MONTHYEARML20205B6111999-03-26026 March 1999 Notification of 990419 Meeting with Util in Rockville,Md to Discuss Licensing Issues at Plant,Including Racking of Cask Pit for Storage of Spent Fuel ML20153F7981998-09-23023 September 1998 Forwards NRC Operator Licensing Exam Rept 50-346/98-301OL, (Including Completed & Graded Tests) for Tests Administered on 980803-07 ML20153F8291998-09-23023 September 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered During Wk of 980803 ML20236F3581998-06-26026 June 1998 Forwards NRC Insp Mc 0350, Staff Guidelines for Restart Approval, for Oversight Activities for Davis Besse Station ML20236N8641998-06-11011 June 1998 Discusses TS Interpretation on Application of Davis Besse TS 3.6.5.1 & 3.6.5.2.TB Branch Recommends That Davis Besse Consider Converting TS to Improved Standard TS ML20216F3291998-04-13013 April 1998 Accepts 980406 Licensee Request for Approval to Install machine-welded SG Tube Plugs in Accordance W/Provisions of Paragraph IWB-4230, Tube or Tubesheet Hole Plugging by Fusion Welding, of Section XI ML20202E6241997-11-26026 November 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Quality Assurance Program at Davis-Besse ML20211Q4711997-10-16016 October 1997 Notification of 971113 Meeting W/Toledo Edison Co in Rockville,Md to Discuss Ultimate Heat Sink at Davis-Besse ML20211B5561997-09-23023 September 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970707-11 ML20211C5091997-09-23023 September 1997 Forwards NRC Operator Licensing Exam Rept 50-346/97-308OL (Including as-given Writtem Exam) for Tests Administered on 970707-10 ML20149E7411997-07-16016 July 1997 Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Instrument Drift Study ML20137U2051997-04-14014 April 1997 Informs That Davis-Besse Nuclear Power Station Nuclear Assurance Dept Will Be Reorganized Into Two Separate Dept; DB Nuclear Assurance & DB Nuclear Support Svc,Effective, 970414 ML20136F9491997-03-13013 March 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss Progress on Thermo-Lag Issue Resolution ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134P9011996-11-26026 November 1996 Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec ML20149E8161994-08-0202 August 1994 Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination ML20059H8361994-01-19019 January 1994 Notification of 940201 Meeting W/Util in Rockville,Md to Discuss Pending Davis-Besse Licensing Actions ML20057F1311993-10-0707 October 1993 Notification of 931020 Meeting W/Util in Rockville,Md to Discuss Davis-Besse Implementation of Reg Guide 1.97 for Steam Generator Pressure Instruments ML20127N6121993-01-25025 January 1993 Notification of 920205 Meeting W/Util in Rockville,Md to Discuss Emergency Action Levels Proposed Rev,Submitted 930112 ML20127C0411993-01-0808 January 1993 Notification of 930112 Meeting W/B&W Owners Group in Clearwater Beach,Fl to Discuss Generic Program Plan for License Renewal Initiative ML20127F5461993-01-0707 January 1993 Notification of 930115 Meeting W/Util in Rockville,Md to Discuss Plant Containment Penetration Bellows Tests.Draft Agenda Encl ML20126F5541992-12-0808 December 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Proposed License Amend to Change from Automatic to Manual Closure of Containment Purge & Exhaust Valves in Mode 6 ML20128C2071992-11-0606 November 1992 Notification of 921202 Meeting W/Util in Rockville,Md to Discuss Upcoming Refueling Outage Plans & Recent Plant Performance ML20127C4131992-07-24024 July 1992 Responds to 910322 Memo Requesting Assistance on Whether 10CFR50.59 Review Should Have Been Performed for Broken Pipe in Station Drainage & Discharge Sys Releasing low-level Radioactivity Onsite ML20059D2711990-08-0606 August 1990 Discusses Review of State of Oh & Local Radiological Emergency Response Plans.Determined That No Issues Identified During 890809-09 Exercise to Prevent Finding of Reasonable Assurance for Site ML20148T1891990-04-10010 April 1990 Responds to Request for Info Re Congressional Inquiries on Tracking & Closeout of Issues Raised Re Incident Investigation Team (IIT) Investigations of Plants.Actions Assigned by EDO in Response to Plant IITs Addressed ML20246N8091989-08-30030 August 1989 Notification of 890907 Meeting W/Util in Rockville,Md to Discuss Exemption from App