ML20212L907
| ML20212L907 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1986 |
| From: | Neron G, Romberg W NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| MP-9714, NUDOCS 8701290429 | |
| Download: ML20212L907 (7) | |
Text
.
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-336 UNIT Millstone 2 DATE 11/14/86 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Ext. 4417 MONTH OCTOBER 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
-13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
8701290429 861031 PDR ADOCK 05000336 R
PDR M N of,
OPERATING DATA REPORT DOCKET NO. 50-336 DATE 11 n 4 f an COMPLETED BY G. Neron TELEPHONE (203) 447-1791 Ext. 4417 OPERATING STATUS 1.
Unit Name:
Millstone Unit 2 Notes Items 21 and 22 cumulative 2.
Reporting Period: October, 1986 are weighted averages.
3.
Licensed Thermal Power (MWt):
2700 Unit operated at 2560 4.
Nameplate Rating (Gross MWe):
909 MW Thermal prior to its 5.
Design Electrical Rating (Net MWe):
870 uprating to the current 6.
Maximum Dependable Capacity (Gross MWe):
866.25 2700 MW Thermal Power 7.
Maximum Dependable Capacity (Net MWe):
833.25 Level.
8.
If Changes Occur in Capacity Ratings (Items Number 3.Through 7)
Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Pericd 744 7296 95112 12.
Number Of Hours Reactor Was Critical 0
6192.9 68730.6 13.
Reactor Reserve Shutdown Hours 0
0 2205.5 14.
Hours Generator On-Line 0
6058.7 64776.4 15.
Unit Reserve Shutdown Hours 0
0 468.2 16.
Gross Thermal Energy Generated (MWH) 0 16147799 164251601 17.
Gross Elec. Energy Generated (MWH) 0 5219000 53560479 18.
Net Electrical Energy Generated (MWH)
(-2051) 5022159 51343378 19.
Unit Service Factor 0
83.0 68.1 20.
Unit _ Availability Factor 0
83.0 68.6 21.
Unit Capacity Factor (Using MDC Net) 0 82.6 63.7 22.
Unit Capacity Factor (Using DER Net) 0 79.1 62.7 23.
Unit Forced Outage Rate 0
2.4 16.2 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Unit 2 is currently in its cycle 8 Refueling and Maintenance Outage.
25.
If Shut Down At End Of Report Period, Estimated Date of Startup: December 19,1986 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
DOCKET NO. 50-336 UNIT SHUTDOWNS AND POWER REDUCTIONS
. UNIT NAME Millstone 2
'DATE 11/14/a6
~
' COMPLETED BY G. Neron REPORT MONTH Odtober 1986
' TELEPHONE (203) 447-1791 Ext. 4417 l
2 No.
Date Type Duration Reason Method of Licensee Systeg' Compogent Cause & Corrective' (Hours)
Shutting Event Code Code A.ction to 3
Down Reactor Report #
Prevent Recurrence 1
5 09 20-86 S
744 C
1 N/A N/A N/A Continuation of Refueling and Maintenance Outage from previous month.
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination 5-Power Reduction 5 previous month F-Administrative
~~
G-Operational Error (Explain)
(Duration = 0)
Exhibit 1 - Same Source H-Other (Explain) 9-Other (Explain)
/
mmmmm=
Docket No. 50-336 Date 11/14/86~
Unit Name Millstone 2 Completed By G. Neron Telephone (203) 447-1791 Ext. 4417 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQllIPMENT REPORT MONTH October 1986 l
DATE SYSTEM COMPONENT MAINTENANCE ACTION 10/13/86 Process and Area CTMT Air Particulate Rad Replaced HVS-72 Card and Detector-Radiation Monitoring Monitor Loop Probe.
10/29/86 Reactor Protection Wide Range Drawer RPS-B Repaired Amplifier Assembly-t i
i i
i 7
o1 Docket No. 50-336 Date:
11/14/86 I
Completed By: G. Neron Telephone: (203) 447-1791 Ext. 4417 REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 2 2.
Scheduled date for next refueling shutdown:
Currently.in end of cycle 7 refueling / maintenance outage.
3.
Schedule date for restart following refueling: December 1986 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N_g 5.
Scheduled date(s) for submitting licensing action and supporting information:
Two Technical Specification change requests related to the Reactor Coolant System Flow Rate were submitted on October 24, 1986 and October 27, 1986. The Technical Specification change request to revise 10CFR50, Appendix G. Heat Up and Cooldown Curves, was submitted on October 20, 1986.
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes. in fuel design, new operating procedures:
None 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core:
217 (b) 512 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested i
or is planned, in number of fuel assemblies:
Currently 1112 The 1112 available locations reflects the re-racked Spent Fuel Pool.
The re-racking of the Unit 2 Spent Fuel Pool has been completed.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
l 1994, Spent Fuel Pool, Fuel Core off load capacity is reached.
1998, Core Full, Spent Fuel Pool.
These numbers are based on the recently re-racked Spent Fuel Pool.
DOCKET NO. 50-336 UNIT SHUTDOWNS'AND POWER REDUCTIONS UNIT NAME Millstone 2' '
DATE 11/14/86 p,
REVISED COMPLETED BY G. Neron a
REPORT MONTH September 1986 TELEPHONE.(203) 447-1791 Ext. 4417 l
2 No.
Date Type Duration Reason Method of Licensee.
Systeg Compop Cause &' Corrective
, Code,ent (Hours)
Shutting Event-Code Action to 3
Down Reactor Report #
. Pre' vent Recurrence 4
09-3-86 F
25.8 A
3 LER #006 SM PSF-While operating at 100%
power, the reactor auto -
matically tripped on. low steam generator level as a result of. loss'of heater drains flow.
The loss'of flow was due to a failed fitting connection resulting in heater drain valve closure.
See LER.
5 09-20-86 S
255.8 C
1 N/A N/A
- N/A Unit end of cycle 7 l
shutdown for refueling and maintenance activities.
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation'of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination previous month F-Administrative 5-Power' Reduction 5 G-Operational Error (Explain)
(Duration = 0)
Exhibit 1 - Same Source H-Other (Explain) 9-Other (Explain)
o a
h.
NIfTILITIES cenerei Omc.. seioen street. seriin. Connecticut s'$5I EE=
s P.O. BOX 270 mo a aa* * **
HARTFORD. CONNECTICUT 06141-0270 L
L J C",;l'7ll17,"~m (2033 665-sa0 November 14, 1986 MP-9714 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
Facility Operating License No. DPR-65 Docket No. 50-336
Dear Sir:
This letter is forwarded to provide the report of cperating and shutdown experience relating to Millstone Unit 2 Monthly Operating Report 86-10 in accordance with Appendix A Technical Specifications, Section 6.9.1.3.
One additional copy of the report is enclosed.
Also attached is a revision for the September 1986 Operating Report, Unit Shutdowns and Power Reductions Page.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY N0lb W. D. Romberg Station Superintendent Millstone Nuclear Power Station WDR/GN: rg cc:
Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)
U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555
/ab
@