ML20212G387
| ML20212G387 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/29/1997 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M98728, NUDOCS 9711060157 | |
| Download: ML20212G387 (2) | |
Text
.
y""5 p
UNITED STATES g
}
NUCLEAR REGULATORY COMMISSION e
t WASHINGTON, D.C. 206sW001 s.,...../
October 29,1997 MEMORANDUM FOR:
- Docket File -
FROM:
Peter S. Tam, Senior Project Manager Project Directorate 11-2
/
- Division of Reactor Project.,- 1/II g
Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA UNIT 1 -IMPLEMENTATION OF AMENDMENT 162 TO OPERATING LICENSE (TAC M98728)
The attached page, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment 162 on October 15,1997.
Docket Numbers 50-413 Distribution Docket file
'I PUBLIC
'f i
H. Berkow 0FDl fSC FRE CENTm enm7
~
9711060157 971029 PDR ADOCK 05000413 P
PDR ll ll llll lll]llll llll
4 Nuclear Policy Manual Yektme 2 NSD Appendix D. 221. Irnplementation Sheet APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET FACILITY OPERATING LICENSE /IECHNICAL SPECIFICATIONS AMENDMENT IMPLI3fCNTATION SilEET CNS O MNS C ONS UNU NO.
10203 N'+.l.1 l
TS NO.
DATE RECEIVED lDN lo f 37 AMENDMENT. NO. -llol DESCRIPTION Rem cm e +e e/w<.1 c4 ht s~~ h ma a x-.m nm.Jl od -ht cL 4
- 1. IMPLEMENT T10N DATES 3
A. NRC ISSUE DATE (Dete of NRC Cover 1. otter):
1O *)})7 B. NRC EFFECTIVE DATE (From Text of NRC letter):ID 9 / S 7 C. STATION IMPLEMENTATION (& ' = h. T'.C ""_5 D=):
Ii
'l
- ) 7
- 2. PLANT NOTIFICATION Mt! alt der A
s i
Via E Ma3 Diuribution; include Site Techrucal Contacts Bh' Prt impicmentation Items (!! ems 15)
- 3. RGC TECHNICAL CONTENT REVIEW CRITERI A O
A. AB Dix:repancms Have Been Resolved Via NRC Interface.
O B. No inadvertent Changes Were Made To TS Sheets involved.
K C. TS Change Was issued Requested By DPC.
TECHNICAL REVIEWER:
E_'_d2 M O)I 7
(Ust Discrcoarmes On Attached Page)
{
Date CHECKED BY: Mg 10 15 @
(Ust Dncrepancies Obttached Page)
Date
- 4. PIP NUMRER (if generatod):
I - C l3'? - 3 h 3 y 5. O ALL CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPLE1ED Uf A VERIFIED BY:
bb I O,I(b Regulatory Compliance Date M I M PlP M - As s'h. -w b 64M N 1. W paw d'"e5-h, VI5 % O G o aA..c be % m,ida 4 4' g 6 C$ W WP "-* %
T w g ~ - 6 c a % r ui.dLeJ % 6 ' -9M %n pic s a s w Mc.N
._ i; %,
p~~ w. m. ~ 4 % rs < - w.
l (M JUN 1997)
'old3 ;
D.221 27 goot 33NVI'lago3 xuoivT m38 tettttstos Iva 90 t m wu/01