R to 10CFR50 for Specific Configuration of Pressurizer Instrumentation ML20244A4611989-06-0606 June 1989 Notification of 890615 Meeting W/Util & Westinghouse Owners Group in Rockville,Md to Discuss Reactor Vessel Support Embrittlement ML20247B9481989-03-23023 March 1989 Notification of 890404 Meeting W/Util in Rockville,Md to Discuss Applicability of Test of Bunker Ramo Penetrations for Meeting Environ Qualification Requirements at Facility ML20195G8751988-11-25025 November 1988 Forwards Signed,Original Order Modifying License Issued to Util on 881121 for Transmittal to Fr for Publication.W/O Encl ML20206A1171988-11-0808 November 1988 Notification of 881117 Meeting W/Util in Rockville,Md to Discuss Proposed Fuel Enrichment Change Application ML20151U1241988-08-11011 August 1988 Forwards Fr Notice Extending Time for Comments on Request of Cleveland Electric Illuminating Co & Toledo Edison Co to Suspend Plant Antitrust License Conditions ML20151T3371988-08-0909 August 1988 Notification of 880817 Meeting W/Util in Rockville,Md to Discuss SER on ATWS Issued by Staff to Utils ML20151E1981988-07-14014 July 1988 Notification of 880721 Meeting W/Util in Rockville,Md to Discuss Licensee Response to Questions on Fire Protection Program ML20150E8851988-07-0707 July 1988 Notification of 880725 Meeting W/Util in Rockville,Md to Discuss Status of Refuel Outage & Configuration of Mgt Sys ML20151L9961988-06-16016 June 1988 Discusses Engineering Insp DRP-07 Re Safety Sys Outage Mod Involving Auxiliary Feedwater Sys.Insp Identified Several Instances of Inadequate Engineering Review.Addl Insp of Engineering Design Review Requested in Jul-Aug ML20195E5431988-06-10010 June 1988 Submits Status Summary Rept on Multi-Plant Action B-66, Natural Circulation Cooldown. Near-term OLs Should Not Be Added to Safety Issues Mgt Sys Listing for Subj Action ML20154R8651988-06-0808 June 1988 Requests That Encl Slides from 860627 Presentation to ACRS Re Maint Review at Facility Be Placed in PDR ML20148T0851988-06-0303 June 1988 Discusses Multiplant Action F-58,Items II.K.3.30 & II.K.3.31 Compliance w/10CFR50.46 ML20151N8041988-04-18018 April 1988 Notification of 880428 Meeting W/Util in Oak Harbor,Oh Re Technical Discussions Concerning Plant Control Ctr ML20151B7141988-04-0606 April 1988 Comments on Cj Papariello 880323 Memo Re Insp of Allegations at Plants.Significance of Allegations Low & Do Not Warrant Immediate Review & Closure ML20148E3191988-03-18018 March 1988 Notification of 880330 Meeting W/Util in Oak Harbor,Oh to Discuss SALP 6 Rept ML20150B9671988-03-11011 March 1988 Requests That Encl 870911 Memo from J Scinto Be Included in Docket Files.Memo Relates to 870122 Application for Amend to License NPF-3 Re Organization Changes ML20155K2001988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl1988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20236U6471987-11-27027 November 1987 Forwards Safety Evaluation Re Assessment of Errors in Util Analysis for Small Break Loca,Per 860718 Request.Incorrect Values Used in Analysis Result in Incomplete Compliance W/ 10CFR50,App K.Performance Requirements of 10CFR50.46 Met ML20153E9181987-11-16016 November 1987 Forwards Oct 1987 Significant Intergovernmental Activities & Issues Rept.Rept Represents Combined Efforts of NRC Regional State Liaison Officers,State,Local & Indian Tribes Programs Staff & Regional State Agreement Representatives ML20236A6081987-10-20020 October 1987 Notification of 871113 Meeting W/Util in Bethesda,Md to Discuss Util Reassessment of Programs,Priorities & Planned Fifth Refueling Outage Work Items ML20236A6171987-10-20020 October 1987 Notification of 871029 & 30 Meetings W/Util in Bethesda,Md to Discuss Facility Fire Protection Program ML20236A9711987-10-19019 October 1987 Forwards Biweekly Status Rept for 870926-1009 1999-03-26
