BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 8704270285 870331 PDR ADOCK 05000454 R
PDR 4
V i
(0625M/0062M) (2)
\\
j l
f
1 v
I.
Monthly Report for Byron Unit 1 A.
Summary of Operating Experience for Unit 1 The Unit began this reporting period in Mode 5 (Cold shutdown). On 2/3/87 the Unit entered Mode 6 (Refueling). The refueling outage continued through the end of this reporting period.
(0625M/0062M) (3)
B.
OPERATING DATA REPORT DOCKET NO.:
050-454 UNIT: Byron One DATE: 04/10/87 COMPILED BY:
D. J. Spitzer TELEPHONE:
(815)234-5441 x2023 OPERATING STATUS 1.
Reporting Period: March 1987. Gross Hours: 744 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED 3.
Power Level to Which Restricted (If Any):
4.
Reasons for Restriction (If Any):
THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
744 2160 14233 6.
Rx critical Hours 0
1057.8 10771.2 7.
Rx Reserve Shutdown Hours 0
0 37.8 8.
Hours Generator on Line 0
1056.8 10010.5 9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (MWH) 0 2210980 28756814
- 11. Gross Elec. Energy (MWH) 0 722844 9647076
- 12. Net Elec. Energy (MWH) 0 658251 9067152
- 13. Reactor Service Factor 0
49.0 75.7
- 14. Reactor Availability Factor 0
49.0 75.9
- 15. Unit Service Factor 0
48.9 70.3
- 16. Unit Availability Factor 0
48.9 70.3
- 17. Unit Capacity Factor (MDC net)
N/A N/A N/A
- 18. Unit capacity Factor (DER net) 0 27.2 56.9
- 19. Unit Forced Outage Hrs.
0 0
777
- 20. Unit Forced Outage Rate 0
0 7.2
- 21. Shutdowns Scheduled Over Next 6 Months:
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: 4/29/87
- 23. Units in Test Status (Prior to Commercial Operation): See Unit 2 (II.B.23)
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
\\
f, ' '
(0625M/0062M) (4)
C.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One DATE: 04/10/87 COMPILED BY:
D. J. Spitzer TELEPHONE:
(815)234-5441 x2023 MONTH: March, 1987 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.
O MW 15.
O MW 2.
O MW 16.
O MW 3.
O MW 17.
O MW 4.
O MW 18.
O MW i
5.
O MW 19.
O MW 6.
O MW 20.
O MW 7.
O MW 21.
O MW 8.
O MW 22.
O MW 9.
O MW 23.
O MW 10.
O MW 24.
O MW 11.
O MW 25.
O MW 12.
O MW 26.
O MW 13.
O MW 27.
O MW 14.
O MW 28.
O MW 29.
O MW 30.
O MW 31.
O MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)
In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M) (5)
occocceseecescoooooooooooo Ceport Period March, 1987 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 1)
No.
Date Type Hours Reason Method LER Nuunber System Component Cause & Corrective Action to Prevent Recurrence 1
02/14/87 S
744 C
4 Scheduled Refueling Outage.
(Carried over from 2/14/87)
...o.........**
Susamary oceooneeeee****
TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NURBG-0161)
(0625M/0062M) (6)
-- -----------------------s
E.
UNIQUE REPORTING REOfjIREMENTS (UNIT 1) 1.
Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None 2.
Licensee generated changes to ODCM.
(Y/N)
No 3.
Indications of failed fuel.
(Y/N)
No.
(Fuel reconstituted and core reloaded)
(0625M/0062M) (2)
F.
LICENSEE EVENT REPORTS (UNIT 1)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, March 1 through March 31, 1987. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Licensee Event Report Number Date Title of Occurrence 87-005-00 3-10-87 Failure to properly apply LCOAR on Continuous Fire Watch.
87-006-00 3/11/87 Fire Protection Surveillance Internal missed due to personnel error.
87-007-00 3/16/87 Fire Watch delayed by 20 min.
due to personnel error.
87-008-00 3/24/87 Control Room Ventilation Auto Start.
)
J 1
I i
1 1
1 i
i i
l I
{
(0625M/0062M) (g) i
?
