Forwards Bnwl Final Trip Rept, Site Survey of Davis-Besse Maint Program & Practices, Conducted During Wk of 850916 for Transmittal to Licensee.Response Not Required Unless Factual Error Identified
ML20210K122
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/07/1986
From: Persinko D
Office of Nuclear Reactor Regulation
To: De Agazio A, Deagazio A
Office of Nuclear Reactor Regulation
Shared Package
ML20210K127 List:
References
NUDOCS 8604140486
Download: ML20210K122 (1)


Text

d

((

5

l g

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

%,*****/ April 7, 1986 MEMORANDUM FOR: Al DeAgazio, Project Manager PWR Project Directorate #6 Division of PWR Licensing-B FROM: Drew Persinko, Maintenance / Surveillance Engineer Maintenance and Training Branch Division of Human Factors Technology

SUBJECT:

TRIP REPORT FOR DAVIS-BESSE SITE SURVEY Enclosed is a copy of the final trip report written by our contractor, Pacific Northwest Laboratories, for the Davis-Besse site survey conducted during the week of September 16, 1985. Please transmit a copy of this report to the licensee. The licensee should be informed that the trip report describes the status of the plant maintenance program at the time of our visit and that a response is not required unless a factual error is identified.

Please send a copy of the transmittal letter to me so that we can reference it in our future reports.

I

_ - Lm &.]

Drew Persinko, Team Leader for Davis-Besse Site Survey cc: w/o enclosure G. Cwalina B. Grenier tr.