... /.. 8 2.......
10 un>
pac renu m no-aci nneu em OFFICIAL R ECOR D COEsY
.: ~ c om,.c
4 e
cc w/attachm:nt:
D. Eisenhut/R. Purple, DL W. Johnston, DE R. Engelken, Region V L. Rubenstein, DSI M. Srinivasan, PSB T. Speis, DSI O. Parr, ASB J. Knight, DE F. Rosa, ICSB W. Houston, DSI B. Sheron, RSB B. Grines, I&E R. Houston, AEB J. Kramer, DHFS F. Congel, RAB W. Butler, CSB C. Berlinger, CPB f
R. Bosnak, MEB L
F. Schauer, SEB W. Hazelton, MTEB V. Benaroya, CMEB Z. Rosztoczy, EQB W. Haass, QAB D. Vassallo, LQB V. Moore, HFEB D. Ziemann, PTRB F. Pagano, EPLB D. Skovholt, LGB G. McCorkle, SGPL D. Beckhams, OLB W. Regan, SAE
~
D. Sternberg, Region V R. Dodds, Region V Staff Reviewers Recuested to Attend Meetino or Be Represented by Supervisors S. Rhow, PSB R. Giardina, PSB J. Ridgely, ASB J. Rosenthal, ICSB
- c.,
T. Collins, RSB F. Eltawila, CSB M. Tokar, CPB W. Brooks, CPB R. Li, MEB K. C. Leu, SEB I. Al terman, GSB J. Kimball / GSB M. Hum, MTEB D. Kubicki, CEB T. Y. Chang, EQB B. Bottimore, DL M. Gaitanis, EQB e
( ~ l'-
Tsu 2.
AGENDA Review of WNP-2 Operating License October 7,1982 8:45 am - 12:45 pm 3
Speaker Time
- I.
Subcommittee Report M. Plesset 8:45 am NRC Presentation A.
Status of the Review R. Auluck 9:00 am B.
Summary of Principle Review Issues R. Auluck 9:05 am b.5+m %,
a--L ^
9:15 am C.
I&E Region V Report III.
Applicant Presentation A.
Introduction R. L. Ferguson 9:35 am B.
Corporate Organization / Power Generation W. C. Bibb 9:55 am C.
Construction Management Organization /0A R. G. Matlock 10:10 am
- Break ***
10:30 am D.
Plant Layout / Operations / Training /
J. D. Martin 10:45 am Personnel
- Training and Personnel
- Emergency Procedures
- Control Room Habitability / Human Factors
- Emergency Planning
- Fire Protection
- Containment Systems E.
Electrical Power Systems / Selected C. M. Powers 11:30 am Mechanical Systems
- Reliability of AC and DC Power
- Remote Shutdown 4
1 F.
Equipment Qualification D. L. Renberger 11:50 am G.
Geology / Seismology D. L. Renberger 11:55 am H.
Security (Closed Session)
J. W. Klingehoefer 12:15 pm i
IV.
Committee Discussion 12:30 pm i
- Lunch ***
12:45 pm i
- Presentations should allow one third to one half of the allotted time for questions.
_,.._-_-,,y,
DCI
' <c8?
g DISTRIBUTION:
See next page f4E!!0RANDU!! FOR:
A. Schwencer, Chief Licensing Branch No. 2 DL FR0f t:
R. Auluck, Project Manager Licensing Branch No. 2, DL SU3 JECT:
liEETING SUtit4ARY, WNP-2 ELECTRICAL CABLE SEPARATION In response to a memorandum from R. H. Engelken, Regional Administrator, Region V to H. R. Denton, Director, NRR, a meeting to discuss the UflP-2 cable separation criteria was held in Walnut Creek, Region V on September 13 & 14, 1982. NRR participants were T. Novak, !!. Srinivasan, S. Rhow and R. Auluck. Highlights cf the meeting are briefly described below.
John Elin, Project Inspector, started with his presentation on the status of the inspection activities concerning cable separation at WNP-2 site.
Examples of the deviations from the criteria accepted by WPPSS and flRC staff in 1981 (UPPSS letter #G02-81-146, G. D. Bouchey to R. L. Tedesco, dated June 18, 1981) were shown and discussed.
John indicated that the FSAR-writeup is too complex and the requirements for a,given situation are difficult to determine. The color coding scheme is very confusing and is not consistant throughout the plant.
John also stressed that the verification that field installation complies with separation criteria very difficult.
!!. Srinivasan, Chief, Power Systems Branch, explained briefly the general review philosophy of licensing plants of WNP-2 vintage, who do not meet the
.R. G. 1-75 requirements. Non-class IE cables are allowed to share raceways and trays with class IE cables as long as they stay in the same division (f.e. same non-class IE circuit does not share raceways with Div.1 & Div. 2).
He further noted that the WilP-2 situation is probably similar to the situation at the Seabrook project.
S. Rhow, Power Systems Branch, briefly described four category of cir.cuits used at the Ut!P-2 site.
The following action plan was agreed upon at the end of the meeting:
WPPSS will submit the revised section 0.3 of the FSAR to NRC staff by Sept (nter 22, 1982.