. I
II. Monthly Report fer Byron Unit 2 A. -
Summary of operating Experience for Unit 2 During this reporting period, Byron Station's Unit 2 continued in the Startup Testing Program, and achieved significant objectives toward commercial operations.
l The Unit 2 testing activities were highlighted by the completion of the 50% and 75% Testing Sequence Documents.
The Unit began this reporting period in Mode 1 (Power operation) at 25% power. Power was ramped to 51% on 3/4/87. A load reduction to 35% for a startup test occurred on 3/7/87.
On 3/14/87, the 50% power testing sequence was completed.
Power was increased to 75% on 3/15/87. On 3/21/87 power was decreased to 18% for reactor coolant system leak determination. The leaking valve was repaired on 3/22/87. Power was increased to 75% by 3/24/87.
t The 75% power testing sequence was completed on 3/25/87.
On 3/28/87, power was increased to 89% (1050 mee), on 3/30/87 the Unit was ramped down to 580 Mwe in preparation for an 8 day modification outage. A reactor trip, from 17% power, occurred due to turbine generator motoring on 3/31/87. At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, on 3/31/87, I
the Unit entered Mode 4 (Hot Shutdown) and remained there for the rest of the reporting period.
i i
(0625M/0062M) (2)
F
B.
OPERATING DATA REPORT DOCKET NO.: 050-455 UNIT: Byron Two DATE: 04/10/87 COMPILED BY:
D. J. Spitzer TELEPHONE:
(815)234-5441 i
x2023 OPERATING STATUS 1.
Reporting Period: March 1987. Gross Hours: 744 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED 3.
Power Level to Which Restricted (If Any):
4.
Reasons for Restriction (If Any): The Unit is in startup and Power Ascension Test Phase.
THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
744 1%1.4 1%1.4 6.
Rx Critical Hours 726 1733 1733 7.
Rx Reserve Shutdown Hours 0
0 0
8.
Hours Generator on Line 726 1076.4 1076.4 9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (MWH) 1415388 1779185 1779185 l
- 11. Gross Elec. Energy (MWH) 449580 528595 528595
)
- 12. Net Elec. Energy (MWH) 417696 480300 480300
- 13. Reactor Service Factor N/A N/A N/A
- 14. Reactor Availability Factor N/A N/A N/A
- 15. Unit Service Factor N/A N/A N/A
- 16. Unit Availability Factor N/A N/A N/A
- 17. Unit Capacity Factor (MDC net)
N/A N/A N/A
- 18. Unit Capacity Factor (DER net)
N/A N/A N/A
- 19. Unit Forced Outage Hrs.
N/A N/A N/A
- 20. Unit Forced Outage Rate N/A N/A N/A d
- 21. Shutdowns Scheduled Over Next 6 Months: 3/31/87 Scheduled 8 day outage for i
modifications.
- 22. If Shutdown at End of Report period, Estimated Cate of Startup: 4/8/87
- 23. Units in Test Status (prior to Commercial Operation):
(UNIT 2)
Forecast Achieved i
Initial criticality 01/07/87 01/09/87 Initial Electricity 02/05/87 02/06/87 commercial Operation 05/31/81
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(0625M/0062M) QO) i
. _ _ ~ _ -
C, AVERAGE DAILY UNIT PONER LEVEL DOCKET NO.: 050-455 UNIT: Byron Two DATE: 04/10/87 COMPILED BY:
D. J. Spitzer l
TELEPHONE:
(815)234-5441 x2023 MONTH: March, 1987 DAY AVERAGE DAILY POWER LEVEL (We-Net) :
1.
365 MW 16.
786 MW 3.
464 MW 17.
804 MW 4.
476 MW 19.
774 MW 6.
473 MW 20.
798 MW j
7.
359 MW 21.
364 MW
{
8.
298 MW 22.
171 MW 9.
290 MW 23.
393 MW 10.
405 MW 24.
77A MW l
11.
12.
442 MW 26.
824 MW
]
13.
474 MW 27.
932 MW f
14.
477 MW 28.
950 MW j
29.
956 MW i
30.
918 MW 31.
64 MW INSTRUCTIONS l
On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the not electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or j
the restricted power level line.) In such cases the average daily unit power j
output sheet should be footnoted to explain the apparent anomaly.
