Text
o Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402/536 4000 February 26, 1987 LIC-87-076 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Letter OPPD (R. L. Andrews) to NRC (J. R. Miller) dated April 1, 1985 (LIC-85-135) 3.
Letter OPPD (R. L. Andrews) to NRC (E. J. Butcher) dated June 15, 1985 (LIC-85-233) 4.
Letter OPPD (R. L. Andrews) to NRC (E. J. Butcher) dated August 15, 1985 (LIC-85-373) 5.
Letter NRC (E. J. Butcher) to OPPD (R. L. Andrews) dated October 17, 1985 6.
Letter OPPD (R. L. Andrews) to NRC (A. C. Thadani) dated December 17, 1985 (LIC-85-571) 7.
Letter OPPD (R. L. Andrews) to NRC (A. C. Thadani) dated January 28, 1986 (LIC-86-025)
Gentlemen:
SUBJECT:
Detailed Control Room Design Review (DCRDR) Summary Report Supplement The detailed Control Room Design Review Summary Report (Reference 2) outlined several studies that needed to be completed in order to close out DCRDR.
These studies were:
Labeling, Demarcation, Color Coding, and Meter Banding a
a Human Factors Maintenance Plan Annunciator Upgrade a
Safety Parameter Display System a
Plant Specific E0P Task A.1alysis a
Reference 5 contained the Safety Evaluation Report (SER) documenting the Commission's review of our Detailed Control Room Design Review Summary Report.
Reference 2.
The Commission indicated in the SER that they did not intend to continue their review until the studies to which OPPD had committed had been completed.
The NRC further requested that results of the studies be combined into a submittal that integrated the required information.
0703030630 870006 P Dif ADUCK 05000005 Y\\
l'
('DU n.o n e mpion,n..n ri oppononiru
s U. S. Nuclear Regulatory Commission LIC-87-076 Page 2 Reference 5 also identified additional information be provided to enable the NRC to complete their review. The requested information included:
Finalized proposals for correcting human engineering discrepancies (HEDS) a Proposed implementation schedules for correcting HEDs e
Justifications for not correcting or partially correcting safety a
significant HEDs.
Reference 7 provided OPPD's schedule for completing the studies and a time line for completing the CRDR activities.
Please find attached our integrated supplemental report which includes the summary results of the studies and the requested information.
If you have questions, please contact me.
Sincerely, G..$. W A h~
R. L. Andrews Division Manager Nuclear Production RLA/me Attachment c:w/ encl.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.
Washington, DC 20036 W. A. Paulson, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector c/wo encl.
J. E. Gagliardo, NRC Director Reactor Projects Branch A. C. Thadani, NRC Project Director
,,..........,