Confirms Mgt Meeting on 860808 W/Util at Plant Site to Discuss Operational Events,Per 860722 Telcon.Proposed Agenda Encl
ML20212C651
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/01/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8608120111
Download: ML20212C651 (4)


Text

n AUG 01 1986 b

'ke Power Company TTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - CATAWBA UNITS 1 AND 2, DOCKET NOS. 50-413 AND 50-414 This confirms the telephone co'nversation between Mr. J. W. Hampton of Duke Power Company and Mr. T. A. Peebles of my staff and Mr. K. N. Jabbour of NRC, NRR on July 22, 1986, concerning a management meeting to be conducted at the Catawba Nuclear Station on August 8, 1986 at 9:00 a.m.

We requested this meeting to discuss the operational events of the units since licensing. A proposed meeting agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, Origin 'l R :M by R.D.' lares J. Nelson Grace Regional Administrator

Enclosure:

Proposed Meeting Agenda cp w/ encl:

id. W. Hampton, Station Manager cc w/ enc 1:

K, N. Jabbour, NRR WRC Resident Inspector Document Control Desk State of South Carolina RII RII/

/

RII RII RII 4&

A r'

Tpeales VBrownlee eyes alke C

w 8///86 8/[/86 8/or/86

/[/86

/ / /86 I

8608120111 860001 PDR ADOCK 05000413 E%S

,j'

ENCLOSURE PROPOSED MEETING AGENDA Duke Power Company Meeting With NRC-August 8, 1986, at 9:00 a.m.

I. Opening Remarks H. B. Tucker R. D. Walker II. Introduction to Performance Indicators M. Caruso Specific data for Catawba III. Licensee Presentation Duke Power Representatives A.

Operating History of Units Regulatory History B.

Operational Events Unit 1 Primary Leakage Fuse Issues Unit 2 Testing Unit 2 Steam Generator Level Control C.

Comparison to Similar Nuclear Stations D.

Local Feedback of Operations Operator Training McGuire/ Catawba E.

Reactor Trip Review Process IV. Closing Remarks R. D. Walker

)

I

. = _.

o-o4Q AUG 01 1986 C'

k Duke Power Company

/ ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - CATAWBA UNIT 2, DOCKET N0. 50-414 This confirms the telephone conversation between Mr. N. A. Rutherford of Duke Power and Mr. V. Brownlee of my staff on July 25, 1986, concerning an enforcement conference to be conducted at the Region II office on August 11, 1986 at 1:00 p.m.

We requested this meeting to discuss our findings relative to the event of June 27, 1986, at Unit 2.

A proposed meeting agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, OfiG IC;l L i..:A b;j ?,,D,;,' ];;cy b

J. Nelson Grace Regional Administrator

Enclosure:

Proposed Meeting Agenda cc w/ encl:

VJ. W. Hampton, Station Manager bec w/ encl:

J. N. Jabbour, NRR WRC Resident Inspector Document Control Desk State of South Carolina e

RII $

RII RII g RI RI eyes alk r M

C urger:Jw TPeebles VBrownlee 7/J//86 8/ / /86 8/ /86 8// /86 8// /86 r/l/N

\\\\

\\ -E45

t-e l-i ENCLOSURE i

PROPOSED MEETING AGENDA Duke Power Company Meeting With NRC August 11, 1986, at 1:00 p.m.

i I. Opening Remarks R. D. Walker

.II. Issues of Concern Duke Power l

Representatives l'

A.

Discussion of events of June 27, 1986, concerning the transient begun during the i

Unit 2 Loss of Control Room Test.

1 B.

Discussion of subsequent actions taken i

}

prior to restart of the Unit 2.

4 III. Closing Remarks R. D. Walker.