I (0625M/0062M) (ll.)
l l
eeeeeeeeeeeeeecocoeocoocco Report Period March, 1987 UNIT SHUTDOWNS / REDUCTIONS BYRON e
(UNIT 2) l l
Mo.
Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 03/07/87 S B
5 Reduced power for Start-Up Testing.
l 03/21/87 F A
5 Dropped Power Due to RCS leak. (Corrected by repairing valve) 03/31/87 s 18.0 A
3 Anti-motoring (Reverse Power) during scheduled shutdown Root Cause undetermined at this time. Investigation continuing.
l l
1 o0 o...........
Summary l
coooco.........
l TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H l
S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for l
C-Refueling H-Other 3-Auto Scram Preparation of l
D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report l
& License Examination 9-Other (LER) File (NUREG-0161) l l
(0625M/0062M) (E) i l
i A
l l
E.
UNIQUE REPr* TING RODUIREMENTS (UNIT 2) l l
l 1.
Safety / Relief valve operations for Unit Two.
I VALVES NO & TYPE PLANT DESCRIPTION DAE ACTUATED ACTUATION CONDITION OF EV5NT i
l l
NONE l
2.
Licensee generated changes to ODCM.
(Y/N)
(
l M
3.
Indications of failed fuel.
(Y/N)
No l
t 6
t l
(062SM/0062M) (12)
4:
- s :g, :, s
'"""o["*e4,!!,f,{
x:< kr,o,*/
4,N4lp,*V A/ /
4 $c
/
47
- o %4,
- 4 4 * '*:,4
- {.
n%
G,,'"Ch'?,< ;}*?i p N,::sqs;+;jg<4 4,%
i l
/
/
/
/
/
/
s O
l April 10, 1987 l
l LTR:
BYRON 87-0453 File:
2.7.200 Director, office of Management Information l
and Program control l
United States Nuclear Regulatory Commission Washington, D.C.
20555 ATTN:
Document control Desk centlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Utation for the period March 1 through March 31, 1987.
l i
Very truly yours, I
l n,,,
V'VM l
/( (()
C C
H. B. Querto l
Utation Manager Byron Nuclear Power Utation HEQ/PHD/bb cc:
A.D. Davis, NRC, Hegion III NRC Resident Inspector Dyron Gary Wright, 111. Dept. of Nuclear Safety D.P. Galle T. J. Malman D.L. Farrar Nuclear Fuel Cervices, pWH plant Dupport L. Anastasia, Utation Nuclear Engineering INPO Hocords Center Thermal Group, Tech Staff Dyron Station l
j Nuclear Group, Tech Staff Byron Station l
L. Olnhan - USNRC O. J. Upitzer i
'1;\\
(0625M/0062M) (1)
P.
l.1CENURR INENT REPORTS (UNIT 2)
The following is a tabular summary of all 1.icenseo Event Reports for Dyron Nuclear Power Utation, Unit Two, submitted during the reporting period, March 1 through March 31, 1907. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR S0.73.
14cen see event Remrt Number pate Iltle of Occurrence 87-006-00 03/31/87 Heactor Trip on Generator Motoring.
l (062';M/0062H) (13) 1
e April 10, 1987 1.TH :
BYNON 87-0453 File:
2.7.200 Director, Office of Management Information and Program control United States Nuclear Regulatory Commission Washington, D.C.
20555 ATTN:
Document Control Desk centlement Enclosed for your information is the Monthly Performance Heport covering Byron Nuclear Power Station for the period March 1 through March 31, 1987.
Very truly yours, m
y?
, / h,; W d ! / Y '
C (C
H. E. Querto Otation Manager Byron Nuclear Power Utation RWJ/PilD/bb cci A.D. Davis, NRC, Hegion III NRC Honident Inspector Byron Gary Wright, 111. Dept. of Nucinar Delety D.P. Gallo T. J. Maiman D.L. Farrar Nuclear Fuel flervices, PWM Plant tiupport t.. Anastasia, Utation Nuclear Engineering INPO Hecords Center Thermal Group, Toch fitaff byron litation Nuclear Oroup, Tech fitaff Byron Stat ton L. 01ahan - UUNRC D. J. Upitzer 1
(062$M/0062M) (1)
-