ML20212Q653

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-325/87-01 & 50-324/87-01 on 870105-08.No Violations or Deviations Identified
ML20212Q653
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/21/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20212Q654 List:
References
NUDOCS 8702020325
Download: ML20212Q653 (2)


See also: IR 05000324/1987001

Text

'

JAN 211937

Docket Nos. 50-325, 50-324

License Nos. DPR-71, DPR-62

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/87-01 AND 50-324/87-01

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. J. Ross on January 5-8, 1987. The inspection included a review of activities

authorized for your Brusnwick facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report

cc w/ encl: (See page 2)

.

8702020325 870121

PDR ADOCK 05000324

Q g

PDR w, ,

.

Carolina Power and Light Company 2

cc w/ encl:

P. W. Howe, Vice President

Brunswick Nuclear Project

C. R. Dietz, Plant General Manager

-bec w/ encl:

NRC Resident Inspector ,

Document Control Desk

State of North Carolina

ik

t JK e

l hDCollins

,

7oRPFredrickson

1/2t/87 1/ 87 144/87 1/2i/87