ML20212P267
| ML20212P267 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/20/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20212P270 | List: |
| References | |
| NUDOCS 8609030056 | |
| Download: ML20212P267 (2) | |
See also: IR 05000321/1986020
Text
C}ycM mk Grtf
.
WG g a 1986
Docket Nos. 50-321, 50-366
License Nos. OPR-57, NPF-5
/GeorgiaPowerCompany
V ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-321/86-20 AND 50-366/86-20)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. Holmes-Ray on July 1 - July 31,1986.
The inspection included a review of
activities authorized for your Hatch
facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, ard observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements. The violation, references to pertinent recuirements, and elements
to be included in your response are described in the enclosed Notice of Violation.
Your attention is invited to unresolved items identified in the inspection
report. With regard to the seismic qualification of the Unit I control rod
drive hydraulic control units addressed in paragraph 4 of the enclosed report,
please provide an evaluation as to the ability of the system to perform its
intended function under all the required postulated events with the missing
component parts.
These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
06090'30056 060020
{UR
ADOCK 0000032j
PDH
Te */
o
- \\
CG 2 919c6
,
,
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Luis A. Reyes /for
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
j cc w/encis:
V J. P. O'Reilly, Senior Vice President
Nuclear Operations
/J.T.Beckham,VicePresidentand
/ General Manager-Nuclear Operation
l
C. Nix, Site General Manager
V)f Fraser, Acting Site QA Supervisor
/
gl.Gucwa, Manager,NuclearSafety
and Licensing
,jbec w/encis:
V NRC Resident Inspector
V Hugh S. Jordan, Executive Secretary
Document Control Desk
State of Georgia
R I I ,,
RII
y
RII
R
7
7) k
60 cI,
[hl
Algn(atonis
V0rownlee
eyes
RCroteau:er
08/li/86
08// f/86
'
08//f/86
08/jo/86