Notifies of Review Completion of Facility Responses to TMI Action Plan Items II.B.1,II.K.1.5,22,23,II.K.3.3,13,15,16,17 18,21,25,30,31,44 & 45.Items II.B.1,II.K.1.22,II.K.3.17,18, 21 & 25 Have Not Been Satisfied.Sample Response Encl
ML20213D804
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/17/1981
From: Hodges M
Office of Nuclear Reactor Regulation
To: Rajender Auluck
Office of Nuclear Reactor Regulation
References
CON-WNP-0386, CON-WNP-386 NUDOCS 8109300222
Download: ML20213D804 (2)


Text

I NU f

f p/j som MEM0 AktfM FpR:<Ra'[ ender Auluck, Project Manager, Licensing Branch #2 J 7- *kDivision of Licensing FROM:

M. W. Hodges, Section Leader, Section B, Reactor Systems Branch Division of Systems Integration

SUBJECT:

REVIEW 0F WNP-2 TMI ITEMS The WNP-2 responses to TMI-2 Action Plan items for which Reactor Systems Branch is responsible have been reviewed by us.

The items included are: II.B.1, II.K.1.5, 10, 22, 23 II.K.3.3, 13, 15, 16, 17, 18, 21, 25, 30, 31, 44, 45.

Please note that ICSB input may also be required on items II.K.3.18 and II.K.3.21.

The following items have not been satisfied:

II.B.I. Reactor Coolant System Vents - The applicant stated that this requirement is not applicable to WNP-2.

This is not acceptable. All requirements of this item must be met. Attached is the LaSalle response which we found to be acceptable.

II.K.1.22 Proper Functioning of Heat Removal Systems - The response provided in Amendment 17 is too general. Attached is the Grand Gulf response which we found to be acceptable.

II.K.3.17 Reporting of ECCS Outage Data - We require a commitment from the appli-cant to provide comulative ECCS outage data during the first five years of opera-tion. This infonnation may be included in the plant annual report.

II.K.3.18 Modification to ADS Logic - If no modification to the ADS logic is to be made, the applicant must provide analyses of containment heatup rates which demon-strate that a high drywell pressure signal will be present at a time early enough to preclude exceeding the criteria of 10CFR50.46 for a stuck open relief valve event or an outside steamline break. Othemise the applicant must commit to modify the current logic to either bypass the high drywell signal pennissive or add a timer which initiates on Level I water level and bypasses the high drywell pennissive on timing out.

If the timer option is selected, an analyses supporting the timer setting must be provided.

II.K.3.21 Restart of Core Spray and LPCI Systems - We require that provisions be made for automatic restart of HPCS on low water level after HPCS has been manually tenninated.

I__I.K.3.25 Effect of Loss of AC Power on Pump Seals - The Owners Group response to this item is unacceptable. We require that seal cooling be provided from an emergency power source automatically following a loss of offsite power. Addition-ally, the cooling system must be classified as " essential" so that it is not auto-matically isolated on an ECCS initiation signal which would be expected shortly after a loss of offsite power. Alternatively, the applicant may pmvfde test data

/-

m, pqt omh h..

..),

0109300222 81091'7'

,, k,.......

sun o c) %._ C ADOCK 05000397' W

omo I

1

nne ronu ais on aoi rmcu om OFFICIAL RECORD COPY usano i.ei-u m

l SEP I 7 1981 Raj:nder Auluck demonstrating that the pump sealswill maintain their integrity for two hours without cooling when the reactor is in a hot standby condition.

Marvin W. Hodges, Section Leader Section B, Reactor Systems Branch Division of Systems Integration cc:

T. P. Spets H. Faulkner RSB Section Leaders Section B Members B. J. Youngblood R. Tedesco CONTACT: Tim Collins X27588 DISTRIBUTION Central Files RSB R/F TCollins R/F RSB Subject File GMazetis BSheron MWHodges WMorris TCollins

.r/M

.D.S.I.:B.S @.DS((,f,kB,,,

i ornce>

TCollins:gd MWHodges

=~ ze >

9/nl.01..

9/d!.91 o.u,

$ anc rono aie tio-sos ancu 024o OFFIClAL RECORD COPY us = ini-m a 1