The staff will review and revise SER section 8.4.1, which will be included in a later SSER.
cmee >
-m, mos
- m ^ = c x n o xg g.
anc renu ais tio sci ucu c24o FFICIAL RECORD COPY m mi-mm
~%,,...-
M: sting Summary John Elin will come to Bethesda and will be a party to writing a revised acceptance criteria for WNP-2.
Site visit and discussions with the applicant will be held in October 1982.
Independent design verification on cable separation will be discussed in the management QA meeting to be held in October 1982.
A copy of the handouts provided at the meeting is in the project files.
R. Auluck, Project ifanager Licensing Branch No. 2, DL cc: See next page i
i l
l OL:LB#2
.............../ PM OL:LBe2 BC
.........., u), 3......
omc >
.RAul..uc k : pt ASchwencer suamee >
- 1. 0.. /....'./.8. 2........
- 1. 0../..c..../. 8 2........
o,ra >
m ronv au n aci r.=c. ::i2 OFFICIAL RECORD COPY a re e - m.a
.) -
WNP-2 Mr. R. L. Ferguson Managing Director
~
Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washin9 ton 99352 cc:
Nicholas Reynolds, Esquire Debevoise & Liberman 1200 Seventeenth Street, N. W.
Washington, D. C.
20036 Mr. G.E. Doupe, Esquire Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 Roger Nelson, Licensing Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Mr. W.G. Conn, Sr. N/M Group Supervi sar Burns and Roe, Incorporated 601 Williams Boulevard Richland, Washington 99352 Mr. Richard Feil i
U.S. NRC Resident Inspector WPPSS-2 NPS P.O. Box 69 Richland, Washington 99352 4
Dr. G.O. Bouchey l
Deputy Director, Safety & Security Washington Public Power Supply System P.O. Box 968, MD 650 Richland, Washington 99352 e
l
v HEETING
SUMMARY
DISTRIBUTION:
DATE:
Local PDR PRC NSIC LBf2 Reading File NRC PARTICIPANTS:
{ Noja ec Manager R. Auluck E. Case D. Eisenhut/R. Purple g'
{[ck T. Novak J. Youngblood A. Schwencer J. Kerrigan E. Adensam C. Thomas F, Mira, glia W. Russell D. Crutchfield T. Ippolito J. P. Knight N'
hnston cc: See next page D
W]
T. Spets R. Houston L. Rubenstein F. Schroeder M. Ernst J. Kramer Attorney, OELD Paton E. L. Jordan, J. M. Taylor, I&E Region y
Reside ~nt Inspector 4
ACRS (16)
OSD (7) e t
4 e
CCT 191932 DISTRIBUTION:
See attached page Docket No.:
50-397 MEMORANDUM FOR:
A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:
R. Auluch, Project Manager Licensine) Branch No. 2, DL
SUBJECT:
FORTHCOMING MEETIflG WITH WASHINGTON PUBLIC P0llER SUPPLYSYSTEM(WPPSS)
DATE & TIftE:
Wednesday, flovember 10, 1982 9:00 AM LOCATION:
P-110 Phillips Building Bethesda, MD PURPOSE:
Special QA meeting with WPPSS management to assess and discuss the adequacy of its quality assurance program in light of the recent deficiencies disclosed at several plants.
PARTICIPANTS:
fiRC WPPSS D. G. Eisenhut G. D. Bouchey R. C. DeYoung R. G. Matlock R. Engelken R. B. Glasscock R. H. Vollmer R. f!elson T. M. flovak A. Schwencer R. Auluck Original af gned byi R. Auluck, Project Manager Licensing Branch No. 2 Division of Licensing cc: See next page P i^'7 ^^7 M 1019
/
PDR ADOCK 05000397
/8 A ~/ I 3
A PDR m/,
M.....
...C.... Db: A D/.L'..'......
.DL.:.DI R
..D..h... LB J#....M.
L:
..D..L...:.L..E eanea>
.......... ~...
..... ~..... -..
R ASchw nc,e,r,
,TJ,4,o,v a,k,,,,,,,,,,,,
D E,f,s,e n,h,u,t,,,,
su:.m >
..I.0/17/,82,,,,
,,) 0,/,1 /,@,2,,,,,,},9,([,j,(,8,2,,,,,,,,,] Q,(,l,,,f,8,2,, _
oan >
Lac rer u m eio m saeu em OFFICIAL RECORD COPY vom.mi-e.m
... ac. ;._ w_x _..,. =. La_.a: +a:.z
..az.
.~,a.
~. a u. aw.u.;,. w. u a.a.m.
WNP-2 Mr. R. L. Fer9uson Managing Director Washington Public Power Supply System P. O. Box 968 3000 George Washington Way Richland, Washington 99352 cc:
Nicholas Reynolds, Esquire Debevoise & Liberman 1200 Seventeenth Street, 4. W.
Washington, 0. C.
20036 Mr. G.E. Doupe, Esquire Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 Nicholas Lewi s, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 Roger Nelson, Licensing Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352 Mr. W.G. Conn, Sr. N/M Group Supervi sor Burns and Roe, Incorporated 601 Williams Boulevard Richland, Washington 99352 Mr. Richard Feil U.S. NRC Resident Inspector WPPSS-2 NPS P.O. Box 69 Richland, Washington 99352 Dr. G.D. Bouchey Deputy Director, Safety & Security Washington Public Power Supply System P.O. Box 968, MD 650 Richland, Washington 99352 S