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20205B6111999-03-26026 March 1999 Notification of 990419 Meeting with Util in Rockville,Md to Discuss Licensing Issues at Plant,Including Racking of Cask Pit for Storage of Spent Fuel ML20153F7981998-09-23023 September 1998 Forwards NRC Operator Licensing Exam Rept 50-346/98-301OL, (Including Completed & Graded Tests) for Tests Administered on 980803-07 ML20153F8291998-09-23023 September 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered During Wk of 980803 ML20236F3581998-06-26026 June 1998 Forwards NRC Insp Mc 0350, Staff Guidelines for Restart Approval, for Oversight Activities for Davis Besse Station ML20236N8641998-06-11011 June 1998 Discusses TS Interpretation on Application of Davis Besse TS 3.6.5.1 & 3.6.5.2.TB Branch Recommends That Davis Besse Consider Converting TS to Improved Standard TS ML20216F3291998-04-13013 April 1998 Accepts 980406 Licensee Request for Approval to Install machine-welded SG Tube Plugs in Accordance W/Provisions of Paragraph IWB-4230, Tube or Tubesheet Hole Plugging by Fusion Welding, of Section XI ML20202E6241997-11-26026 November 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Quality Assurance Program at Davis-Besse ML20211Q4711997-10-16016 October 1997 Notification of 971113 Meeting W/Toledo Edison Co in Rockville,Md to Discuss Ultimate Heat Sink at Davis-Besse ML20211C5091997-09-23023 September 1997 Forwards NRC Operator Licensing Exam Rept 50-346/97-308OL (Including as-given Writtem Exam) for Tests Administered on 970707-10 ML20211B5561997-09-23023 September 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970707-11 ML20149E7411997-07-16016 July 1997 Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Instrument Drift Study ML20137U2051997-04-14014 April 1997 Informs That Davis-Besse Nuclear Power Station Nuclear Assurance Dept Will Be Reorganized Into Two Separate Dept; DB Nuclear Assurance & DB Nuclear Support Svc,Effective, 970414 ML20136F9491997-03-13013 March 1997 Notification of 970403 Meeting W/Util in Rockville,Md to Discuss Progress on Thermo-Lag Issue Resolution ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134P9011996-11-26026 November 1996 Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec ML20149E8161994-08-0202 August 1994 Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination ML20059H8361994-01-19019 January 1994 Notification of 940201 Meeting W/Util in Rockville,Md to Discuss Pending Davis-Besse Licensing Actions ML20057F1311993-10-0707 October 1993 Notification of 931020 Meeting W/Util in Rockville,Md to Discuss Davis-Besse Implementation of Reg Guide 1.97 for Steam Generator Pressure Instruments ML20127N6121993-01-25025 January 1993 Notification of 920205 Meeting W/Util in Rockville,Md to Discuss Emergency Action Levels Proposed Rev,Submitted 930112 ML20127C0411993-01-0808 January 1993 Notification of 930112 Meeting W/B&W Owners Group in Clearwater Beach,Fl to Discuss Generic Program Plan for License Renewal Initiative ML20127F5461993-01-0707 January 1993 Notification of 930115 Meeting W/Util in Rockville,Md to Discuss Plant Containment Penetration Bellows Tests.Draft Agenda Encl ML20126F5541992-12-0808 December 1992 Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Proposed License Amend to Change from Automatic to Manual Closure of Containment Purge & Exhaust Valves in Mode 6 ML20128C2071992-11-0606 November 1992 Notification of 921202 Meeting W/Util in Rockville,Md to Discuss Upcoming Refueling Outage Plans & Recent Plant Performance ML20127C4131992-07-24024 July 1992 Responds to 910322 Memo Requesting Assistance on Whether 10CFR50.59 Review Should Have Been Performed for Broken Pipe in Station Drainage & Discharge Sys Releasing low-level Radioactivity Onsite ML20059D2711990-08-0606 August 1990 Discusses Review of State of Oh & Local Radiological Emergency Response Plans.Determined That No Issues Identified During 890809-09 Exercise to Prevent Finding of Reasonable Assurance for Site ML20148T1891990-04-10010 April 1990 Responds to Request for Info Re Congressional Inquiries on Tracking & Closeout of Issues Raised Re Incident Investigation Team (IIT) Investigations of Plants.Actions Assigned by EDO in Response to Plant IITs Addressed ML20246N8091989-08-30030 August 1989 Notification of 890907 Meeting W/Util in Rockville,Md to Discuss Exemption from App R to 10CFR50 for Specific Configuration of Pressurizer Instrumentation ML20244A4611989-06-0606 June 1989 Notification of 890615 Meeting W/Util & Westinghouse Owners Group in Rockville,Md to Discuss Reactor Vessel Support Embrittlement ML20247B9481989-03-23023 March 1989 Notification of 890404 Meeting W/Util in Rockville,Md to Discuss Applicability of Test of Bunker Ramo Penetrations for Meeting Environ Qualification