ML20212P577
| ML20212P577 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 02/27/1987 |
| From: | Guldemond W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Taylor J DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20212P581 | List: |
| References | |
| NUDOCS 8703160159 | |
| Download: ML20212P577 (2) | |
See also: IR 05000409/1986017
Text
q
p 3-
1L'
J,D
~
.:,,
.i
.t .
FEB 2 71987 -
,
Docket'No.' 50-409-
Dairyland Power Cooperative-
ATTN: Mr. -J. = W. Tay1or
-General Mana
2615 East Avenue - gerSouth
'La Crosse, WI 54601
Gentlemen:
This refers to the routine safety-inspection conducted by Mr. I. Villalva of
this office from December 6, 1986 through February 20, 1987, of activities at
the La Crosse Boiling Water Reactor authorized by NRC Operating License
No. DPR-45 and to the discussion of our findings with Messrs.
J. Parkyn and
G. Boyd and other members of your staff during the course of the inspections.
The enclosed cop
f our inspection report identifies areas examined during
the inspections.y oWithin these areas, the inspections consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
.In accordance with 10 CFR 2.790 of the Commission's regulations, a co)y of
this letter and the enclosed inspection report will be placed in the
iRC
Public Document Room.
We will gladly discuss any question you have concerning this inspection.
Sincerely,
g g g,sIGNEDBTU I'
W. G. Guldemond, Chief
ReactorProjectsBranch2
!
Enclosure: Inspection Re
' '
No. 50-409/86017(DRP) port
I
See Attached Distribution
@M EMo9
l
e
l
l
RII
RIII
ff d
11
)?
,
l
J
tw/ jaw
.' demond
I (
t
- - - ._
.
_ - - - -
- - - - .
-
_ _ _ - . - - - - - - ,
.
. --
,
.
c
,
. . I'
'Dairyland Power Cooperative
2
FEB 2 7.1987
a
. Distribution
.cc w/ enclosure:
J. Parkyn, Plant Superintendent
DCS/RSB(RIDS)
Licensing Fee Management Branch ~
Resident Inspector, RIII
Roby Bevan, NRR
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
-Comission
Spark Burmaster, Coulee
Region Energy Coalition
.
1
I
s
e
i