ML20213C836

From kanterella
Jump to navigation Jump to search
Forwards App to SALP Rept 50-263/86-01 Summarizing 860820 Meeting.No Changes to SALP Board Rept Required,Based on Exchange of Info & Absence of Verbal Identification of Discrepancies within Rept or Formal Comments
ML20213C836
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/03/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
Shared Package
ML20213C837 List:
References
NUDOCS 8611100317
Download: ML20213C836 (2)


See also: IR 05000263/1986001

Text

.,

,. Oh

NOV 08 1986.

Docket No. 50-263

Northern States Power Company

. ATTN: Mr. C. E. Larson

Vice President, Nuclear

Generation

414 Nicollet Mall

Minneapolis, MN 55401

Gentlemen:

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)

6 Board Report for the Monticello plant, and our meeting of August 20, 1986,

which discussed in detail the contents of the report.

Based on the formal exchange of information between our respective staffs,

and'in the absence of verbal identification of discrepancies within the

. report'or formal written comments from you requiring resolution, no changes

to the SALP Board Report are necessary.

Enclosed, as an Appendix to the SALP Board Report, is a summary of our meeting

which includes names of those persons in_ attendance. Issuance of the Appendix

serves as' the final step in our SALP assessment process.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter with the

referenced attachments will be placed in the NRC's Public Document Room.

No reply to this letter is required; however, should you have questions on

the conclusions reached by NRC, or on the Appendix to the SALP Report, please

.let us know and we will be pleased to discuss them with you.

Sincerely,

or!:;; cal rMed LV

. . y .m ; Q b;/ or

'

i

James G. Keppler

Regional Administrator

Enclnsure: Appendix to SALP 6

Board Report No. 50-263/86001

See Attached Distribution lijj@ y $$$o 3

RI

Ye5

RIII RI RIII RI RIII RIII RIII

N I I

'

LIn s.an/jp ac iw G f us llo Ke er

- 4mond .. - Pagpr ., #is - -

.

___

,

F-

'

,

, .

. .

,

Northern. States. Power Company

-

2 NOV 0 s fMS

Distribution.

cc w/ enclosure:

'

W. A. . Sha' mla,- Plant Manager

DCS/RSB(RIDS)

Licensing. Fee Management-Branch ~

Resident. Inspector, RIII Monticello '

Resident-Inspector, RIII Prairie

Island

John W. Ferman, Ph.D. . .

Nuclear Engineer, MPCA

J. M.. Taylor, Director, IE

H. R. Denton,. Director, NRR

Regional Administrators

RI, RII, RIV, RV

- L. W. Zech', Chairman

J. K. Asselstine, Commissioner.

F. M. Bernthal, Commissioner

-T.~M. Roberts,' Commissioner

' K. M. Carr, Commissioner

J. A. Zwolinski, BWR Project

Directorate No. 1

D. Lynch, NRR Project Manager

.

J. Axelrad, IE

. M.-Johnson, IE SALP Coordinator  :

- RIII PRR-

RIII SGA

INP0

.