Requirements at Facility ML20195G8751988-11-25025 November 1988 Forwards Signed,Original Order Modifying License Issued to Util on 881121 for Transmittal to Fr for Publication.W/O Encl ML20206A1171988-11-0808 November 1988 Notification of 881117 Meeting W/Util in Rockville,Md to Discuss Proposed Fuel Enrichment Change Application ML20151U1241988-08-11011 August 1988 Forwards Fr Notice Extending Time for Comments on Request of Cleveland Electric Illuminating Co & Toledo Edison Co to Suspend Plant Antitrust License Conditions ML20151T3371988-08-0909 August 1988 Notification of 880817 Meeting W/Util in Rockville,Md to Discuss SER on ATWS Issued by Staff to Utils ML20151E1981988-07-14014 July 1988 Notification of 880721 Meeting W/Util in Rockville,Md to Discuss Licensee Response to Questions on Fire Protection Program ML20150E8851988-07-0707 July 1988 Notification of 880725 Meeting W/Util in Rockville,Md to Discuss Status of Refuel Outage & Configuration of Mgt Sys ML20151L9961988-06-16016 June 1988 Discusses Engineering Insp DRP-07 Re Safety Sys Outage Mod Involving Auxiliary Feedwater Sys.Insp Identified Several Instances of Inadequate Engineering Review.Addl Insp of Engineering Design Review Requested in Jul-Aug ML20195E5431988-06-10010 June 1988 Submits Status Summary Rept on Multi-Plant Action B-66, Natural Circulation Cooldown. Near-term OLs Should Not Be Added to Safety Issues Mgt Sys Listing for Subj Action ML20154R8651988-06-0808 June 1988 Requests That Encl Slides from 860627 Presentation to ACRS Re Maint Review at Facility Be Placed in PDR ML20148T0851988-06-0303 June 1988 Discusses Multiplant Action F-58,Items II.K.3.30 & II.K.3.31 Compliance w/10CFR50.46 ML20151N8041988-04-18018 April 1988 Notification of 880428 Meeting W/Util in Oak Harbor,Oh Re Technical Discussions Concerning Plant Control Ctr ML20151B7141988-04-0606 April 1988 Comments on Cj Papariello 880323 Memo Re Insp of Allegations at Plants.Significance of Allegations Low & Do Not Warrant Immediate Review & Closure ML20148E3191988-03-18018 March 1988 Notification of 880330 Meeting W/Util in Oak Harbor,Oh to Discuss SALP 6 Rept ML20150B9671988-03-11011 March 1988 Requests That Encl 870911 Memo from J Scinto Be Included in Docket Files.Memo Relates to 870122 Application for Amend to License NPF-3 Re Organization Changes IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl1988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20155K2001988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20236U6471987-11-27027 November 1987 Forwards Safety Evaluation Re Assessment of Errors in Util Analysis for Small Break Loca,Per 860718 Request.Incorrect Values Used in Analysis Result in Incomplete Compliance W/ 10CFR50,App K.Performance Requirements of 10CFR50.46 Met ML20153E9181987-11-16016 November 1987 Forwards Oct 1987 Significant Intergovernmental Activities & Issues Rept.Rept Represents Combined Efforts of NRC Regional State Liaison Officers,State,Local & Indian Tribes Programs Staff & Regional State Agreement Representatives ML20236A6081987-10-20020 October 1987 Notification of 871113 Meeting W/Util in Bethesda,Md to Discuss Util Reassessment of Programs,Priorities & Planned Fifth Refueling Outage Work Items ML20236A6171987-10-20020 October 1987 Notification of 871029 & 30 Meetings W/Util in Bethesda,Md to Discuss Facility Fire Protection Program ML20236A9711987-10-19019 October 1987 Forwards Biweekly Status Rept for 870926-1009 1999-03-26
[Table view] |
Text
f
- (g UNITED STATES
! g NUCLEAR REGULATORY COMMISSION g :j WASHINGTON, D. C. 20555
% ,,.
- April 18, 1986 MEMORANDUM FOR: Aloert W. DeAgazio, Project Manager Project Directorate #6 Division of PWR Licensing-B FROM: Drew Persinko, Maintenance and Surveillance Engineer Maintenance and Training Branch Division of Human Factors Technology
SUBJECT:
SER INPUT ON DAVIS-BESSE MAINTENANCE PROGRAM Enclosed is the SER input resulting from the follow-up maintenance survey conducted at Davis-Besse on March 24-27, 1986. In addition to myself, members of the NRC team conducting the survey were as follows:
W. Guldemond, IE, RIII N. Choules, IE, RIII G. Dick, NRR R. Cooper, IE G. Barber, IE As agreed upon, this SER is largely an overview provided to meet your schedular needs. A more comprehensive SER will be forwarded to you in May.
