Forwards Div of Compliance Insp Rept 50-323/69-02 on 691208- 09.Insp Severely Handicapped by Absence of Written, Definitive Program Describing Achievement of Adequate & Consistent Implementation of QA Program
ML20212N755
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 12/23/1969
From: Spencer G
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20212N718 List:
References
FOIA-86-585 NUDOCS 8608290141
Download: ML20212N755 (2)


Text

  • e e o 3 2.3 g >

.N 4

,y. . < . .

)-

Q. ,,

C.'..i.' *

,S 4.v5C' c44

, 'j., UNIT.ID STATES

. f* .s PE . 1 ATOMIC ENERGY CCMMISS!ON g , DIVIS!oN C7 CCMPl.!ANCE t #

  1. REcaca v

%rts et 2111 mANCRoFr WAY E:.~4K31. Y, CA1.1FC.%iA c4704 T-.se Sn.sm Cz7.658 Decc=bcr 23, 1969 S.W

. J. P. O'2e111y, Chief acactor Inapaction :nd Enforec=snt Erench Division of Conplicnce, Zacdquarter:

PACI:7IC CAS & 2CCOIC CO:Oll.C (DD2.0 CZ70N CIO l'O. 2) .

DC0r2 X0. 50-323 Oha attached report cf en initici quality surance in paction et tha subject facility on Docc=her 8-9, 1959 ic fora rded for infor=: tion. A post 7,? inspection =: sting 50 beca schedtiled uich 200 =:n: o=s:.c J for .~ennary 6, 1970

.m C 'NWL Q'., ' ,-

I feel that we were severely handicapped in our inspection effort by cha absence of a written, definitive progreu by PC Z doccribing in sufficient "U~ .

detail the r.eens by which adaquetc and consictent i= placentation of the QA 3.y' .

program, described in their P3AR, is to be achieved on en ovar:11 project basis. ..

In absence of a well documented overall program, we ettempted, through di cussions with hoy project personnel end revicu of li=ited documentation,

_ to obtain informatica rel: ting to how tha (?SAR) QA program is being incor-

"M) .

proccd and i=ple=cated by PC C. In so=a crc:s such es test centrol (Criterion XI) sud nonconforming =: tori:1 control (Critorion :W) va found v:itten

o. guidance to be insufficiently co=prehensivo and elecr. In the ::co of test control, an internal PCC instruction failed to cles 1y define ;;ho role of tho 2ngineering Depar = ant in reg:rd to the procparational test procr =,

. , . ,1 The P3AR in regard to this critorion ctates that," Completed tests vill bc V;'a ravicued by congniz:nt ensinocrs to ovalusto perforn:nco and tect adequacy.".

In the c:so of nonconfor=ing uncerial centrol, the desft proceduro thich vc reviewed did not spech to the =essurce which vero to be teken to prevent the inadvertent ucc of discrapent =:teri:1. Specifically, such cc:sures es idantific: tion, segreg tion or querentino ucro not included in the peccadure.

This proceduro did not cic rly dafine the rolo of the Engineering Depart = cat.

in the dinposition of nonconfor=ing m:teri:1. The PSAR statcc with rescrd to the uso of nonconicening t=tc;1:1, "If eccept:bic, the deviction vill be for= ally approved in writing by the c:anizant engineer."

6 w* e 8608290141 860826 PDR FOIA SHOLLYB6-585 PDR MJ e

. 4~

J..P. O'Reilly December 23, 1969 Much of the written material reisted to design activitics which.is described in the PSAR has not yet been developed. EcwcVer, PCC stated that this material will be included in the Quality Assurance Manual currently being written, t

In view of the lack of a formal, documented manual impicmenting the QA d'MM prograu described in the P3AR, it is recommended that the Diablo II quality assurance program be reinspected after the manual has been approved by PCC

. management.

In the interim, we will strongly urge PCE management to assign high priority to the task of documenting cicarly a program which will insure overall consistency 16 regard to the understanding and implementation of the quality

? assurance requirements for the Diablo Canyon project. In futuro cases it is suggested that the importanco of the Applicant's preparation of such a documented program be emphasized at as early a date as possible prior to our special QA inspection.

1.5, We note that the PG&E has applied for and been granted on exemption which dgG permits construction of that portion of the auxiliary building associated

].[f . with the Diablo Canyon, Unic No. 2 prior to issuance of a construction 4, .,;4 permit. The findings of the current inspection are applicabic to the design, "M; procurement and construction activitics currently in progress in regard to

b".jj the structure. ,

s.

I *

.a h

'*DA$i - G. S. Spencer Senior Reactor Inspector

Attachment:

CO Rpt. No. 323/69-2 by A. D. Johnson dtd 12-23-69 DISTRIBUTION:

E. G. Case

.; R. S. Boyd, DRL (2)

C S. Levine, D3L (6) 1! . D. J. Skovholt. DRL (3)

"9 L. Kornblich, Jr., CO:HQ .

. Regional Directors REG File .

O

\

e. ) 6, ,

- - - - - _ - - - - - . . , , - _ . . _ _ , , - , , , _ , , , , -_-_,,._,_7 ,, _ ,an ,

.,.-,,7_