ML20212K904
| ML20212K904 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/01/1999 |
| From: | Collins S NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20212K909 | List: |
| References | |
| NUDOCS 9910070092 | |
| Download: ML20212K904 (4) | |
Text
m cP*%g go 4
UNITED STATES g
Ij NUCLEAR REGULATORY COMMISSION E
WASHINGTON, D.C. 20555-0001 49 * * * * *,o FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURG CITY OF NEW SMYRNA BEACH AND UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO S_EMINOLE ELECTRIC COOPERATIVE. INC.
CITY OF TALLAHASSEE DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERAT'NG PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.189 License No. DPR-72 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Ficrida Power Corporation et al. (the licensees),
dated December 29,1998, as supplemented June 18,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can j
be conducted without endangering the health and safety of the public and (ii) that such activities will be conducted in compliance with the Commission's regulations; j
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and 1
E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9910070092 991001 l
PDR ADOCK 05000302 l
P PDR I
F;
}
, 2.. Accordingly, the Operating License is amended as indicated in the attachment to this i
license amendment.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COiAMISSION amue J.
irector Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License Date of issuance: October 1,1999 l
O
r,
' a' i
~
ATTACHMENT TO LICENSE AMENDMENT NO.189 _
TO FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 -
Replace the following page of Operating License No. DPR-72 with the attached page: The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
Remove Paae Insert Pace 1
1 l
~
[(f **c%[o, UM r f D STATES 7i NUCLEAR REGULATORY COMMISSION c
g e
WASHINGTON, D C. 20555
%[,,,,*
FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE 4
CITY OF KISSIMMff I
CITY OF LEESBURG CITY OF NEW SMYRNA BEACH AND UTILITIES COMMISSION. CITY OF NEW SMYRNA BEACH CITY OF OCALA
)
i ORLANDO UTillTIES COMMISSION AND CITY OF ORLANDO SEMIN0LE ELECTRIC COOPERATIVE. INC.
DOCKET N0. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT i
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 2 l
License No. DPR-72 1.
The Nuclear Regulatory Commission (the Commission) having found that:
A.
The application filed by Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimmee, City of !.eesburg, City of New Smyrna Beach and Utilities Comission, City of New Smyrna Beach, City of Ocala, Orlando Utilities Comission and City of Orlando, Sebring Utilities Comission*'*(Seminole Electric Cooperative, Inc., and City of Tallahasse( the licensees) as supplemented by letter dated December 9,1976, complie; with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I;
'B.
Construction of the Crystal River Unit 3 Nuclear Generating Plant (facility) has been substantially completed in conformity with j
Provisional Construction Permit No. CPPR-51 and the application, as amended, the provisions of the Act and the rules and regulations of the Comission; C.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission;
- As of the effective date of Amendment No.140
, Sebring Utilities Comission is no longer-a licensee under this license.
- As of the effective date of Amendment No.189, the City of Tallahassee is no longer a licensee under this license.
AMENDMMr No.189