_ uw 4~
l Drew Persinko, Maintenance and l
Surveillance Engineer Maintenance and Training Branch Division of Human Factors Technology
Enclosure:
As stated
[ cc: W. Russell F. Miraglia J. Partlow J. Stolz P. McKee
,, W. Guldemond, RIII L. Wheeler C. McCracken G. Barber G. Dick l N. Choules, RIII R. Cooper e7020 PDR g k $ $46PDR P
s
\ SER INPUT F0LLOW-UP MAINTENANCE SURVEY DAVIS-BESSE During the follow-up survey, the staff re-examined the areas of corporate commitment, spare parts / material readiness, supervision, preventive maintenance, maintenance backlog, maintenance procedures, communications, defined responsibilities and training. Also reviewed was the functioning of the planning and scheduling organization and the implementation of administrative procedures.
Considerable progress was made by the licensee in all areas except maintenance backlog since the last site visit. While some problem areas were noted, they were not considered to be major programmatic weaknesses and they did not appear to be affecting the functioning of the maintenance organization. Overall, the maintenance organization is considerably more established since the last visit and it appears to be functioning as designed. Particular strengths noted during the visit were in the areas of maintenance training and spare parts / material readiness.
The warehouse inventory has been completed and a computerized inventory tracking system as well as mechanical systems showing the status of parts is in place. The expediting / procurement process is obtaining the necessary parts to accommodate the field work. The staff noted that there does not appear to be a wealth of spare parts and that ultimately, the licensee must identify future inventory needs. Doing so would result in an orderly procurement and cause less reliance on expediting. Overall, good management techniques have been applied to the spare parts / material readiness area so that parts are now available to support field personnel.
The NRC team viewed the maintenance training facilities and spoke to maintenance trainers and to craft personnel who are receiving the training.
l The team did not, however, review the training program in the detail to which the staff currently reviews operations training. Construction of the maintenance training laboratories was in progress at the time of the last visit, whereas l
L
\
currently, the labs have been completed and appear to be well equipped. The training shift concept and the training council concept have been implemented and training of maintenance personnel is ongoing. A point to note is that management implemented the training shift concept during this outage rather than after restart which the team believes exemplifies management's commitment to the maintenance training program. The NRC team conveyed the importance of considering comments provided by the training councils because even the perception that the comments are not being considered would diminish the support of the crafts to the program.
The NRC team investigated the area of outstanding Maintenance Work Orders (MWO). Although a considerable number of MW0s have been completed, the i number of outstanding MW0s still remains high (approximately 3000) because new ones have been generated. However, not all MW0s are related to plant operability or plant safety (e.g., MWO to replace lock on circuit breaker cabinet). Consequently, rather than review absolute numbers of MW0s, the NRC team focused on the licensee's ability to manage and control the MW0s. It is the team's opinion that the licensee is able to effectively manage the open MW0s. All MW0s have been prioritized and a determination made as to whether completion of the MWO is necessary for restart. Region III, however, will continue to monitor the area of outstanding MW0s to assure continued control and progress. The team also reviewed approximately 1000 MW0s not scheduled for completion prior to restart to ascertain the licensee's compliance with -
the stated bases for making this detennination. This was done by reviewing i the titles of the MW0s and questioning those that potentially did not meet l
the MWO restart criteria. The vast majority of MW0s reviewed did conform l with the licensee's restart criteria. The team did question some items; however, the licensee was able to justify their dispositions in almost all j
cases. For those cases where the qualitative argument presented by the licensee did not satisfy the team, the licensee agreed to reconsider those l
i l
l
f I MW0s in detail for restart. This review of MW0s leads the team to conclude that the licensee is consistently complying with the stated bases for determining MW0s needed for restart. The team suggested that outstanding MW0s be considered on a system basis rather than solely on an item-by-item basis. Part of the reason for doing so was because there appeared to be several balance-of-plant systems with many MW0s not scheduled for completion prior to restart, which, if not operational, could affect plant operation.
The licensee stated that a limited review of MW0s on a systems basis had been done but that a more thorough review of this nature would be conducted.
In conclusion, considerable progress has been made by the licensee in the area of plant maintenance. The new maintenance organization is functioning I as designed with no major identifiable weaknesses. The few problem areas noted by the team were not considered major programmatic weaknesses and they did not appear to negatively affect the functioning of the maintenance organization.