Forwards Safety Evaluation Granting 860617 Request for Relief from Inservice Insp Hydrostatic Pressure Test Requirements for Second 10-yr Insp Interval.Relief Requests Re Inservice Testing Program Requirements Under Review
ML20212M090
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/20/1986
From: Varga S
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20212M095 List:
References
NUDOCS 8608250374
Download: ML20212M090 (2)


Text

. _

. 6

~

AUG 2 0 gggg DISTRIBUTION Docket Nos. 50-295 (DiiiiER'TTie ! J. Partlow and 50-304 PDf3'Rdg P N. Thompson NRC PDR J. Norris Local PDR C. Vogan T. Novak ACRS(10)

Mr. D. L. Farrar OGC-B Tech Branch Director of Nuclear Licensing E. Jordan Commonwealth Edison Company B. Grimes Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

ZION NUCLEAR F0WER STATION, UNITS 1 AND 2 - RELIEF FROM THE SECOND TEN-YEAR INSERVICE INSPECTION By letter dated June 17, 1986, Commonwealth Edison Company (CEC) submitted an updated set of relief requests for the inservice testing (IST) program and a single relief request for the inservice inspection (ISI) program for the second ten-year inspection interval at Zion Nuclear Power Station Units 1 and 2.

Enclosure 2 to the submittal contains Revision 2 of the Zion ISI/IST Second Interval Program which consists of the single ISI relief request. CEC requested relief from certain ISI hydrostatic pressure test requirements which had been determined to be impractical to perform at Zion Units 1 and 2. This relief pertains only to ISI. IST is still being evaluated.

We have reviewed your submittal and our review has determined that the code requirements for the specified systems are impractical and the granting of the relief is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility. Detailed technical assessment is contained in the enclosed Safety Evaluation. Based on our conclusion, pursuant to 10 CFR 50.55a(g)(6)(i), we grant the relief.

Please, also note that we have found a typographical error in the first sentence on page 141e of Enclosure 3 to your submittal.

Sincerely,

/

/5 Steven A. Varga, Director Project Directorate #3 Division of PWR Licensing-A

Enclosure:

As stated cc: See next page g.) .41 p/(6 PD#3 ef CVogan h3r JN'o s kC-B -

PQ#.

Sva"rda 8/ @/86 8/ /86 8/ /8d B/l)l/06 /1R 8608230374 860920 PDR ADOCK 05000295 G PDR

e a

4 Mr. D. L. Farrar Commonwealth Edison Company Zion Station cc:

Robert J. Vollen, Esquire Mr. i4ichael C. Parker, Chief 109 North Dearborn Street Division of Engineering Chicago, Illinois 60602 Illinois Department of Nuclear Safety Dr. Cecil Lue-Hing 1035 Outer Park Drive, 5th Floor Director of Research and Development Springfield, Illinois 62704

Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611

. Mr. Michael I. Miller L Isham, Lincoln and Beale F. Counselors at Law

'F Three First National Plaza L Sist Floor g3 Chicago, Illinois 60602 I Susan N. Sekuler Esquire Assistant Attorney General Environmental Control Division 1 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Mayor of Zion Zion, Illinois 60099 9

4 b Illinois Department of Nuclear Safety

,[ ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive, 5th Floor Springfield. Illinois 62704 U.S. Nuclear Regulatory Comission

Resident Inspectors Office

, i 105 Shiloh Blvd. .

!' Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137 a

-.-m. -

-.----.,.--..-,----,...,,_._,...n --,-r ---.----------.-----,--,--,--ev---- - - - - - - . .-..--,nw- n ym-- -