ML20212L181

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1986
ML20212L181
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 10/31/1986
From: Patrick Boyle, Fitzpatrick E
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
EEF-86-507, NUDOCS 8701290353
Download: ML20212L181 (8)


Text

-

r.

E i

BRAIDWOOD NUCLEAR PCWER STATION UNIT 1 MONTHLY PERFORMANCE REPORT I

COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-456 LICENSE NO. NPF-59 r

8701290353 861031 PDR ADOCK 05000456 R PDR (3942z) hh il

I. Monthly Report for Braidwood Unit 1 A '. Sumary of Operating Experience for Unit 1 During this- reporting period, Braidwood Unit I loaded 146 fuel j assemblies into the core. A few days later, on November 3,1986 all 193 fuel assemblies were loaded into the core.

l I

l-l-

L (3942z)

B. OPERATING DATA REPORT- DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 10/05/86 COMPILED BY: P. A. Boyle TELEPHONE: (815)458-2801 OPERATING STATUS

1. Reporting Period: October 1986 Gross Hours: 336 (Oct 17-31)
2. Currently Authorized Power Level (MWt): 0 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120

-Max Dependable Capacity (MWe-net): 0

3. Power level to which restricted (If Any): 0 (MWe-gross)
4. Reasons for restriction (If Any)* Low power testing license has not been received yet.

THIS MONTH YR TO DATE CUMULATIVE

5. Report period Hours: 336 336 336
6. Hours Reactor Critical: 0 0 0
7. RX Reserve Shutdown Hours: 0 0 0
8. Hours Generator on Line: 0 0 0
9. Unit Reserve Shutdown Hours: __

0 0 0

10. Gross Thermal Energy (MWH): 0 0 0
11. Gross Elec. Energy (MWH): 0 0 0
12. Net Elec. Energy (MWH): 0 0 0
13. Reactor Service Factor: 0 0 0
14. Reactor Availability Factor: 0 0 0
15. Unit Service Factor: 0 0 0
16. Unit Availability Factor: 0 0 0
17. Unit Capacity Factor (MDC net): 0 0 0
18. Unit Capacity Factor (DER net): 0 0 0
19. Unit Forced Outage Hours: 0 0 0
20. Unit Forced Outage Rate: 0 0 0
21. Shutdowns Scheduled Over Next 6 Months: N/A N/A N/A
22. If Shutdown at End of Report Period, Estimated Date of Startup: 2-1-87 N/A N/A _,
23. Units in Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED Initial Criticality 2-01-87 Initial Electricity 3-05-87 Commercial Operation 5-31-87 (39422)

C. AVERAGE DAILY UNIT NET POWER LEVEL LOG DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 11/05/86 COMPILED BY: P. A. Boyle TELEPHONE: (815)458-2801 MONTH: Octobee, 1986

1. 0 17. 0
2. 0 18. 0
3. 0 19. 0
4. 0 20. _

0

5. 0 21. 0 4 6. 0 22. O
7. 0 23. 0
8. 0 24. 0
9. 0 25. 0
10. 0 26. 0
11. 0 27. 0
12. 0 28. 0
13. 0 29. 0
14. 0 30. 0
15. 0 31. 0
16. O INSTRUCTIONS On this form list the average daily unit power level in MWE-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 1003." line (or the restricted power level line). In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

1 (3942z)

D. UNIT SHUTDOWNS / REDUCTIONS DOCKET NO.: 50-456 UNIT: Braidwood 1

DATE
11/05/86 COMPILED BY: P. A. Boyle TELEPHONE: (815)458-2801 REPORT PERIOD: October 1986 4

d

. No DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE i

j N/A PRECRITICAL PERIOD J

SUMMARY

1 oo...............

j TYPE REASON METHOD ' SYSTEM & COMPONENT F-Forced A-Equipment Failure Maint or Test 1 - Method Exhibit F & H S-Scheduled C-Refueling 2 - Manual Scram Instructions for Preparation of D-Regulatory Restriction 3 - Auto Scram Data Entry Sheet

! E-Operator Training & License Examination 4 - Continued Licensee Event Report.

l F-Administration 5 - Reduced Load (LER) File (NUREG-0161)

! G-Oper Error 9 - Other H-Other l

a (3942z)

w

.O .

E. UNIQUE REPORTING REQUIREMENTS

1. Safety / Relief valve operations for Unit One.

VALVES NO & TYPE PLANT DESCRIPTION

, DATE ACTUATED ACTUATION . CONDITION OF EVENT None

2. Licensee generated changes to ODCM. (Y/N)

No i

s 6

i f

(3942z)

F. LICENSEE EVENT REPORTS The following is a tabular summary of all Licensee Event Reports for Braidwood Nuclear Power Station, Unit One, submitted during the reporting period,

, October 17 through October 31, 1986. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR50.73.

Licensee Event Report Number Date Title of Occurrence None (3942z)

EEF/86-507 File: AGNC-14

  1. D Commonwoalth Edison

[ n ) Braidwood Nuclear I '

RoutX1, Box 84 - Power Station v Braceville, Illinois 60407 Telephone 815/458-2001 November 10, 1986 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk

Gentlemen

1-Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station. for the period October 17 through October 31, 1986.

Very truly yours, f.

E. E. Fitz trick Station Manager Braidwood Nuclear Power Station EEF/PAB/skg (3942z/0063z) cc: J. G. Keppler, NRC, Region III NRC Resident Inspector Braidwood Gary Wright, Ill. Dept. of Nuclear Safety D. P. Galle i- T. J. Maiman

. D. L. Farrar Nuclear Fuel Services, PWR Plant Support L. Anastasia, Station Nuclear Engineering INPO Records Center Thermal Group, Tech Staff Braidwood Station <

f Nuclear Group, Tech Staff Braidwood Station

. J. Stevens - USNRC P. L. Barnes P. A. Boyle 4

  • ,Y .

I\

,__ _ _ , _ . . . _ _ _ - - . _ _ . - - _ _ _ - . , _ . _ _ . . _ _ . . , , . _ , _ . . . _ _ _ . _ . . _ . - _ . . , _ _ _ . _ _ _ , _ . . _ . _ . . _ . _ _ . . _ . , _ , _ _ _ _ , . _ _ . _ . _ _ _ _ .