e Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402/536-4000 January 23, 1987 LIC-87-012 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Reference:
Docket No. 50-285
SUBJECT:
1987 Fort Calhoun Station Refueling Outage Gentlemen:
Pursuant to a request by Mr. D. E. Sells, information regarding major projects planned for the 1987 refueling outage of Fort Calhoun Station is provided.
Fort Calhoun Station will be shut down from the last week of February through mid May,1987 for refueling in preparation for Cycle 11 operation.
The following major projects are planned to be accomplished during the outage.
Ultrasonic testing of irradiated fuel to be reloaded into the Cycle 11 core and replacement or repair of bundles with leaking pins.
Replacement of some reactor coolant system loop isolation valves.
Steam generator tube inspection, secondary side sludge removal, and tube plugging, if necessary.
Replacement of diesel generator turbochargers.
)
Installation of pressurizer pressure transmitters and related wiring for i
diverse scram system.
Trip circuits will not be connected until NRC review and approval is received. Diverse scram system will not be operational until 1988 refueling outage.
Miscellaneous instrumentation upgrades.
Pressurizer spray valve and piping replacement and repair as necessary.
Raychem splice inspection.
870202 g 8 h h a5 h
g PDR A
PDR l
00 o
rw.
,m nom W ete-n.n
f U. S. Nuclear Regulatory Commission LIC-87-012 Page 2 ISI inspection of RV outlet nozzles and 87 examinations of supports and piping welds.
Cycle 11 reload analysis and revised technical specifications have been prepared and submitted to the NRC under separate cover.
The above listing of items represents OPPD's current plans for completing major efforts during our 1987 refueling outage.
Parts problems, manpower require-ments and schedule problems could modify or change this list.
Should you have any questions please do not hesitate to call.
Sincerely t' D R. L. Andrews Division Manager Nuclear Production RLA/me cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.