ML20212M066

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re 850731,1108 & 860307 Requests for Changes to Tech Specs 6.5 & 6.8 Concerning Administrative Controls & Tech Spec 4.8.2.1.1a.3 on Electrolyte Leakage.Response Requested within 60 Days
ML20212M066
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/15/1986
From: Jabbour K
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8608250365
Download: ML20212M066 (3)


Text

,

c' Docket Nos.: 50-413 and 50-414 Mr. H. B. Tucker, Vice President Nuclear Production Department 15 AUG 1986 Duke Power Company 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

SUBJECT:

REQUEST FOR. ADDITIONAL INFORMATION ON ADMINISTRATIVE CONTROLS AND ELECTROLYTE LEAKAGE - CATAWBA NUCLEAR STATION, UNITS 1 AND 2 By letter dated July 31, 1985, supplemented by letters dated November 8, 1985, and March 7,1986, you requested, among other things, Technical Specifications (TS) changes for TS 6.5 and 6.8 concerning Administrative Controls and TS 4.8.2.1.la.3) concerning Electrolyte Leakage.

The staff has reviewed your request and finds that additional infonnation, identified in the enclosure, is needed for completion of its review.

Your response to.the enclosure is requested within 60 days from the date of this letter.

Please contact me at (301) 492-7367 if you have questions regarding the enclosure or are unable to meet the requested response date.

Sincere Kahtan N. Jabbour, Project Manager PWR Project Directorate #4 Division of PWR Licensing-A

Enclosure:

As stated cc: w/ enclosure See Next Page DISTRIBUTION:

F DocRet t11e '

MDuncan

" NRC PDR KJabbour Local PDR ACRS (10) l PD#4 Rdg.

LCrocker BJYoungblood VBenaroya 0GC/Beth JLazevnicky EJordan FRosa BGrimes JPartlow NThomps

  • See Previous Concurrence ND,dn[4]DPWR-A PW8 F08/DPWR-A EICSB PWR /DPWR-A PWR# DPWR-A cn
  • VBenaroya
  • FRosa BJYoungblood KJabbour:lh 08/[g/86 08// /86 08/

/86 08/ /86 08//5/86 8608250365 860015

~

PDR ADOCK 05000413 P

POR

[i

/

Mr. H. B. Tucker Duke Power Company Catawba Nuclear Station cc:

William L. Porter, Esq.

North Carolina Electric Membership Duke Power Company Corp.

1 P.O. Box 33189 3333 North Boulevard Charlotte, North Carolina 28242 P.O. Box 27306 Raleigh, North Carolina 27611 J. Michael McGarry, III, Esq.

Bishop, Liberman, Cook, Purcell Saluda River Electric Cooperative, and Reynolds Inc.

1200 Seventeenth Street, N.W.

P.O. Box 929 Washington, D. C.

20036 Laurens, South Carolina 29360 North Carolina MPA-1 Senior Resident Inspector Suite 600 Route 2, Box 179N 3100 Smoketree Ct.

York, South Carolina 29745 P.O. Box 29513 Raleigh, North Carolina 27626-0513 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, Mr. C. D. Markham 101 Marietta Street, NW, Suite 2900 Power Systems Division Atlanta, Georgia 30323 Westinghouse Electric Corp.

P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health NUS Corporation South Carolina Department of Health 2536 Countryside Boulevard and Environmental Control Clearwater, Florida 33515 2600 Bull Street Columbia, South Carolina 29201 County Manager of York County York County Courthouse Karen E. Long York South Carolina 29745 Assistant Attorney General N.C. Department of Justice Richard P. Wilson, Esq.

P.O. Box 629 Assistant Attorney General Raleigh, North Carolina 27602 S.C. Attorney General's Office i

P.O. Box 11549 Spence Perry, Esquire Columbia, South Carolina 29211 Associate General Counsel Federal Emergency Management Agency Piedmont Municipal Power Agency Room 840 100 Memorial Drive 500 C Street l

Greer, South Carolina 29651 Washington, D. C.

20472 Mark S. Calvert, Esq.

Mr. Michael Hirsch Bishop, Liberman, Cook, Federal Emergency Management Agency Purcell & Reynolds Office of the General Counsel 1200 17th Street, N.W.

Room 840 Washington, D. C.

20036 500 C Street, S.W.

Washington, D. C.

20472 Brian P. Cassidy, Regional Counsel Federal Emergency Management Agency, l

Region I i

J. W. McCormach POCH l

Boston, Massachusetts 02109

[J e.

Enclosure REQUEST FOR ADDITIONAL INFORMATION CATAWBA NUCLEAR STATION 00CKETS 50-413/414 1.

Administrative Controls (a) Describe the qualification requirements for the position of Superintendent of Station Services.

(b) Justify your statement in the July 31, 1985, submittal that the Operating, Technical Services, Maintenance, and Integrated Scheduling Superintendents have the same qualifications in view of their different functions and responsibilities.

(c) Clarify your statement in the July 31, 1985, submittal that the Operating, Technical Services, Maintenance, and Integrated Scheduling Superintendents each have the same authority.

2.

Electrolyte Leakage Your justification for deletion of the requirement to check for electrolyte leakage in Surveillance Requirement 4.8.2.1.la.3) is based on the surveillances already required for battery cell electrolyte level in Table 4.8-3.

However, the staff's concern, as given in section 8.3.2 of the Catawba SER (page 8-11, second full paragraph), was that the electrolyte leakage might cause a dis-charge path through the metal battery rack which would go undetected on the de system ground detection because the racks are ungrounded. The staff recognizes that both the concerns for maintaining battery electrolyte level and discharging a cell could be alleviated by making the checks called for in Table 4.8-3, Category A, of the Catawba Technical Specifications. These checks, however, are only required on the battery pilot cells which may not be the cells that are leaking. Duke Power should, therefore, identify what surveillances are available to ensure a leaking battery cell is still operable or propose a change that would call for perfonning the Table 4.8-3, Category A, surveillances on any cell that shows signs of electrolyte leakage.

Considera-tion, however, should always be given to replacing a leaking battery cell, regardless of the results of such a surveillance, to ensure the continuing availability of the battery.

.__