ML20212N892
| ML20212N892 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/25/1986 |
| From: | Zimmerman S CAROLINA POWER & LIGHT CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 4029AWS, IEB-85-003, IEB-85-3, NLS-86-281, NUDOCS 8609020024 | |
| Download: ML20212N892 (1) | |
Text
-
DM8 ceaLL Carol [joMr & Light Company yid SERIAL: NLS-86-281
'dtil 2 51986 Dr. 3. Nelson Grace, Regional Administrator United States Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, GA 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1 - DOCKET NO. 50-400 M is SCHEDULE CHANGE FOR COMPLETION OF REQUIREMENTS'FROM t IE BULLETIN NO. 85-03 " MOTOR-OPERATED VALVE COMMON MADE FAILURES ;
pURING PLANT TRANSIENTS DUE TO_ IMPROPER SWITCH SETTINGS"-
Dear Dr. Grace:
On May 13,1986, Carolina Power & Light Company (CP&L) submitted a letter (NLS-86-164) to you which provided a schedule for the completion of action items required by IE Bulletin 85-03. This letter is to inform you of changes in the scheduling of two of these items.
CP&L intends to complete the evaluation of the tor.que switch settings (Action B of the Bulletin) and to complete the testing of Safety Injection System valves (Action C of the Bulletin) prior to fuel load for the Shearon Harris Nuclear Power Plant (SHNPP). These items had been originally scheduled for completion by July 25,1986 since this was the projected fuel load date at the time of our IEB 85-03 response submittal. As you are aware, fuel load for SHNPP will not occur on July 25,1986. CP&L is, however, committed to completing these two actions prior to the SHNPP fuel load.
The completion dates for other activities provided in the IEB 85-03 response remain unchanged by this submittal. Should any further changes in the IE Bulletin 85-03 completion schedule be warranted, you will be promptly notified.
If you have any questions regarding this submittal, please contact Mr. Arnold Schmich at (919) 836-8759.
Yours very truly, S. R.
imi erman A
ger Nuclear Licensing Section AWS/vaw (4029AWS) cc:
Mr. B. C. Buckley (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Wake County Public Library U.S. NRC - REGION I OFFICIAL COPY 8609020024 860725 PDR ADOCK 05000400 G
PDR 411 Fayetteville street
- P O Box 1551
- Raleign. N C. 27602 C T C f;^J TJ C 2.d Sf3J004m nA3f?ATaW663t I
fa/
_